Simei St 1 — recent transacted prices and indicative value
99-year lease · 59.2 years remaining · 43 addresses
Simei St 1 has 59.2 years of lease remaining. Latest recorded sale 1 Oct 2026.
The median price at Simei St 1 over the last 12 months was S$6,548 psm, from 69 recorded sales between Dec 2025 and Oct 2026, with most between S$6,198 psm and S$6,881 psm. This is an indicative figure from recorded transactions, not a formal valuation.
From 69 sales between Dec 2025 and Oct 2026 · 25th to 75th percentile S$6,198 psm to S$6,881 psmLatest recorded sale 1 Oct 2026
How has the price at Simei St 1 changed?
The median price at Simei St 1 has risen 47.3% from S$4,504 psm in Q1 2017 to S$6,633 psm in Q4 2026. This reflects recorded transactions and is not a formal valuation.
How accurate is this estimate for Simei St 1?
We re-ran the estimate as of Q1 2026 on what was known at the time, then compared it with the 61 sales in Simei St 1 since.
- Median error
- 2.7%
Half the estimates came closer than this to what the home actually fetched, half missed by more.
Value a unit here
Starts with this address. Type another address or postal code in this project to value that one.
Primary schools within 1 km of Simei St 1
Measured from each school's land to this project's buildings, the way MOE bands P1 priority. MOE measures to the building's outline, so near 1 km check OneMap's School Query.
- Changkat Primary School · 47 m · near the line — check on OneMap
- Chongzheng Primary School · 461 m · 41 of 43 buildings within 1 km · near the line — check on OneMap
- Yumin Primary School · 461 m · 41 of 43 buildings within 1 km · near the line — check on OneMap
- East Spring Primary School · 665 m · 18 of 43 buildings within 1 km · near the line — check on OneMap
What does a unit at Simei St 1 rent for?
A flat like this at Simei St 1 rents for about S$3,500 a month, the middle of 92 HDB rental approvals in the last year. That is a gross yield of 6.86% on the indicative value. Indicative, from recorded rents.
What this flat earns against what it costs, set beside what homes like it earn.
6.86% gross yield
S$42,000 of rent a year against the estimate above · 0.18 points above flats like it
Homes like this rent for about S$3,500 a month, the middle of 92 approvals in the last year.
Across Singapore, flats of this type with 60 to 69 years of lease left yield 6.68%, from 62 blocks. This town has too few such blocks to measure on its own.
A yield above the mark means the flat rents well for what it costs, which can point to a keen rental patch or a price the sales alone have not caught up with. Below it, buyers are paying for something a tenant will not, such as the address itself.
Recent rental approvals used
| Approved | Block | Flat | Rent a month |
|---|---|---|---|
| Sept 2026 | 256 | 4 ROOM | S$3,900 |
| Sept 2026 | 106 | 4 ROOM | S$3,750 |
| Sept 2026 | 256 | 4 ROOM | S$3,700 |
| Sept 2026 | 148 | 4 ROOM | S$3,700 |
| Sept 2026 | 148 | 4 ROOM | S$3,600 |
| Sept 2026 | 113 | 4 ROOM | S$3,600 |
| Sept 2026 | 151 | 4 ROOM | S$2,600 |
| Sept 2026 | 122 | 4 ROOM | S$2,000 |
median of 92 HDB rental approvals for 4 ROOM on Simei St 1 since 2025-11.
Get new sales by email
We'll email you when a new sale is filed at Simei St 1. At most one email a week for this project, and only when something sold.
We use your address only to send this alert, and nothing else. Unsubscribe in one click from any email.
What flat types sell at Simei St 1?
- 3 ROOM23 sales
- 4 ROOM439 sales
- 5 ROOM384 sales
- EXECUTIVE18 sales
Blocks in Simei St 1
- Blk 101 Simei St 1
- Blk 102 Simei St 1
- Blk 105 Simei St 1
- Blk 106 Simei St 1
- Blk 107 Simei St 1
- Blk 108 Simei St 1
- Blk 109 Simei St 1
- Blk 110 Simei St 1
- Blk 111 Simei St 1
- Blk 112 Simei St 1
- Blk 113 Simei St 1
- Blk 114 Simei St 1
- Blk 116 Simei St 1
- Blk 117 Simei St 1
- Blk 119 Simei St 1
- Blk 120 Simei St 1
- Blk 122 Simei St 1
- Blk 123 Simei St 1
- Blk 124 Simei St 1
- Blk 126 Simei St 1
- Blk 127 Simei St 1
- Blk 128 Simei St 1
- Blk 129 Simei St 1
- Blk 130 Simei St 1
- Blk 131 Simei St 1
- Blk 132 Simei St 1
- Blk 133 Simei St 1
- Blk 134 Simei St 1
- Blk 135 Simei St 1
- Blk 136 Simei St 1
- Blk 137 Simei St 1
- Blk 138 Simei St 1
- Blk 139 Simei St 1
- Blk 148 Simei St 1
- Blk 149 Simei St 1
- Blk 150 Simei St 1
- Blk 151 Simei St 1
- Blk 153 Simei St 1
- Blk 154 Simei St 1
- Blk 253 Simei St 1
- Blk 254 Simei St 1
- Blk 255 Simei St 1
- Blk 256 Simei St 1
Nearest projects
- Simei St 5 · 375 m · 77 sales
- Simei St 2 · 506 m · 96 sales
- Simei St 4 · 555 m · 213 sales
- Tampines St 11 · 667 m · 485 sales
- Tampines St 22 · 779 m · 803 sales
Buying or selling here?
Buying: Stamp duty · Cash and CPF needed · How much can I borrow · Monthly repayment.
Selling: Net proceeds from selling.
What has sold at Simei St 1 recently?
| Date | Detail | Area | Price | Per area |
|---|---|---|---|---|
| Oct 2026 | Blk 148 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 123 sqm | S$815,888 | S$6,633 psm |
| Sept 2026 | Blk 107 · 5 ROOM · 01 TO 03 · Improved · 61 years left | 122 sqm | S$725,000 | S$5,943 psm |
| Sept 2026 | Blk 102 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 122 sqm | S$728,000 | S$5,967 psm |
| Sept 2026 | Blk 255 · 5 ROOM · 01 TO 03 · Improved · 69 years left | 119 sqm | S$828,800 | S$6,965 psm |
| Sept 2026 | Blk 135 · 4 ROOM · 04 TO 06 · Simplified · 61 years left | 84 sqm | S$560,000 | S$6,667 psm |
| Sept 2026 | Blk 128 · EXECUTIVE · 01 TO 03 · Maisonette · 60 years left | 145 sqm | S$950,000 | S$6,552 psm |
| Sept 2026 | Blk 127 · 4 ROOM · 01 TO 03 · Simplified · 60 years left | 84 sqm | S$550,000 | S$6,548 psm |
| Sept 2026 | Blk 150 · 4 ROOM · 10 TO 12 · Simplified · 60 years left | 84 sqm | S$610,000 | S$7,262 psm |
| Aug 2026 | Blk 112 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 123 sqm | S$750,000 | S$6,098 psm |
| Aug 2026 | Blk 137 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 122 sqm | S$768,000 | S$6,295 psm |
| Aug 2026 | Blk 136 · 4 ROOM · 04 TO 06 · Simplified · 61 years left | 84 sqm | S$568,000 | S$6,762 psm |
| Aug 2026 | Blk 148 · 4 ROOM · 04 TO 06 · Simplified · 61 years left | 84 sqm | S$550,000 | S$6,548 psm |
| Aug 2026 | Blk 131 · 4 ROOM · 10 TO 12 · Model A · 61 years left | 104 sqm | S$688,000 | S$6,615 psm |
| Aug 2026 | Blk 101 · 4 ROOM · 01 TO 03 · Model A · 61 years left excluded: outlier | 104 sqm | S$608,000 | S$5,846 psm |
| Aug 2026 | Blk 134 · 4 ROOM · 07 TO 09 · Simplified · 61 years left | 84 sqm | S$550,000 | S$6,548 psm |
| Aug 2026 | Blk 106 · 4 ROOM · 07 TO 09 · Model A · 61 years left | 104 sqm | S$655,000 | S$6,298 psm |
| Aug 2026 | Blk 253 · 4 ROOM · 10 TO 12 · Model A · 69 years left | 101 sqm | S$720,000 | S$7,129 psm |
| Aug 2026 | Blk 108 · 4 ROOM · 10 TO 12 · Model A · 61 years left | 104 sqm | S$650,000 | S$6,250 psm |
| Aug 2026 | Blk 154 · 4 ROOM · 01 TO 03 · Simplified · 61 years left excluded: outlier | 84 sqm | S$515,000 | S$6,131 psm |
| Aug 2026 | Blk 129 · 4 ROOM · 01 TO 03 · Simplified · 60 years left | 88 sqm | S$606,000 | S$6,886 psm |
| Aug 2026 | Blk 109 · 4 ROOM · 07 TO 09 · Model A · 61 years left | 104 sqm | S$643,000 | S$6,183 psm |
| Aug 2026 | Blk 132 · 3 ROOM · 01 TO 03 · Simplified · 61 years left | 64 sqm | S$460,000 | S$7,188 psm |
| Jul 2026 | Blk 105 · EXECUTIVE · 01 TO 03 · Maisonette · 61 years left | 146 sqm | S$950,000 | S$6,507 psm |
| Jul 2026 | Blk 122 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 123 sqm | S$735,000 | S$5,976 psm |
| Jul 2026 | Blk 102 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 122 sqm | S$783,558 | S$6,423 psm |
| Jul 2026 | Blk 117 · 4 ROOM · 10 TO 12 · Model A · 61 years left | 103 sqm | S$658,000 | S$6,388 psm |
| Jul 2026 | Blk 254 · 4 ROOM · 10 TO 12 · Model A · 69 years left | 99 sqm | S$730,000 | S$7,374 psm |
| Jul 2026 | Blk 107 · 4 ROOM · 01 TO 03 · Model A · 61 years left | 104 sqm | S$630,000 | S$6,058 psm |
| Jul 2026 | Blk 132 · 4 ROOM · 01 TO 03 · Simplified · 61 years left | 84 sqm | S$575,000 | S$6,845 psm |
| Jul 2026 | Blk 123 · 4 ROOM · 04 TO 06 · Model A · 61 years left | 104 sqm | S$653,000 | S$6,279 psm |
| Jun 2026 | Blk 135 · 5 ROOM · 07 TO 09 · Improved · 61 years left excluded: outlier | 123 sqm | S$830,888 | S$6,755 psm |
| Jun 2026 | Blk 117 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 121 sqm | S$750,000 | S$6,198 psm |
| Jun 2026 | Blk 122 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 122 sqm | S$700,000 | S$5,738 psm |
| Jun 2026 | Blk 130 · 4 ROOM · 07 TO 09 · Simplified · 61 years left | 84 sqm | S$590,000 | S$7,024 psm |
| Jun 2026 | Blk 129 · 4 ROOM · 01 TO 03 · Simplified · 60 years left | 84 sqm | S$590,000 | S$7,024 psm |
| May 2026 | Blk 106 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 122 sqm | S$753,000 | S$6,172 psm |
| May 2026 | Blk 107 · 5 ROOM · 01 TO 03 · Improved · 62 years left | 122 sqm | S$665,000 | S$5,451 psm |
| May 2026 | Blk 150 · 5 ROOM · 01 TO 03 · Improved · 61 years left | 122 sqm | S$725,000 | S$5,943 psm |
| May 2026 | Blk 126 · 5 ROOM · 01 TO 03 · Improved · 61 years left | 122 sqm | S$700,000 | S$5,738 psm |
| May 2026 | Blk 154 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 122 sqm | S$775,000 | S$6,352 psm |
| May 2026 | Blk 123 · 4 ROOM · 07 TO 09 · Model A · 62 years left | 104 sqm | S$670,000 | S$6,442 psm |
| May 2026 | Blk 139 · 3 ROOM · 01 TO 03 · Simplified · 61 years left | 64 sqm | S$450,000 | S$7,031 psm |
| Apr 2026 | Blk 150 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 122 sqm | S$738,000 | S$6,049 psm |
| Apr 2026 | Blk 120 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 128 sqm | S$760,000 | S$5,938 psm |
| Apr 2026 | Blk 138 · 5 ROOM · 10 TO 12 · Improved · 61 years left | 122 sqm | S$750,000 | S$6,148 psm |
| Apr 2026 | Blk 254 · 4 ROOM · 07 TO 09 · Model A · 69 years left | 99 sqm | S$720,000 | S$7,273 psm |
| Apr 2026 | Blk 109 · 4 ROOM · 04 TO 06 · Model A · 62 years left | 104 sqm | S$657,000 | S$6,317 psm |
| Mar 2026 | Blk 255 · 5 ROOM · 10 TO 12 · Improved · 70 years left | 118 sqm | S$888,000 | S$7,525 psm |
| Feb 2026 | Blk 113 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 122 sqm | S$695,000 | S$5,697 psm |
| Feb 2026 | Blk 253 · 5 ROOM · 04 TO 06 · Improved · 70 years left | 119 sqm | S$800,000 | S$6,723 psm |
| Feb 2026 | Blk 112 · 5 ROOM · 10 TO 12 · Improved · 61 years left | 122 sqm | S$788,000 | S$6,459 psm |
| Feb 2026 | Blk 106 · 4 ROOM · 07 TO 09 · Model A · 62 years left | 104 sqm | S$710,000 | S$6,827 psm |
| Feb 2026 | Blk 117 · 4 ROOM · 07 TO 09 · Simplified · 61 years left | 84 sqm | S$600,000 | S$7,143 psm |
| Feb 2026 | Blk 133 · 4 ROOM · 10 TO 12 · Simplified · 62 years left | 84 sqm | S$588,000 | S$7,000 psm |
| Feb 2026 | Blk 127 · 4 ROOM · 07 TO 09 · Simplified · 61 years left | 84 sqm | S$610,000 | S$7,262 psm |
| Feb 2026 | Blk 119 · 4 ROOM · 04 TO 06 · Model A · 61 years left | 104 sqm | S$718,000 | S$6,904 psm |
| Feb 2026 | Blk 132 · 3 ROOM · 04 TO 06 · Simplified · 61 years left | 64 sqm | S$435,000 | S$6,797 psm |
| Jan 2026 | Blk 126 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 123 sqm | S$750,000 | S$6,098 psm |
| Jan 2026 | Blk 114 · 5 ROOM · 10 TO 12 · Improved · 61 years left | 121 sqm | S$755,000 | S$6,240 psm |
| Jan 2026 | Blk 126 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 121 sqm | S$770,000 | S$6,364 psm |
| Jan 2026 | Blk 135 · 5 ROOM · 10 TO 12 · Improved · 62 years left | 121 sqm | S$752,000 | S$6,215 psm |
| Jan 2026 | Blk 134 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 84 sqm | S$578,000 | S$6,881 psm |
| Jan 2026 | Blk 106 · 4 ROOM · 04 TO 06 · Model A · 62 years left | 104 sqm | S$640,000 | S$6,154 psm |
| Jan 2026 | Blk 137 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$531,000 | S$6,321 psm |
| Dec 2025 | Blk 105 · EXECUTIVE · 01 TO 03 · Maisonette · 61 years left | 146 sqm | S$960,000 | S$6,575 psm |
| Dec 2025 | Blk 116 · 5 ROOM · 04 TO 06 · Improved · 62 years left | 121 sqm | S$800,000 | S$6,612 psm |
| Dec 2025 | Blk 253 · 5 ROOM · 04 TO 06 · Improved · 70 years left | 122 sqm | S$828,888 | S$6,794 psm |
| Dec 2025 | Blk 112 · 4 ROOM · 07 TO 09 · Simplified · 61 years left | 84 sqm | S$570,000 | S$6,786 psm |
| Dec 2025 | Blk 149 · 4 ROOM · 07 TO 09 · Simplified · 61 years left | 84 sqm | S$590,000 | S$7,024 psm |
| Dec 2025 | Blk 138 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$580,000 | S$6,905 psm |
| Dec 2025 | Blk 133 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 88 sqm | S$595,000 | S$6,761 psm |
| Dec 2025 | Blk 102 · 4 ROOM · 04 TO 06 · Model A · 62 years left | 104 sqm | S$663,000 | S$6,375 psm |
| Nov 2025 | Blk 116 · 5 ROOM · 04 TO 06 · Improved · 62 years left | 122 sqm | S$748,000 | S$6,131 psm |
| Nov 2025 | Blk 123 · 5 ROOM · 01 TO 03 · Improved · 62 years left | 121 sqm | S$768,000 | S$6,347 psm |
| Nov 2025 | Blk 124 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 122 sqm | S$730,000 | S$5,984 psm |
| Nov 2025 | Blk 253 · 5 ROOM · 07 TO 09 · Improved · 70 years left | 119 sqm | S$878,000 | S$7,378 psm |
| Nov 2025 | Blk 137 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$540,000 | S$6,429 psm |
| Nov 2025 | Blk 123 · 4 ROOM · 04 TO 06 · Model A · 62 years left | 104 sqm | S$678,000 | S$6,519 psm |
| Nov 2025 | Blk 139 · 3 ROOM · 04 TO 06 · Simplified · 61 years left | 64 sqm | S$450,000 | S$7,031 psm |
| Oct 2025 | Blk 101 · 5 ROOM · 04 TO 06 · Improved · 62 years left | 122 sqm | S$740,000 | S$6,066 psm |
| Oct 2025 | Blk 126 · 4 ROOM · 04 TO 06 · Simplified · 61 years left | 84 sqm | S$568,000 | S$6,762 psm |
| Oct 2025 | Blk 122 · 4 ROOM · 04 TO 06 · Model A · 61 years left | 103 sqm | S$650,000 | S$6,311 psm |
| Oct 2025 | Blk 148 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 88 sqm | S$588,000 | S$6,682 psm |
| Sept 2025 | Blk 131 · 5 ROOM · 07 TO 09 · Improved · 62 years left | 121 sqm | S$788,000 | S$6,512 psm |
| Sept 2025 | Blk 131 · 5 ROOM · 01 TO 03 · Improved · 62 years left | 128 sqm | S$722,000 | S$5,641 psm |
| Sept 2025 | Blk 114 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 122 sqm | S$735,000 | S$6,025 psm |
| Sept 2025 | Blk 101 · 4 ROOM · 10 TO 12 · Model A · 62 years left | 104 sqm | S$680,000 | S$6,538 psm |
| Sept 2025 | Blk 117 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 84 sqm | S$580,000 | S$6,905 psm |
| Aug 2025 | Blk 130 · 5 ROOM · 10 TO 12 · Improved · 61 years left | 123 sqm | S$810,000 | S$6,585 psm |
| Aug 2025 | Blk 114 · 5 ROOM · 01 TO 03 · Improved · 62 years left | 122 sqm | S$690,000 | S$5,656 psm |
| Aug 2025 | Blk 127 · 4 ROOM · 07 TO 09 · Simplified · 61 years left | 84 sqm | S$583,000 | S$6,940 psm |
| Aug 2025 | Blk 123 · 4 ROOM · 01 TO 03 · Model A · 62 years left | 104 sqm | S$645,000 | S$6,202 psm |
| Jul 2025 | Blk 154 · 5 ROOM · 07 TO 09 · Improved · 62 years left excluded: outlier | 122 sqm | S$835,000 | S$6,844 psm |
| Jul 2025 | Blk 130 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 121 sqm | S$785,000 | S$6,488 psm |
| Jul 2025 | Blk 123 · 4 ROOM · 01 TO 03 · Model A · 62 years left | 104 sqm | S$660,000 | S$6,346 psm |
| Jul 2025 | Blk 138 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 88 sqm | S$580,000 | S$6,591 psm |
| Jul 2025 | Blk 138 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 88 sqm | S$584,000 | S$6,636 psm |
| Jul 2025 | Blk 110 · 4 ROOM · 01 TO 03 · Model A · 62 years left | 108 sqm | S$676,000 | S$6,259 psm |
| Jul 2025 | Blk 256 · 4 ROOM · 01 TO 03 · Model A · 70 years left excluded: outlier | 101 sqm | S$623,000 | S$6,168 psm |
| Jun 2025 | Blk 134 · 5 ROOM · 07 TO 09 · Improved · 62 years left | 122 sqm | S$695,000 | S$5,697 psm |
| Jun 2025 | Blk 117 · 5 ROOM · 04 TO 06 · Improved · 62 years left | 123 sqm | S$741,888 | S$6,032 psm |
| Jun 2025 | Blk 107 · 5 ROOM · 07 TO 09 · Improved · 63 years left | 122 sqm | S$758,000 | S$6,213 psm |
| Jun 2025 | Blk 124 · 5 ROOM · 07 TO 09 · Improved · 62 years left | 123 sqm | S$745,000 | S$6,057 psm |
| Jun 2025 | Blk 112 · 4 ROOM · 04 TO 06 · Model A · 62 years left | 103 sqm | S$663,000 | S$6,437 psm |
| Jun 2025 | Blk 148 · 4 ROOM · 10 TO 12 · Model A · 62 years left | 103 sqm | S$662,500 | S$6,432 psm |
| Jun 2025 | Blk 149 · 4 ROOM · 10 TO 12 · Simplified · 62 years left | 88 sqm | S$610,000 | S$6,932 psm |
| Jun 2025 | Blk 123 · 4 ROOM · 07 TO 09 · Model A · 63 years left | 104 sqm | S$670,000 | S$6,442 psm |
| Jun 2025 | Blk 117 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 84 sqm | S$625,000 | S$7,440 psm |
| Jun 2025 | Blk 135 · 4 ROOM · 04 TO 06 · Model A · 62 years left | 103 sqm | S$653,000 | S$6,340 psm |
| May 2025 | Blk 106 · 4 ROOM · 04 TO 06 · Model A · 62 years left | 104 sqm | S$672,000 | S$6,462 psm |
| May 2025 | Blk 123 · 4 ROOM · 10 TO 12 · Model A · 63 years left | 104 sqm | S$675,000 | S$6,490 psm |
| May 2025 | Blk 124 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$570,000 | S$6,786 psm |
| May 2025 | Blk 119 · 4 ROOM · 07 TO 09 · Model A · 62 years left | 104 sqm | S$695,000 | S$6,683 psm |
| May 2025 | Blk 126 · 4 ROOM · 01 TO 03 · Simplified · 62 years left | 84 sqm | S$563,000 | S$6,702 psm |
| Apr 2025 | Blk 150 · 5 ROOM · 04 TO 06 · Improved · 62 years left | 122 sqm | S$735,000 | S$6,025 psm |
| Apr 2025 | Blk 134 · 5 ROOM · 10 TO 12 · Improved · 62 years left | 122 sqm | S$718,000 | S$5,885 psm |
| Apr 2025 | Blk 253 · 4 ROOM · 04 TO 06 · Model A · 71 years left | 101 sqm | S$700,000 | S$6,931 psm |
| Apr 2025 | Blk 148 · 4 ROOM · 01 TO 03 · Simplified · 62 years left | 84 sqm | S$572,000 | S$6,810 psm |
| Apr 2025 | Blk 106 · 4 ROOM · 04 TO 06 · Model A · 63 years left | 104 sqm | S$678,000 | S$6,519 psm |
| Mar 2025 | Blk 109 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 122 sqm | S$720,000 | S$5,902 psm |
| Mar 2025 | Blk 106 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 122 sqm | S$726,888 | S$5,958 psm |
| Mar 2025 | Blk 255 · 4 ROOM · 01 TO 03 · Model A · 71 years left | 101 sqm | S$715,000 | S$7,079 psm |
| Mar 2025 | Blk 130 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 84 sqm | S$580,000 | S$6,905 psm |
| Mar 2025 | Blk 133 · 4 ROOM · 10 TO 12 · Simplified · 63 years left | 88 sqm | S$570,000 | S$6,477 psm |
| Mar 2025 | Blk 136 · 4 ROOM · 04 TO 06 · Simplified · 63 years left | 84 sqm | S$570,000 | S$6,786 psm |
| Mar 2025 | Blk 149 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$590,000 | S$7,024 psm |
| Feb 2025 | Blk 117 · 5 ROOM · 07 TO 09 · Improved · 62 years left | 122 sqm | S$728,888 | S$5,974 psm |
| Feb 2025 | Blk 119 · 5 ROOM · 04 TO 06 · Improved · 62 years left | 122 sqm | S$775,000 | S$6,352 psm |
| Feb 2025 | Blk 116 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 128 sqm | S$730,000 | S$5,703 psm |
| Feb 2025 | Blk 124 · 5 ROOM · 10 TO 12 · Improved · 62 years left | 122 sqm | S$739,888 | S$6,065 psm |
| Feb 2025 | Blk 253 · 5 ROOM · 04 TO 06 · Improved · 71 years left | 119 sqm | S$808,888 | S$6,797 psm |
| Feb 2025 | Blk 154 · 5 ROOM · 01 TO 03 · Improved · 62 years left | 122 sqm | S$750,000 | S$6,148 psm |
| Feb 2025 | Blk 112 · 4 ROOM · 10 TO 12 · Model A · 62 years left | 103 sqm | S$646,000 | S$6,272 psm |
| Feb 2025 | Blk 123 · 4 ROOM · 01 TO 03 · Model A · 63 years left | 104 sqm | S$620,000 | S$5,962 psm |
| Feb 2025 | Blk 149 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$623,000 | S$7,417 psm |
| Feb 2025 | Blk 122 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 84 sqm | S$570,000 | S$6,786 psm |
| Feb 2025 | Blk 112 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$565,000 | S$6,726 psm |
| Feb 2025 | Blk 108 · 4 ROOM · 04 TO 06 · Model A · 62 years left | 104 sqm | S$660,000 | S$6,346 psm |
| Feb 2025 | Blk 148 · 4 ROOM · 01 TO 03 · Simplified · 62 years left | 84 sqm | S$560,000 | S$6,667 psm |
| Feb 2025 | Blk 109 · 4 ROOM · 10 TO 12 · Model A · 63 years left | 104 sqm | S$680,000 | S$6,538 psm |
| Feb 2025 | Blk 109 · 4 ROOM · 07 TO 09 · Model A · 63 years left | 104 sqm | S$700,000 | S$6,731 psm |
| Feb 2025 | Blk 153 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$604,888 | S$7,201 psm |
| Feb 2025 | Blk 136 · 4 ROOM · 04 TO 06 · Simplified · 63 years left | 84 sqm | S$560,000 | S$6,667 psm |
| Feb 2025 | Blk 126 · 4 ROOM · 04 TO 06 · Model A · 62 years left | 103 sqm | S$645,000 | S$6,262 psm |
| Jan 2025 | Blk 254 · 5 ROOM · 07 TO 09 · Improved · 71 years left | 118 sqm | S$888,000 | S$7,525 psm |
| Jan 2025 | Blk 138 · 5 ROOM · 04 TO 06 · Improved · 63 years left | 122 sqm | S$712,000 | S$5,836 psm |
| Jan 2025 | Blk 153 · 5 ROOM · 04 TO 06 · Improved · 63 years left | 122 sqm | S$720,000 | S$5,902 psm |
| Jan 2025 | Blk 148 · 5 ROOM · 01 TO 03 · Improved · 62 years left | 121 sqm | S$700,000 | S$5,785 psm |
| Jan 2025 | Blk 149 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 84 sqm | S$600,000 | S$7,143 psm |
| Jan 2025 | Blk 137 · 4 ROOM · 07 TO 09 · Simplified · 63 years left | 84 sqm | S$563,000 | S$6,702 psm |
| Jan 2025 | Blk 153 · 4 ROOM · 10 TO 12 · Simplified · 63 years left | 84 sqm | S$615,000 | S$7,321 psm |
| Dec 2024 | Blk 112 · 5 ROOM · 07 TO 09 · Improved · 62 years left | 121 sqm | S$800,000 | S$6,612 psm |
| Dec 2024 | Blk 123 · 4 ROOM · 04 TO 06 · Model A · 63 years left | 104 sqm | S$640,000 | S$6,154 psm |
| Dec 2024 | Blk 106 · 4 ROOM · 01 TO 03 · Model A · 63 years left | 104 sqm | S$604,888 | S$5,816 psm |
| Nov 2024 | Blk 111 · EXECUTIVE · 01 TO 03 · Maisonette · 62 years left | 146 sqm | S$940,888 | S$6,444 psm |
| Nov 2024 | Blk 130 · 5 ROOM · 07 TO 09 · Improved · 62 years left | 121 sqm | S$810,000 | S$6,694 psm |
| Nov 2024 | Blk 154 · 5 ROOM · 10 TO 12 · Improved · 62 years left | 122 sqm | S$765,000 | S$6,270 psm |
| Nov 2024 | Blk 117 · 5 ROOM · 04 TO 06 · Improved · 63 years left | 123 sqm | S$765,000 | S$6,220 psm |
| Nov 2024 | Blk 117 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 123 sqm | S$700,000 | S$5,691 psm |
| Nov 2024 | Blk 134 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 121 sqm | S$665,000 | S$5,496 psm |
| Nov 2024 | Blk 133 · 4 ROOM · 10 TO 12 · Simplified · 63 years left | 88 sqm | S$585,000 | S$6,648 psm |
| Nov 2024 | Blk 148 · 4 ROOM · 10 TO 12 · Simplified · 63 years left | 84 sqm | S$571,888 | S$6,808 psm |
| Nov 2024 | Blk 150 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$555,688 | S$6,615 psm |
| Nov 2024 | Blk 122 · 4 ROOM · 01 TO 03 · Simplified · 62 years left | 84 sqm | S$520,000 | S$6,190 psm |
| Oct 2024 | Blk 130 · 5 ROOM · 07 TO 09 · Improved · 62 years left | 122 sqm | S$737,000 | S$6,041 psm |
| Oct 2024 | Blk 131 · 5 ROOM · 04 TO 06 · Improved · 63 years left | 122 sqm | S$725,000 | S$5,943 psm |
| Oct 2024 | Blk 112 · 5 ROOM · 01 TO 03 · Improved · 62 years left | 122 sqm | S$690,800 | S$5,662 psm |
| Oct 2024 | Blk 116 · 4 ROOM · 07 TO 09 · Model A · 63 years left | 104 sqm | S$688,000 | S$6,615 psm |
| Oct 2024 | Blk 123 · 4 ROOM · 04 TO 06 · Model A · 63 years left | 104 sqm | S$680,000 | S$6,538 psm |
| Oct 2024 | Blk 102 · 4 ROOM · 10 TO 12 · Model A · 63 years left | 104 sqm | S$645,000 | S$6,202 psm |
| Oct 2024 | Blk 151 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$575,000 | S$6,845 psm |
| Oct 2024 | Blk 112 · 4 ROOM · 10 TO 12 · Simplified · 62 years left | 84 sqm | S$550,000 | S$6,548 psm |
| Oct 2024 | Blk 130 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 84 sqm | S$543,000 | S$6,464 psm |
| Oct 2024 | Blk 134 · 4 ROOM · 04 TO 06 · Simplified · 63 years left | 84 sqm | S$518,000 | S$6,167 psm |
| Sept 2024 | Blk 101 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 122 sqm | S$715,000 | S$5,861 psm |
| Sept 2024 | Blk 256 · 4 ROOM · 04 TO 06 · Model A · 71 years left | 101 sqm | S$660,000 | S$6,535 psm |
| Sept 2024 | Blk 116 · 4 ROOM · 04 TO 06 · Model A · 63 years left | 104 sqm | S$658,000 | S$6,327 psm |
| Sept 2024 | Blk 116 · 4 ROOM · 04 TO 06 · Model A · 63 years left | 104 sqm | S$650,000 | S$6,250 psm |
| Sept 2024 | Blk 154 · 4 ROOM · 04 TO 06 · Model A · 63 years left | 103 sqm | S$635,000 | S$6,165 psm |
| Sept 2024 | Blk 124 · 4 ROOM · 07 TO 09 · Simplified · 63 years left | 84 sqm | S$545,000 | S$6,488 psm |
| Aug 2024 | Blk 119 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 128 sqm | S$742,000 | S$5,797 psm |
| Aug 2024 | Blk 154 · 5 ROOM · 07 TO 09 · Improved · 63 years left | 122 sqm | S$740,000 | S$6,066 psm |
| Aug 2024 | Blk 112 · 5 ROOM · 07 TO 09 · Improved · 63 years left | 121 sqm | S$726,000 | S$6,000 psm |
| Aug 2024 | Blk 127 · 5 ROOM · 04 TO 06 · Improved · 62 years left | 122 sqm | S$700,000 | S$5,738 psm |
| Aug 2024 | Blk 148 · 5 ROOM · 04 TO 06 · Improved · 63 years left | 122 sqm | S$682,000 | S$5,590 psm |
| Aug 2024 | Blk 124 · 5 ROOM · 04 TO 06 · Improved · 63 years left | 121 sqm | S$660,000 | S$5,455 psm |
| Aug 2024 | Blk 107 · 4 ROOM · 10 TO 12 · Model A · 63 years left | 104 sqm | S$650,000 | S$6,250 psm |
| Aug 2024 | Blk 123 · 4 ROOM · 01 TO 03 · Model A · 63 years left | 104 sqm | S$610,000 | S$5,865 psm |
| Aug 2024 | Blk 106 · 4 ROOM · 01 TO 03 · Model A · 63 years left | 104 sqm | S$600,000 | S$5,769 psm |
| Aug 2024 | Blk 136 · 4 ROOM · 01 TO 03 · Simplified · 63 years left | 84 sqm | S$512,000 | S$6,095 psm |
| Aug 2024 | Blk 112 · 4 ROOM · 01 TO 03 · Simplified · 63 years left | 84 sqm | S$498,000 | S$5,929 psm |
| Jul 2024 | Blk 126 · 5 ROOM · 10 TO 12 · Improved · 63 years left | 121 sqm | S$720,000 | S$5,950 psm |
| Jul 2024 | Blk 106 · 5 ROOM · 04 TO 06 · Improved · 63 years left | 128 sqm | S$720,000 | S$5,625 psm |
| Jul 2024 | Blk 114 · 5 ROOM · 04 TO 06 · Improved · 63 years left | 123 sqm | S$715,000 | S$5,813 psm |
| Jul 2024 | Blk 116 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 122 sqm | S$700,000 | S$5,738 psm |
| Jul 2024 | Blk 153 · 5 ROOM · 07 TO 09 · Improved · 63 years left | 122 sqm | S$695,000 | S$5,697 psm |
| Jul 2024 | Blk 150 · 5 ROOM · 07 TO 09 · Improved · 63 years left | 121 sqm | S$695,000 | S$5,744 psm |
| Jul 2024 | Blk 124 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 123 sqm | S$690,000 | S$5,610 psm |
| Jul 2024 | Blk 122 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 122 sqm | S$653,888 | S$5,360 psm |
| Jul 2024 | Blk 106 · 4 ROOM · 04 TO 06 · Model A · 63 years left | 104 sqm | S$640,000 | S$6,154 psm |
| Jul 2024 | Blk 132 · 4 ROOM · 01 TO 03 · Simplified · 63 years left | 91 sqm | S$555,888 | S$6,109 psm |
| Jul 2024 | Blk 153 · 4 ROOM · 01 TO 03 · Simplified · 63 years left | 84 sqm | S$526,000 | S$6,262 psm |
| Jul 2024 | Blk 134 · 4 ROOM · 01 TO 03 · Simplified · 63 years left | 84 sqm | S$505,000 | S$6,012 psm |
| Jun 2024 | Blk 123 · 5 ROOM · 04 TO 06 · Improved · 64 years left | 121 sqm | S$750,000 | S$6,198 psm |
| Jun 2024 | Blk 133 · 5 ROOM · 07 TO 09 · Improved · 63 years left | 122 sqm | S$735,000 | S$6,025 psm |
| Jun 2024 | Blk 110 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 122 sqm | S$720,000 | S$5,902 psm |
| Jun 2024 | Blk 135 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 121 sqm | S$650,000 | S$5,372 psm |
| Jun 2024 | Blk 101 · 4 ROOM · 01 TO 03 · Model A · 63 years left | 104 sqm | S$600,000 | S$5,769 psm |
| Jun 2024 | Blk 150 · 4 ROOM · 04 TO 06 · Simplified · 63 years left | 84 sqm | S$510,000 | S$6,071 psm |
| Jun 2024 | Blk 132 · 3 ROOM · 01 TO 03 · Simplified · 63 years left | 70 sqm | S$426,888 | S$6,098 psm |
| May 2024 | Blk 131 · 4 ROOM · 07 TO 09 · Model A · 63 years left | 104 sqm | S$630,000 | S$6,058 psm |
| May 2024 | Blk 123 · 4 ROOM · 01 TO 03 · Model A · 64 years left | 108 sqm | S$610,000 | S$5,648 psm |
| May 2024 | Blk 101 · 4 ROOM · 04 TO 06 · Model A · 63 years left | 104 sqm | S$600,000 | S$5,769 psm |
| May 2024 | Blk 150 · 4 ROOM · 07 TO 09 · Simplified · 63 years left | 84 sqm | S$550,000 | S$6,548 psm |
| May 2024 | Blk 127 · 4 ROOM · 10 TO 12 · Simplified · 63 years left | 84 sqm | S$528,000 | S$6,286 psm |
| May 2024 | Blk 132 · 3 ROOM · 01 TO 03 · Simplified · 63 years left | 64 sqm | S$415,000 | S$6,484 psm |
| Apr 2024 | Blk 128 · EXECUTIVE · 01 TO 03 · Maisonette · 62 years left | 145 sqm | S$863,888 | S$5,958 psm |
| Apr 2024 | Blk 255 · 5 ROOM · 07 TO 09 · Improved · 72 years left | 117 sqm | S$838,000 | S$7,162 psm |
| Apr 2024 | Blk 256 · 5 ROOM · 04 TO 06 · Improved · 72 years left | 119 sqm | S$770,000 | S$6,471 psm |
| Apr 2024 | Blk 106 · 5 ROOM · 10 TO 12 · Improved · 64 years left | 121 sqm | S$730,000 | S$6,033 psm |
| Apr 2024 | Blk 254 · 4 ROOM · 10 TO 12 · Model A · 72 years left | 99 sqm | S$670,000 | S$6,768 psm |
| Apr 2024 | Blk 150 · 4 ROOM · 07 TO 09 · Simplified · 63 years left | 84 sqm | S$550,000 | S$6,548 psm |
| Apr 2024 | Blk 113 · 4 ROOM · 07 TO 09 · Simplified · 63 years left | 84 sqm | S$528,000 | S$6,286 psm |
| Apr 2024 | Blk 136 · 4 ROOM · 07 TO 09 · Simplified · 64 years left | 84 sqm | S$527,000 | S$6,274 psm |
| Apr 2024 | Blk 136 · 4 ROOM · 07 TO 09 · Simplified · 63 years left | 84 sqm | S$525,000 | S$6,250 psm |
| Mar 2024 | Blk 151 · 5 ROOM · 10 TO 12 · Improved · 63 years left | 122 sqm | S$718,000 | S$5,885 psm |
| Mar 2024 | Blk 137 · 5 ROOM · 04 TO 06 · Improved · 64 years left | 122 sqm | S$675,000 | S$5,533 psm |
| Mar 2024 | Blk 108 · 4 ROOM · 01 TO 03 · Model A · 63 years left | 104 sqm | S$570,000 | S$5,481 psm |
| Mar 2024 | Blk 135 · 4 ROOM · 01 TO 03 · Simplified · 63 years left | 84 sqm | S$535,000 | S$6,369 psm |
| Feb 2024 | Blk 111 · EXECUTIVE · 01 TO 03 · Maisonette · 63 years left | 146 sqm | S$860,000 | S$5,890 psm |
| Feb 2024 | Blk 122 · 5 ROOM · 10 TO 12 · Improved · 63 years left | 122 sqm | S$690,000 | S$5,656 psm |
| Feb 2024 | Blk 114 · 5 ROOM · 04 TO 06 · Improved · 63 years left | 121 sqm | S$690,000 | S$5,702 psm |
| Feb 2024 | Blk 131 · 5 ROOM · 04 TO 06 · Improved · 64 years left | 122 sqm | S$667,000 | S$5,467 psm |
| Feb 2024 | Blk 149 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 122 sqm | S$638,000 | S$5,230 psm |
| Feb 2024 | Blk 134 · 4 ROOM · 04 TO 06 · Simplified · 64 years left | 84 sqm | S$495,000 | S$5,893 psm |
| Jan 2024 | Blk 119 · 5 ROOM · 04 TO 06 · Improved · 63 years left | 122 sqm | S$725,000 | S$5,943 psm |
| Jan 2024 | Blk 107 · 5 ROOM · 10 TO 12 · Improved · 64 years left | 121 sqm | S$720,000 | S$5,950 psm |
| Jan 2024 | Blk 130 · 5 ROOM · 07 TO 09 · Improved · 63 years left | 123 sqm | S$690,000 | S$5,610 psm |
| Jan 2024 | Blk 117 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 121 sqm | S$628,888 | S$5,197 psm |
| Jan 2024 | Blk 109 · 4 ROOM · 07 TO 09 · Model A · 64 years left | 104 sqm | S$626,000 | S$6,019 psm |
| Jan 2024 | Blk 107 · 4 ROOM · 10 TO 12 · Model A · 64 years left | 104 sqm | S$588,000 | S$5,654 psm |
| Jan 2024 | Blk 126 · 4 ROOM · 01 TO 03 · Simplified · 63 years left | 84 sqm | S$510,000 | S$6,071 psm |
| Dec 2023 | Blk 126 · 5 ROOM · 07 TO 09 · Improved · 63 years left | 121 sqm | S$660,000 | S$5,455 psm |
| Dec 2023 | Blk 123 · 4 ROOM · 04 TO 06 · Model A · 64 years left | 104 sqm | S$645,888 | S$6,210 psm |
| Dec 2023 | Blk 122 · 4 ROOM · 04 TO 06 · Simplified · 63 years left | 84 sqm | S$520,000 | S$6,190 psm |
| Nov 2023 | Blk 254 · 5 ROOM · 04 TO 06 · Improved · 72 years left | 120 sqm | S$780,000 | S$6,500 psm |
| Nov 2023 | Blk 127 · 5 ROOM · 07 TO 09 · Improved · 63 years left | 121 sqm | S$680,000 | S$5,620 psm |
| Nov 2023 | Blk 254 · 4 ROOM · 07 TO 09 · Model A · 72 years left | 99 sqm | S$638,000 | S$6,444 psm |
| Nov 2023 | Blk 254 · 4 ROOM · 04 TO 06 · Model A · 72 years left | 98 sqm | S$630,000 | S$6,429 psm |
| Nov 2023 | Blk 114 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 122 sqm | S$620,000 | S$5,082 psm |
| Nov 2023 | Blk 108 · 4 ROOM · 10 TO 12 · Model A · 64 years left | 104 sqm | S$607,000 | S$5,837 psm |
| Nov 2023 | Blk 253 · 4 ROOM · 01 TO 03 · Model A · 72 years left excluded: outlier | 101 sqm | S$590,000 | S$5,842 psm |
| Nov 2023 | Blk 113 · 4 ROOM · 07 TO 09 · Simplified · 63 years left | 84 sqm | S$538,888 | S$6,415 psm |
| Oct 2023 | Blk 134 · 5 ROOM · 10 TO 12 · Improved · 64 years left | 122 sqm | S$690,000 | S$5,656 psm |
| Oct 2023 | Blk 114 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 122 sqm | S$655,000 | S$5,369 psm |
| Oct 2023 | Blk 113 · 5 ROOM · 01 TO 03 · Improved · 64 years left | 122 sqm | S$638,000 | S$5,230 psm |
| Oct 2023 | Blk 153 · 4 ROOM · 04 TO 06 · Simplified · 64 years left | 84 sqm | S$500,000 | S$5,952 psm |
| Sept 2023 | Blk 112 · 5 ROOM · 07 TO 09 · Improved · 63 years left | 122 sqm | S$710,000 | S$5,820 psm |
| Sept 2023 | Blk 149 · 5 ROOM · 07 TO 09 · Improved · 64 years left | 122 sqm | S$700,000 | S$5,738 psm |
| Sept 2023 | Blk 253 · 4 ROOM · 07 TO 09 · Model A · 72 years left excluded: outlier | 100 sqm | S$668,000 | S$6,680 psm |
| Sept 2023 | Blk 116 · 5 ROOM · 01 TO 03 · Improved · 64 years left | 122 sqm | S$623,000 | S$5,107 psm |
| Sept 2023 | Blk 119 · 4 ROOM · 01 TO 03 · Model A · 64 years left | 104 sqm | S$620,000 | S$5,962 psm |
| Sept 2023 | Blk 112 · 4 ROOM · 07 TO 09 · Simplified · 63 years left | 84 sqm | S$531,888 | S$6,332 psm |
| Aug 2023 | Blk 254 · 4 ROOM · 07 TO 09 · Model A · 72 years left | 99 sqm | S$638,000 | S$6,444 psm |
| Aug 2023 | Blk 254 · 4 ROOM · 04 TO 06 · Model A · 72 years left | 100 sqm | S$615,000 | S$6,150 psm |
| Aug 2023 | Blk 127 · 4 ROOM · 04 TO 06 · Simplified · 63 years left | 84 sqm | S$528,000 | S$6,286 psm |
| Aug 2023 | Blk 139 · 4 ROOM · 01 TO 03 · Simplified · 63 years left | 91 sqm | S$510,000 | S$5,604 psm |
| Jul 2023 | Blk 101 · 5 ROOM · 01 TO 03 · Improved · 64 years left | 128 sqm | S$680,000 | S$5,313 psm |
| Jul 2023 | Blk 110 · 5 ROOM · 04 TO 06 · Improved · 64 years left | 122 sqm | S$670,000 | S$5,492 psm |
| Jul 2023 | Blk 126 · 5 ROOM · 01 TO 03 · Improved · 64 years left | 123 sqm | S$668,000 | S$5,431 psm |
| Jul 2023 | Blk 138 · 5 ROOM · 01 TO 03 · Improved · 64 years left | 122 sqm | S$650,000 | S$5,328 psm |
| Jul 2023 | Blk 130 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 122 sqm | S$650,000 | S$5,328 psm |
| Jul 2023 | Blk 124 · 5 ROOM · 04 TO 06 · Improved · 64 years left | 122 sqm | S$650,000 | S$5,328 psm |
| Jul 2023 | Blk 119 · 4 ROOM · 10 TO 12 · Model A · 64 years left | 104 sqm | S$628,688 | S$6,045 psm |
| Jul 2023 | Blk 256 · 4 ROOM · 01 TO 03 · Model A · 73 years left | 101 sqm | S$595,000 | S$5,891 psm |
| Jul 2023 | Blk 254 · 4 ROOM · 04 TO 06 · Model A · 72 years left | 99 sqm | S$580,000 | S$5,859 psm |
| Jul 2023 | Blk 108 · 4 ROOM · 01 TO 03 · Model A · 64 years left | 104 sqm | S$560,000 | S$5,385 psm |
| Jul 2023 | Blk 106 · 4 ROOM · 01 TO 03 · Model A · 64 years left | 104 sqm | S$545,000 | S$5,240 psm |
| Jul 2023 | Blk 150 · 4 ROOM · 04 TO 06 · Simplified · 64 years left | 84 sqm | S$502,000 | S$5,976 psm |
| Jul 2023 | Blk 124 · 4 ROOM · 10 TO 12 · Simplified · 64 years left | 84 sqm | S$500,000 | S$5,952 psm |
| Jul 2023 | Blk 124 · 4 ROOM · 01 TO 03 · Simplified · 64 years left | 84 sqm | S$500,000 | S$5,952 psm |
| Jun 2023 | Blk 135 · 5 ROOM · 04 TO 06 · Improved · 64 years left | 121 sqm | S$685,000 | S$5,661 psm |
| Jun 2023 | Blk 120 · 4 ROOM · 07 TO 09 · Model A · 64 years left | 104 sqm | S$638,000 | S$6,135 psm |
| Jun 2023 | Blk 151 · 5 ROOM · 01 TO 03 · Improved · 64 years left | 122 sqm | S$622,888 | S$5,106 psm |
| Jun 2023 | Blk 255 · 4 ROOM · 07 TO 09 · Model A · 72 years left | 98 sqm | S$600,000 | S$6,122 psm |
| Jun 2023 | Blk 150 · 5 ROOM · 01 TO 03 · Improved · 64 years left | 122 sqm | S$600,000 | S$4,918 psm |
| Jun 2023 | Blk 106 · 4 ROOM · 10 TO 12 · Model A · 64 years left | 104 sqm | S$592,000 | S$5,692 psm |
| Jun 2023 | Blk 122 · 4 ROOM · 04 TO 06 · Simplified · 64 years left excluded: outlier | 84 sqm | S$530,000 | S$6,310 psm |
| Jun 2023 | Blk 153 · 4 ROOM · 04 TO 06 · Simplified · 64 years left | 84 sqm | S$520,000 | S$6,190 psm |
| Jun 2023 | Blk 112 · 4 ROOM · 01 TO 03 · Simplified · 64 years left | 84 sqm | S$477,888 | S$5,689 psm |
| Jun 2023 | Blk 124 · 4 ROOM · 07 TO 09 · Simplified · 64 years left | 84 sqm | S$475,000 | S$5,655 psm |
| May 2023 | Blk 253 · 5 ROOM · 07 TO 09 · Improved · 72 years left | 122 sqm | S$785,000 | S$6,434 psm |
| May 2023 | Blk 112 · 5 ROOM · 07 TO 09 · Improved · 64 years left | 122 sqm | S$710,000 | S$5,820 psm |
| May 2023 | Blk 112 · 5 ROOM · 01 TO 03 · Improved · 64 years left | 123 sqm | S$630,000 | S$5,122 psm |
| May 2023 | Blk 131 · 4 ROOM · 04 TO 06 · Model A · 64 years left | 104 sqm | S$552,888 | S$5,316 psm |
| May 2023 | Blk 135 · 4 ROOM · 07 TO 09 · Simplified · 64 years left | 84 sqm | S$510,000 | S$6,071 psm |
| May 2023 | Blk 126 · 4 ROOM · 04 TO 06 · Simplified · 64 years left | 84 sqm | S$487,000 | S$5,798 psm |
| May 2023 | Blk 124 · 4 ROOM · 07 TO 09 · Simplified · 64 years left | 84 sqm | S$485,000 | S$5,774 psm |
| Apr 2023 | Blk 126 · 5 ROOM · 10 TO 12 · Improved · 64 years left | 123 sqm | S$635,000 | S$5,163 psm |
| Apr 2023 | Blk 120 · 4 ROOM · 07 TO 09 · Model A · 64 years left | 104 sqm | S$608,888 | S$5,855 psm |
Showing 300 of 2204.
Sale prices as filed in caveats.
| Period | Detail | Monthly rent | Per area |
|---|---|---|---|
| Sept 2026 | Blk 119 · 5 ROOM | S$4,500 | — |
| Sept 2026 | Blk 134 · 5 ROOM | S$4,000 | — |
| Sept 2026 | Blk 256 · 4 ROOM | S$3,900 | — |
| Sept 2026 | Blk 106 · 4 ROOM | S$3,750 | — |
| Sept 2026 | Blk 102 · 5 ROOM | S$3,700 | — |
| Sept 2026 | Blk 148 · 4 ROOM | S$3,700 | — |
| Sept 2026 | Blk 256 · 4 ROOM | S$3,700 | — |
| Sept 2026 | Blk 113 · 4 ROOM | S$3,600 | — |
| Sept 2026 | Blk 148 · 4 ROOM | S$3,600 | — |
| Sept 2026 | Blk 113 · 5 ROOM | S$3,600 | — |
| Sept 2026 | Blk 138 · 5 ROOM | S$3,200 | — |
| Sept 2026 | Blk 154 · 5 ROOM | S$3,200 | — |
| Sept 2026 | Blk 132 · 3 ROOM | S$3,000 | — |
| Sept 2026 | Blk 151 · 4 ROOM | S$2,600 | — |
| Sept 2026 | Blk 139 · 3 ROOM | S$2,400 | — |
| Sept 2026 | Blk 122 · 4 ROOM | S$2,000 | — |
| Aug 2026 | Blk 112 · 5 ROOM | S$4,000 | — |
| Aug 2026 | Blk 107 · 5 ROOM | S$4,000 | — |
| Aug 2026 | Blk 253 · 5 ROOM | S$3,900 | — |
| Aug 2026 | Blk 255 · 5 ROOM | S$3,900 | — |
| Aug 2026 | Blk 106 · 4 ROOM | S$3,800 | — |
| Aug 2026 | Blk 256 · 4 ROOM | S$3,800 | — |
| Aug 2026 | Blk 127 · 4 ROOM | S$3,600 | — |
| Aug 2026 | Blk 137 · 4 ROOM | S$3,500 | — |
| Aug 2026 | Blk 124 · 4 ROOM | S$3,000 | — |
| Aug 2026 | Blk 123 · 4 ROOM | S$2,500 | — |
| Aug 2026 | Blk 124 · 4 ROOM | S$2,200 | — |
| Aug 2026 | Blk 107 · 5 ROOM | S$1,100 | — |
| Jul 2026 | Blk 126 · 5 ROOM | S$4,200 | — |
| Jul 2026 | Blk 256 · 5 ROOM | S$4,100 | — |
| Jul 2026 | Blk 254 · 5 ROOM | S$4,000 | — |
| Jul 2026 | Blk 124 · 5 ROOM | S$3,900 | — |
| Jul 2026 | Blk 150 · 5 ROOM | S$3,700 | — |
| Jul 2026 | Blk 124 · 5 ROOM | S$3,700 | — |
| Jul 2026 | Blk 106 · 4 ROOM | S$3,600 | — |
| Jul 2026 | Blk 253 · 4 ROOM | S$3,500 | — |
| Jul 2026 | Blk 135 · 4 ROOM | S$3,500 | — |
| Jul 2026 | Blk 139 · 4 ROOM | S$3,500 | — |
| Jul 2026 | Blk 139 · 4 ROOM | S$3,500 | — |
| Jul 2026 | Blk 109 · 5 ROOM | S$3,500 | — |
| Jul 2026 | Blk 133 · 4 ROOM | S$3,250 | — |
| Jul 2026 | Blk 254 · 4 ROOM | S$3,000 | — |
| Jul 2026 | Blk 113 · 5 ROOM | S$2,500 | — |
| Jun 2026 | Blk 138 · 5 ROOM | S$4,200 | — |
| Jun 2026 | Blk 101 · 4 ROOM | S$4,000 | — |
| Jun 2026 | Blk 123 · 4 ROOM | S$3,900 | — |
| Jun 2026 | Blk 107 · 4 ROOM | S$3,800 | — |
| Jun 2026 | Blk 130 · 4 ROOM | S$3,700 | — |
| Jun 2026 | Blk 117 · 4 ROOM | S$3,680 | — |
| Jun 2026 | Blk 117 · 4 ROOM | S$3,650 | — |
| Jun 2026 | Blk 107 · 5 ROOM | S$3,600 | — |
| Jun 2026 | Blk 154 · 5 ROOM | S$3,500 | — |
| Jun 2026 | Blk 134 · 5 ROOM | S$3,400 | — |
| Jun 2026 | Blk 154 · 5 ROOM | S$3,400 | — |
| Jun 2026 | Blk 255 · 5 ROOM | S$3,200 | — |
| Jun 2026 | Blk 131 · 4 ROOM | S$3,200 | — |
| Jun 2026 | Blk 149 · 4 ROOM | S$3,100 | — |
| Jun 2026 | Blk 149 · 4 ROOM | S$2,990 | — |
| Jun 2026 | Blk 132 · 3 ROOM | S$2,850 | — |
| May 2026 | Blk 106 · 4 ROOM | S$4,000 | — |
| May 2026 | Blk 254 · 4 ROOM | S$4,000 | — |
| May 2026 | Blk 124 · 4 ROOM | S$3,850 | — |
| May 2026 | Blk 105 · EXECUTIVE | S$3,800 | — |
| May 2026 | Blk 154 · 5 ROOM | S$3,700 | — |
| May 2026 | Blk 151 · 5 ROOM | S$3,600 | — |
| May 2026 | Blk 127 · 4 ROOM | S$3,550 | — |
| May 2026 | Blk 123 · 4 ROOM | S$3,400 | — |
| May 2026 | Blk 256 · 4 ROOM | S$3,400 | — |
| May 2026 | Blk 138 · 5 ROOM | S$3,300 | — |
| May 2026 | Blk 124 · 4 ROOM | S$3,300 | — |
| May 2026 | Blk 122 · 5 ROOM | S$3,200 | — |
| May 2026 | Blk 124 · 5 ROOM | S$3,140 | — |
| Apr 2026 | Blk 105 · EXECUTIVE | S$4,200 | — |
| Apr 2026 | Blk 134 · 5 ROOM | S$4,000 | — |
| Apr 2026 | Blk 148 · 5 ROOM | S$4,000 | — |
| Apr 2026 | Blk 153 · 5 ROOM | S$3,800 | — |
| Apr 2026 | Blk 137 · 4 ROOM | S$3,700 | — |
| Apr 2026 | Blk 131 · 4 ROOM | S$3,700 | — |
| Apr 2026 | Blk 102 · 5 ROOM | S$3,600 | — |
| Apr 2026 | Blk 135 · 5 ROOM | S$3,500 | — |
| Apr 2026 | Blk 116 · 4 ROOM | S$3,500 | — |
| Apr 2026 | Blk 135 · 5 ROOM | S$3,450 | — |
| Apr 2026 | Blk 126 · 4 ROOM | S$3,400 | — |
| Apr 2026 | Blk 102 · 4 ROOM | S$3,400 | — |
| Apr 2026 | Blk 109 · 4 ROOM | S$3,300 | — |
| Apr 2026 | Blk 137 · 4 ROOM | S$3,300 | — |
| Apr 2026 | Blk 132 · 3 ROOM | S$3,000 | — |
| Apr 2026 | Blk 150 · 4 ROOM | S$3,000 | — |
| Apr 2026 | Blk 124 · 4 ROOM | S$2,500 | — |
| Mar 2026 | Blk 112 · 5 ROOM | S$4,200 | — |
| Mar 2026 | Blk 105 · EXECUTIVE | S$4,200 | — |
| Mar 2026 | Blk 112 · 5 ROOM | S$4,000 | — |
| Mar 2026 | Blk 130 · 5 ROOM | S$3,900 | — |
| Mar 2026 | Blk 122 · 5 ROOM | S$3,900 | — |
| Mar 2026 | Blk 114 · 5 ROOM | S$3,850 | — |
| Mar 2026 | Blk 150 · 5 ROOM | S$3,800 | — |
| Mar 2026 | Blk 127 · 5 ROOM | S$3,800 | — |
| Mar 2026 | Blk 134 · 5 ROOM | S$3,700 | — |
| Mar 2026 | Blk 101 · 4 ROOM | S$3,700 | — |
| Mar 2026 | Blk 133 · 4 ROOM | S$3,600 | — |
| Mar 2026 | Blk 255 · 4 ROOM | S$3,500 | — |
| Mar 2026 | Blk 127 · 4 ROOM | S$3,200 | — |
| Mar 2026 | Blk 154 · 4 ROOM | S$3,200 | — |
| Mar 2026 | Blk 148 · 4 ROOM | S$2,800 | — |
| Mar 2026 | Blk 132 · 3 ROOM | S$2,500 | — |
| Mar 2026 | Blk 116 · 4 ROOM | S$2,200 | — |
| Mar 2026 | Blk 110 · 4 ROOM | S$2,000 | — |
| Feb 2026 | Blk 102 · 5 ROOM | S$4,400 | — |
| Feb 2026 | Blk 108 · 4 ROOM | S$4,100 | — |
| Feb 2026 | Blk 116 · 4 ROOM | S$3,850 | — |
| Feb 2026 | Blk 135 · 4 ROOM | S$3,700 | — |
| Feb 2026 | Blk 119 · 5 ROOM | S$3,600 | — |
| Feb 2026 | Blk 154 · 5 ROOM | S$3,600 | — |
| Feb 2026 | Blk 102 · 5 ROOM | S$3,600 | — |
| Feb 2026 | Blk 256 · 4 ROOM | S$3,600 | — |
| Feb 2026 | Blk 137 · 4 ROOM | S$3,600 | — |
| Feb 2026 | Blk 113 · 4 ROOM | S$3,500 | — |
| Feb 2026 | Blk 124 · 4 ROOM | S$3,400 | — |
| Feb 2026 | Blk 124 · 4 ROOM | S$3,150 | — |
| Feb 2026 | Blk 107 · 4 ROOM | S$2,900 | — |
| Feb 2026 | Blk 105 · EXECUTIVE | S$2,900 | — |
| Feb 2026 | Blk 149 · 4 ROOM | S$2,800 | — |
| Jan 2026 | Blk 101 · 4 ROOM | S$4,000 | — |
| Jan 2026 | Blk 102 · 5 ROOM | S$4,000 | — |
| Jan 2026 | Blk 112 · 4 ROOM | S$3,850 | — |
| Jan 2026 | Blk 150 · 5 ROOM | S$3,750 | — |
| Jan 2026 | Blk 124 · 5 ROOM | S$3,700 | — |
| Jan 2026 | Blk 123 · 4 ROOM | S$3,550 | — |
| Jan 2026 | Blk 131 · 4 ROOM | S$3,500 | — |
| Jan 2026 | Blk 112 · 5 ROOM | S$3,500 | — |
| Jan 2026 | Blk 136 · 4 ROOM | S$3,500 | — |
| Jan 2026 | Blk 117 · 4 ROOM | S$3,500 | — |
| Jan 2026 | Blk 113 · 4 ROOM | S$3,500 | — |
| Jan 2026 | Blk 253 · 4 ROOM | S$3,500 | — |
| Jan 2026 | Blk 148 · 5 ROOM | S$3,230 | — |
| Jan 2026 | Blk 101 · 4 ROOM | S$3,100 | — |
| Jan 2026 | Blk 107 · 5 ROOM | S$3,000 | — |
| Jan 2026 | Blk 154 · 5 ROOM | S$3,000 | — |
| Jan 2026 | Blk 122 · 5 ROOM | S$2,800 | — |
| Jan 2026 | Blk 119 · 5 ROOM | S$2,700 | — |
| Dec 2025 | Blk 135 · 5 ROOM | S$4,200 | — |
| Dec 2025 | Blk 256 · 4 ROOM | S$4,100 | — |
| Dec 2025 | Blk 109 · 5 ROOM | S$4,000 | — |
| Dec 2025 | Blk 123 · 5 ROOM | S$4,000 | — |
| Dec 2025 | Blk 114 · 5 ROOM | S$4,000 | — |
| Dec 2025 | Blk 135 · 5 ROOM | S$3,850 | — |
| Dec 2025 | Blk 136 · 5 ROOM | S$3,800 | — |
| Dec 2025 | Blk 137 · 4 ROOM | S$3,800 | — |
| Dec 2025 | Blk 122 · 4 ROOM | S$3,500 | — |
| Dec 2025 | Blk 101 · 4 ROOM | S$3,400 | — |
| Dec 2025 | Blk 114 · 4 ROOM | S$3,200 | — |
| Dec 2025 | Blk 149 · 4 ROOM | S$3,200 | — |
| Dec 2025 | Blk 148 · 4 ROOM | S$3,100 | — |
| Dec 2025 | Blk 119 · 4 ROOM | S$600 | — |
| Nov 2025 | Blk 136 · 5 ROOM | S$4,100 | — |
| Nov 2025 | Blk 123 · 5 ROOM | S$4,000 | — |
| Nov 2025 | Blk 253 · 5 ROOM | S$3,800 | — |
| Nov 2025 | Blk 102 · 4 ROOM | S$3,700 | — |
| Nov 2025 | Blk 133 · 4 ROOM | S$3,600 | — |
| Nov 2025 | Blk 109 · 4 ROOM | S$3,500 | — |
| Nov 2025 | Blk 134 · 4 ROOM | S$3,500 | — |
| Nov 2025 | Blk 148 · 4 ROOM | S$3,400 | — |
| Nov 2025 | Blk 151 · 4 ROOM | S$3,400 | — |
| Nov 2025 | Blk 101 · 4 ROOM | S$3,150 | — |
| Nov 2025 | Blk 122 · 4 ROOM | S$3,000 | — |
| Nov 2025 | Blk 126 · 5 ROOM | S$2,950 | — |
| Nov 2025 | Blk 117 · 4 ROOM | S$2,850 | — |
| Nov 2025 | Blk 108 · 4 ROOM | S$2,800 | — |
| Nov 2025 | Blk 139 · 3 ROOM | S$2,800 | — |
| Oct 2025 | Blk 126 · 5 ROOM | S$4,200 | — |
| Oct 2025 | Blk 106 · 4 ROOM | S$4,100 | — |
| Oct 2025 | Blk 154 · 5 ROOM | S$4,000 | — |
| Oct 2025 | Blk 117 · 5 ROOM | S$3,900 | — |
| Oct 2025 | Blk 154 · 5 ROOM | S$3,800 | — |
| Oct 2025 | Blk 136 · 5 ROOM | S$3,800 | — |
| Oct 2025 | Blk 256 · 4 ROOM | S$3,700 | — |
| Oct 2025 | Blk 102 · 4 ROOM | S$3,600 | — |
| Oct 2025 | Blk 105 · EXECUTIVE | S$3,600 | — |
| Oct 2025 | Blk 102 · 5 ROOM | S$3,500 | — |
| Oct 2025 | Blk 139 · 4 ROOM | S$3,500 | — |
| Oct 2025 | Blk 150 · 5 ROOM | S$3,400 | — |
| Oct 2025 | Blk 154 · 5 ROOM | S$3,200 | — |
| Oct 2025 | Blk 132 · 3 ROOM | S$3,000 | — |
| Oct 2025 | Blk 107 · 4 ROOM | S$2,900 | — |
| Oct 2025 | Blk 117 · 4 ROOM | S$2,600 | — |
| Oct 2025 | Blk 109 · 5 ROOM | S$2,500 | — |
| Oct 2025 | Blk 109 · 4 ROOM | S$2,400 | — |
| Oct 2025 | Blk 153 · 5 ROOM | S$2,000 | — |
| Oct 2025 | Blk 151 · 4 ROOM | S$1,700 | — |
| Sept 2025 | Blk 138 · 5 ROOM | S$4,000 | — |
| Sept 2025 | Blk 129 · 5 ROOM | S$4,000 | — |
| Sept 2025 | Blk 117 · 5 ROOM | S$4,000 | — |
| Sept 2025 | Blk 135 · 5 ROOM | S$3,800 | — |
| Sept 2025 | Blk 148 · 4 ROOM | S$3,700 | — |
| Sept 2025 | Blk 148 · 4 ROOM | S$3,600 | — |
| Sept 2025 | Blk 119 · 4 ROOM | S$3,500 | — |
| Sept 2025 | Blk 150 · 5 ROOM | S$3,400 | — |
| Sept 2025 | Blk 106 · 4 ROOM | S$3,200 | — |
| Sept 2025 | Blk 132 · 3 ROOM | S$3,200 | — |
| Sept 2025 | Blk 151 · 4 ROOM | S$1,950 | — |
| Sept 2025 | Blk 116 · 5 ROOM | S$1,500 | — |
| Aug 2025 | Blk 256 · 4 ROOM | S$4,100 | — |
| Aug 2025 | Blk 119 · 5 ROOM | S$4,000 | — |
| Aug 2025 | Blk 256 · 4 ROOM | S$4,000 | — |
| Aug 2025 | Blk 133 · 5 ROOM | S$4,000 | — |
| Aug 2025 | Blk 113 · 4 ROOM | S$3,800 | — |
| Aug 2025 | Blk 131 · 4 ROOM | S$3,700 | — |
| Aug 2025 | Blk 123 · 5 ROOM | S$3,400 | — |
| Aug 2025 | Blk 154 · 4 ROOM | S$3,200 | — |
| Aug 2025 | Blk 150 · 5 ROOM | S$2,800 | — |
| Aug 2025 | Blk 123 · 4 ROOM | S$2,400 | — |
| Jul 2025 | Blk 101 · 4 ROOM | S$4,700 | — |
| Jul 2025 | Blk 116 · 5 ROOM | S$4,100 | — |
| Jul 2025 | Blk 254 · 4 ROOM | S$4,100 | — |
| Jul 2025 | Blk 256 · 5 ROOM | S$4,100 | — |
| Jul 2025 | Blk 124 · 5 ROOM | S$3,900 | — |
| Jul 2025 | Blk 106 · 4 ROOM | S$3,850 | — |
| Jul 2025 | Blk 102 · 5 ROOM | S$3,800 | — |
| Jul 2025 | Blk 150 · 5 ROOM | S$3,700 | — |
| Jul 2025 | Blk 135 · 4 ROOM | S$3,700 | — |
| Jul 2025 | Blk 151 · 5 ROOM | S$3,600 | — |
| Jul 2025 | Blk 106 · 4 ROOM | S$3,600 | — |
| Jul 2025 | Blk 137 · 5 ROOM | S$3,420 | — |
| Jul 2025 | Blk 119 · 4 ROOM | S$3,300 | — |
| Jul 2025 | Blk 106 · 4 ROOM | S$3,200 | — |
| Jun 2025 | Blk 135 · 5 ROOM | S$4,100 | — |
| Jun 2025 | Blk 117 · 5 ROOM | S$4,000 | — |
| Jun 2025 | Blk 117 · 5 ROOM | S$3,800 | — |
| Jun 2025 | Blk 150 · 5 ROOM | S$3,700 | — |
| Jun 2025 | Blk 123 · 4 ROOM | S$3,700 | — |
| Jun 2025 | Blk 101 · 4 ROOM | S$3,700 | — |
| Jun 2025 | Blk 150 · 4 ROOM | S$3,500 | — |
| Jun 2025 | Blk 116 · 4 ROOM | S$3,500 | — |
| Jun 2025 | Blk 112 · 5 ROOM | S$3,500 | — |
| Jun 2025 | Blk 113 · 4 ROOM | S$3,500 | — |
| Jun 2025 | Blk 137 · 4 ROOM | S$3,200 | — |
| Jun 2025 | Blk 127 · 4 ROOM | S$3,200 | — |
| Jun 2025 | Blk 108 · 5 ROOM | S$3,150 | — |
| Jun 2025 | Blk 149 · 4 ROOM | S$3,000 | — |
| Jun 2025 | Blk 114 · 4 ROOM | S$2,800 | — |
| Jun 2025 | Blk 122 · 5 ROOM | S$2,700 | — |
| Jun 2025 | Blk 154 · 4 ROOM | S$2,400 | — |
| May 2025 | Blk 112 · 5 ROOM | S$4,500 | — |
| May 2025 | Blk 117 · 5 ROOM | S$4,400 | — |
| May 2025 | Blk 126 · 5 ROOM | S$4,200 | — |
| May 2025 | Blk 135 · 5 ROOM | S$4,100 | — |
| May 2025 | Blk 148 · 5 ROOM | S$4,000 | — |
| May 2025 | Blk 122 · 5 ROOM | S$4,000 | — |
| May 2025 | Blk 102 · 5 ROOM | S$3,850 | — |
| May 2025 | Blk 123 · 5 ROOM | S$3,850 | — |
| May 2025 | Blk 107 · 4 ROOM | S$3,700 | — |
| May 2025 | Blk 136 · 5 ROOM | S$3,700 | — |
| May 2025 | Blk 150 · 5 ROOM | S$3,600 | — |
| May 2025 | Blk 106 · 4 ROOM | S$3,600 | — |
| May 2025 | Blk 127 · 4 ROOM | S$3,550 | — |
| May 2025 | Blk 154 · 5 ROOM | S$3,500 | — |
| May 2025 | Blk 129 · 5 ROOM | S$3,500 | — |
| May 2025 | Blk 134 · 4 ROOM | S$3,300 | — |
| May 2025 | Blk 106 · 5 ROOM | S$3,000 | — |
| May 2025 | Blk 132 · 3 ROOM | S$3,000 | — |
| May 2025 | Blk 132 · 3 ROOM | S$3,000 | — |
| May 2025 | Blk 130 · 4 ROOM | S$2,800 | — |
| May 2025 | Blk 124 · 5 ROOM | S$2,300 | — |
| May 2025 | Blk 124 · 4 ROOM | S$2,000 | — |
| May 2025 | Blk 124 · 4 ROOM | S$1,600 | — |
| Apr 2025 | Blk 120 · 5 ROOM | S$4,350 | — |
| Apr 2025 | Blk 107 · 5 ROOM | S$4,300 | — |
| Apr 2025 | Blk 148 · 5 ROOM | S$4,100 | — |
| Apr 2025 | Blk 256 · 4 ROOM | S$4,100 | — |
| Apr 2025 | Blk 136 · 5 ROOM | S$4,100 | — |
| Apr 2025 | Blk 123 · 5 ROOM | S$4,000 | — |
| Apr 2025 | Blk 153 · 5 ROOM | S$4,000 | — |
| Apr 2025 | Blk 254 · 4 ROOM | S$4,000 | — |
| Apr 2025 | Blk 255 · 5 ROOM | S$3,900 | — |
| Apr 2025 | Blk 255 · 5 ROOM | S$3,850 | — |
| Apr 2025 | Blk 130 · 4 ROOM | S$3,850 | — |
| Apr 2025 | Blk 127 · 5 ROOM | S$3,800 | — |
| Apr 2025 | Blk 109 · 4 ROOM | S$3,800 | — |
| Apr 2025 | Blk 135 · 5 ROOM | S$3,500 | — |
| Apr 2025 | Blk 102 · 4 ROOM | S$3,400 | — |
| Apr 2025 | Blk 126 · 4 ROOM | S$3,200 | — |
| Apr 2025 | Blk 132 · 3 ROOM | S$3,100 | — |
| Apr 2025 | Blk 135 · 5 ROOM | S$3,000 | — |
| Apr 2025 | Blk 136 · 4 ROOM | S$3,000 | — |
| Apr 2025 | Blk 124 · 4 ROOM | S$2,700 | — |
| Apr 2025 | Blk 136 · 4 ROOM | S$2,500 | — |
| Apr 2025 | Blk 133 · 5 ROOM | S$2,200 | — |
| Apr 2025 | Blk 127 · 4 ROOM | S$2,000 | — |
| Mar 2025 | Blk 123 · 5 ROOM | S$4,000 | — |
| Mar 2025 | Blk 137 · 5 ROOM | S$4,000 | — |
| Mar 2025 | Blk 123 · 4 ROOM | S$3,900 | — |
| Mar 2025 | Blk 112 · 4 ROOM | S$3,850 | — |
| Mar 2025 | Blk 148 · 5 ROOM | S$3,800 | — |
| Mar 2025 | Blk 124 · 5 ROOM | S$3,800 | — |
| Mar 2025 | Blk 135 · 5 ROOM | S$3,700 | — |
| Mar 2025 | Blk 256 · 4 ROOM | S$3,600 | — |
| Mar 2025 | Blk 120 · 5 ROOM | S$3,600 | — |
| Mar 2025 | Blk 106 · 4 ROOM | S$3,600 | — |
| Mar 2025 | Blk 136 · 5 ROOM | S$3,600 | — |
| Mar 2025 | Blk 102 · 4 ROOM | S$3,500 | — |
Showing 300 of 1087.
Rents as approved by HDB, or as filed with URA for private homes, where the floor area is given as a band.
4-Room resale prices in Tampines
Embed these figures on your site
Free to use with the link intact. The card updates when the data does.