Tampines St 22 — recent transacted prices and indicative value
99-year lease · 56.2 years remaining · 28 addresses
Tampines St 22 has 56.2 years of lease remaining. Latest recorded sale 1 Oct 2026.
The median price at Tampines St 22 over the last 12 months was S$5,825 psm, from 69 recorded sales between Dec 2025 and Oct 2026, with most between S$5,619 psm and S$6,214 psm. This is an indicative figure from recorded transactions, not a formal valuation.
From 69 sales between Dec 2025 and Oct 2026 · 25th to 75th percentile S$5,619 psm to S$6,214 psmLatest recorded sale 1 Oct 2026
How has the price at Tampines St 22 changed?
The median price at Tampines St 22 has risen 41.8% from S$4,133 psm in Q1 2017 to S$5,860 psm in Q4 2026. This reflects recorded transactions and is not a formal valuation.
How accurate is this estimate for Tampines St 22?
We re-ran the estimate as of Q1 2026 on what was known at the time, then compared it with the 66 sales in Tampines St 22 since.
- Median error
- 3.2%
Half the estimates came closer than this to what the home actually fetched, half missed by more.
Value a unit here
Starts with this address. Type another address or postal code in this project to value that one.
Primary schools within 1 km of Tampines St 22
Measured from each school's land to this project's buildings, the way MOE bands P1 priority. MOE measures to the building's outline, so near 1 km check OneMap's School Query.
- Chongzheng Primary School · 102 m
- Yumin Primary School · 102 m
- Tampines Primary School · 535 m · 18 of 28 buildings within 1 km · near the line — check on OneMap
- Changkat Primary School · 571 m · 20 of 28 buildings within 1 km · near the line — check on OneMap
What does a unit at Tampines St 22 rent for?
A flat like this at Tampines St 22 rents for about S$3,325 a month, the middle of 46 HDB rental approvals in the last year. That is a gross yield of 6.65% on the indicative value. Indicative, from recorded rents.
What this flat earns against what it costs, set beside what homes like it earn.
6.65% gross yield
S$39,900 of rent a year against the estimate above · 1.11 points above flats like it
Homes like this rent for about S$3,325 a month, the middle of 46 approvals in the last year.
Across Singapore, flats of this type with 80 to 89 years of lease left yield 5.54%, from 148 blocks. This town has too few such blocks to measure on its own.
A yield above the mark means the flat rents well for what it costs, which can point to a keen rental patch or a price the sales alone have not caught up with. Below it, buyers are paying for something a tenant will not, such as the address itself.
Recent rental approvals used
| Approved | Block | Flat | Rent a month |
|---|---|---|---|
| Sept 2026 | 285 | 4 ROOM | S$3,300 |
| Sept 2026 | 284 | 4 ROOM | S$2,400 |
| Sept 2026 | 287 | 4 ROOM | S$2,300 |
| Sept 2026 | 285 | 4 ROOM | S$900 |
| Aug 2026 | 284 | 4 ROOM | S$3,800 |
| Aug 2026 | 272 | 4 ROOM | S$3,600 |
| Aug 2026 | 296 | 4 ROOM | S$3,600 |
| Aug 2026 | 273 | 4 ROOM | S$3,200 |
median of 46 HDB rental approvals for 4 ROOM on Tampines St 22 since 2025-11.
Get new sales by email
We'll email you when a new sale is filed at Tampines St 22. At most one email a week for this project, and only when something sold.
We use your address only to send this alert, and nothing else. Unsubscribe in one click from any email.
What flat types sell at Tampines St 22?
- 2 ROOM21 sales
- 3 ROOM298 sales
- 4 ROOM328 sales
- 5 ROOM156 sales
Blocks in Tampines St 22
- Blk 272 Tampines St 22
- Blk 273 Tampines St 22
- Blk 274 Tampines St 22
- Blk 275 Tampines St 22
- Blk 276 Tampines St 22
- Blk 277 Tampines St 22
- Blk 278 Tampines St 22
- Blk 279 Tampines St 22
- Blk 280 Tampines St 22
- Blk 281 Tampines St 22
- Blk 282 Tampines St 22
- Blk 283 Tampines St 22
- Blk 284 Tampines St 22
- Blk 285 Tampines St 22
- Blk 286 Tampines St 22
- Blk 287 Tampines St 22
- Blk 288 Tampines St 22
- Blk 289 Tampines St 22
- Blk 290 Tampines St 22
- Blk 291 Tampines St 22
- Blk 292 Tampines St 22
- Blk 293 Tampines St 22
- Blk 294 Tampines St 22
- Blk 295 Tampines St 22
- Blk 296 Tampines St 22
- Blk 297 Tampines St 22
- Blk 298 Tampines St 22
- Blk 299A Tampines St 22
Nearest projects
- Tampines St 33 · 457 m · 554 sales
- Tampines St 23 · 458 m · 329 sales
- Simei St 2 · 479 m · 96 sales
- Simei St 5 · 551 m · 77 sales
- Tampines St 24 · 552 m · 183 sales
Buying or selling here?
Buying: Stamp duty · Cash and CPF needed · How much can I borrow · Monthly repayment.
Selling: Net proceeds from selling.
What has sold at Tampines St 22 recently?
| Date | Detail | Area | Price | Per area |
|---|---|---|---|---|
| Oct 2026 | Blk 293 · 4 ROOM · 04 TO 06 · Model A · 57 years left | 104 sqm | S$605,000 | S$5,817 psm |
| Oct 2026 | Blk 281 · 4 ROOM · 10 TO 12 · Model A · 57 years left | 103 sqm | S$608,000 | S$5,903 psm |
| Oct 2026 | Blk 272 · 4 ROOM · 07 TO 09 · Model A · 57 years left | 105 sqm | S$605,000 | S$5,762 psm |
| Oct 2026 | Blk 273 · 3 ROOM · 07 TO 09 · Model A · 57 years left | 73 sqm | S$450,000 | S$6,164 psm |
| Sept 2026 | Blk 272 · 4 ROOM · 04 TO 06 · Model A · 57 years left | 103 sqm | S$570,000 | S$5,534 psm |
| Sept 2026 | Blk 285 · 3 ROOM · 04 TO 06 · Model A · 57 years left | 74 sqm | S$455,888 | S$6,161 psm |
| Sept 2026 | Blk 292 · 4 ROOM · 01 TO 03 · New Generation · 58 years left | 91 sqm | S$535,000 | S$5,879 psm |
| Sept 2026 | Blk 282 · 4 ROOM · 04 TO 06 · Model A · 57 years left | 115 sqm | S$638,000 | S$5,548 psm |
| Sept 2026 | Blk 288 · 5 ROOM · 04 TO 06 · Model A · 57 years left | 133 sqm | S$660,000 | S$4,962 psm |
| Sept 2026 | Blk 277 · 4 ROOM · 07 TO 09 · Model A · 58 years left | 106 sqm | S$610,288 | S$5,757 psm |
| Sept 2026 | Blk 282 · 4 ROOM · 07 TO 09 · Model A · 57 years left | 102 sqm | S$605,000 | S$5,931 psm |
| Sept 2026 | Blk 285 · 4 ROOM · 04 TO 06 · Model A · 57 years left | 105 sqm | S$620,000 | S$5,905 psm |
| Sept 2026 | Blk 296 · 3 ROOM · 04 TO 06 · New Generation · 58 years left | 67 sqm | S$450,000 | S$6,716 psm |
| Aug 2026 | Blk 289 · 5 ROOM · 07 TO 09 · Improved · 58 years left | 121 sqm | S$609,000 | S$5,033 psm |
| Aug 2026 | Blk 297 · 4 ROOM · 04 TO 06 · Model A · 57 years left | 105 sqm | S$610,000 | S$5,810 psm |
| Aug 2026 | Blk 291 · 4 ROOM · 10 TO 12 · Model A · 57 years left | 104 sqm | S$605,000 | S$5,817 psm |
| Aug 2026 | Blk 275 · 4 ROOM · 01 TO 03 · Model A · 58 years left | 107 sqm | S$600,000 | S$5,607 psm |
| Aug 2026 | Blk 272 · 3 ROOM · 10 TO 12 · Model A · 57 years left | 73 sqm | S$466,000 | S$6,384 psm |
| Aug 2026 | Blk 284 · 3 ROOM · 04 TO 06 · Model A · 57 years left | 74 sqm | S$480,000 | S$6,486 psm |
| Aug 2026 | Blk 284 · 3 ROOM · 10 TO 12 · Model A · 57 years left | 78 sqm | S$480,000 | S$6,154 psm |
| Aug 2026 | Blk 295 · 3 ROOM · 04 TO 06 · Model A · 57 years left | 73 sqm | S$435,888 | S$5,971 psm |
| Jul 2026 | Blk 278 · 5 ROOM · 04 TO 06 · Model A · 58 years left | 133 sqm | S$718,000 | S$5,399 psm |
| Jul 2026 | Blk 279 · 5 ROOM · 04 TO 06 · Model A · 58 years left | 133 sqm | S$700,000 | S$5,263 psm |
| Jul 2026 | Blk 279 · 5 ROOM · 07 TO 09 · Model A · 58 years left | 139 sqm | S$720,000 | S$5,180 psm |
| Jul 2026 | Blk 279 · 5 ROOM · 04 TO 06 · Model A · 58 years left | 133 sqm | S$640,000 | S$4,812 psm |
| Jul 2026 | Blk 293 · 4 ROOM · 04 TO 06 · Model A · 57 years left | 105 sqm | S$600,000 | S$5,714 psm |
| Jul 2026 | Blk 277 · 4 ROOM · 07 TO 09 · Model A · 58 years left | 104 sqm | S$600,000 | S$5,769 psm |
| Jul 2026 | Blk 283 · 4 ROOM · 10 TO 12 · Model A · 57 years left | 103 sqm | S$580,000 | S$5,631 psm |
| Jul 2026 | Blk 286 · 4 ROOM · 10 TO 12 · Model A · 57 years left | 105 sqm | S$590,000 | S$5,619 psm |
| Jul 2026 | Blk 286 · 4 ROOM · 07 TO 09 · Model A · 57 years left | 105 sqm | S$625,000 | S$5,952 psm |
| Jul 2026 | Blk 283 · 4 ROOM · 01 TO 03 · Model A · 57 years left | 103 sqm | S$600,000 | S$5,825 psm |
| Jul 2026 | Blk 297 · 4 ROOM · 07 TO 09 · Model A · 57 years left | 104 sqm | S$600,000 | S$5,769 psm |
| Jul 2026 | Blk 283 · 4 ROOM · 07 TO 09 · Model A · 57 years left | 103 sqm | S$623,000 | S$6,049 psm |
| Jul 2026 | Blk 281 · 4 ROOM · 01 TO 03 · Model A · 58 years left | 103 sqm | S$585,000 | S$5,680 psm |
| Jul 2026 | Blk 286 · 4 ROOM · 04 TO 06 · Model A · 57 years left | 103 sqm | S$618,000 | S$6,000 psm |
| Jul 2026 | Blk 283 · 4 ROOM · 01 TO 03 · Model A · 57 years left | 105 sqm | S$570,000 | S$5,429 psm |
| Jul 2026 | Blk 290 · 3 ROOM · 04 TO 06 · New Generation · 58 years left | 67 sqm | S$420,000 | S$6,269 psm |
| Jun 2026 | Blk 279 · 5 ROOM · 01 TO 03 · Model A · 58 years left | 133 sqm | S$650,000 | S$4,887 psm |
| Jun 2026 | Blk 284 · 4 ROOM · 10 TO 12 · Model A · 57 years left | 111 sqm | S$625,000 | S$5,631 psm |
| Jun 2026 | Blk 294 · 4 ROOM · 04 TO 06 · New Generation · 58 years left | 98 sqm | S$570,000 | S$5,816 psm |
| Jun 2026 | Blk 285 · 3 ROOM · 07 TO 09 · Model A · 57 years left | 84 sqm | S$522,000 | S$6,214 psm |
| Jun 2026 | Blk 275 · 3 ROOM · 01 TO 03 · Model A · 58 years left | 73 sqm | S$455,000 | S$6,233 psm |
| Jun 2026 | Blk 286 · 3 ROOM · 07 TO 09 · Model A · 57 years left | 74 sqm | S$435,000 | S$5,878 psm |
| Jun 2026 | Blk 275 · 3 ROOM · 04 TO 06 · Model A · 58 years left | 73 sqm | S$485,000 | S$6,644 psm |
| May 2026 | Blk 288 · 5 ROOM · 07 TO 09 · Model A · 57 years left | 133 sqm | S$720,000 | S$5,414 psm |
| May 2026 | Blk 275 · 4 ROOM · 01 TO 03 · Model A · 58 years left | 105 sqm | S$590,000 | S$5,619 psm |
| May 2026 | Blk 291 · 3 ROOM · 10 TO 12 · Model A · 57 years left | 73 sqm | S$475,000 | S$6,507 psm |
| Apr 2026 | Blk 298 · 5 ROOM · 01 TO 03 · Improved · 58 years left | 121 sqm | S$680,000 | S$5,620 psm |
| Apr 2026 | Blk 275 · 3 ROOM · 01 TO 03 · Model A · 58 years left | 73 sqm | S$473,000 | S$6,479 psm |
| Apr 2026 | Blk 274 · 3 ROOM · 10 TO 12 · Model A · 57 years left | 73 sqm | S$480,000 | S$6,575 psm |
| Apr 2026 | Blk 295 · 3 ROOM · 01 TO 03 · Model A · 57 years left | 73 sqm | S$450,000 | S$6,164 psm |
| Mar 2026 | Blk 277 · 4 ROOM · 07 TO 09 · Model A · 58 years left | 104 sqm | S$600,000 | S$5,769 psm |
| Mar 2026 | Blk 293 · 4 ROOM · 04 TO 06 · Model A · 57 years left | 104 sqm | S$550,000 | S$5,288 psm |
| Mar 2026 | Blk 272 · 4 ROOM · 04 TO 06 · Model A · 57 years left | 112 sqm | S$653,000 | S$5,830 psm |
| Mar 2026 | Blk 285 · 4 ROOM · 07 TO 09 · Model A · 57 years left | 103 sqm | S$608,000 | S$5,903 psm |
| Mar 2026 | Blk 285 · 3 ROOM · 04 TO 06 · Model A · 57 years left | 74 sqm | S$465,888 | S$6,296 psm |
| Feb 2026 | Blk 294 · 5 ROOM · 07 TO 09 · Improved · 58 years left | 126 sqm | S$670,000 | S$5,317 psm |
| Feb 2026 | Blk 279 · 4 ROOM · 04 TO 06 · Model A · 58 years left | 104 sqm | S$550,000 | S$5,288 psm |
| Feb 2026 | Blk 285 · 3 ROOM · 01 TO 03 · Model A · 58 years left | 74 sqm | S$480,000 | S$6,486 psm |
| Feb 2026 | Blk 296 · 3 ROOM · 07 TO 09 · New Generation · 59 years left | 67 sqm | S$455,000 | S$6,791 psm |
| Feb 2026 | Blk 283 · 3 ROOM · 01 TO 03 · Model A · 58 years left | 74 sqm | S$460,000 | S$6,216 psm |
| Jan 2026 | Blk 294 · 5 ROOM · 10 TO 12 · Improved · 59 years left | 126 sqm | S$700,000 | S$5,556 psm |
| Jan 2026 | Blk 276 · 4 ROOM · 01 TO 03 · Model A · 58 years left | 105 sqm | S$592,000 | S$5,638 psm |
| Jan 2026 | Blk 296 · 3 ROOM · 04 TO 06 · New Generation · 59 years left | 67 sqm | S$443,300 | S$6,616 psm |
| Jan 2026 | Blk 281 · 3 ROOM · 07 TO 09 · Model A · 58 years left | 74 sqm | S$460,000 | S$6,216 psm |
| Jan 2026 | Blk 295 · 3 ROOM · 07 TO 09 · Model A · 57 years left | 73 sqm | S$460,888 | S$6,314 psm |
| Dec 2025 | Blk 284 · 4 ROOM · 10 TO 12 · Model A · 58 years left | 103 sqm | S$626,500 | S$6,083 psm |
| Dec 2025 | Blk 286 · 4 ROOM · 04 TO 06 · Model A · 58 years left | 105 sqm | S$585,000 | S$5,571 psm |
| Dec 2025 | Blk 291 · 3 ROOM · 07 TO 09 · Model A · 58 years left | 73 sqm | S$465,000 | S$6,370 psm |
| Nov 2025 | Blk 278 · 5 ROOM · 04 TO 06 · Model A · 58 years left | 140 sqm | S$750,000 | S$5,357 psm |
| Nov 2025 | Blk 288 · 5 ROOM · 01 TO 03 · Model A · 58 years left | 133 sqm | S$690,000 | S$5,188 psm |
| Nov 2025 | Blk 277 · 4 ROOM · 07 TO 09 · Model A · 58 years left | 105 sqm | S$640,000 | S$6,095 psm |
| Nov 2025 | Blk 290 · 4 ROOM · 01 TO 03 · New Generation · 59 years left | 96 sqm | S$568,000 | S$5,917 psm |
| Oct 2025 | Blk 298 · 5 ROOM · 01 TO 03 · Improved · 59 years left excluded: outlier | 121 sqm | S$760,000 | S$6,281 psm |
| Oct 2025 | Blk 278 · 5 ROOM · 04 TO 06 · Model A · 59 years left | 140 sqm | S$720,000 | S$5,143 psm |
| Oct 2025 | Blk 284 · 4 ROOM · 04 TO 06 · Model A · 58 years left | 103 sqm | S$600,000 | S$5,825 psm |
| Oct 2025 | Blk 276 · 3 ROOM · 10 TO 12 · Model A · 58 years left | 74 sqm | S$490,000 | S$6,622 psm |
| Sept 2025 | Blk 274 · 4 ROOM · 04 TO 06 · Model A · 58 years left | 105 sqm | S$620,000 | S$5,905 psm |
| Sept 2025 | Blk 282 · 4 ROOM · 01 TO 03 · Model A · 57 years left | 104 sqm | S$560,000 | S$5,385 psm |
| Sept 2025 | Blk 274 · 4 ROOM · 10 TO 12 · Model A · 58 years left | 105 sqm | S$665,000 | S$6,333 psm |
| Sept 2025 | Blk 290 · 4 ROOM · 01 TO 03 · New Generation · 59 years left | 97 sqm | S$585,000 | S$6,031 psm |
| Sept 2025 | Blk 283 · 3 ROOM · 04 TO 06 · Model A · 58 years left | 84 sqm | S$530,000 | S$6,310 psm |
| Aug 2025 | Blk 283 · 4 ROOM · 01 TO 03 · Model A · 58 years left | 103 sqm | S$585,000 | S$5,680 psm |
| Aug 2025 | Blk 272 · 4 ROOM · 01 TO 03 · Model A · 58 years left | 103 sqm | S$610,000 | S$5,922 psm |
| Aug 2025 | Blk 287 · 3 ROOM · 04 TO 06 · Model A · 58 years left | 74 sqm | S$485,000 | S$6,554 psm |
| Aug 2025 | Blk 280 · 3 ROOM · 01 TO 03 · Model A · 58 years left | 74 sqm | S$440,000 | S$5,946 psm |
| Aug 2025 | Blk 275 · 3 ROOM · 01 TO 03 · Model A · 58 years left | 73 sqm | S$482,500 | S$6,610 psm |
| Jul 2025 | Blk 277 · 4 ROOM · 07 TO 09 · Model A · 59 years left | 104 sqm | S$600,000 | S$5,769 psm |
| Jul 2025 | Blk 289 · 4 ROOM · 10 TO 12 · New Generation · 59 years left | 97 sqm | S$555,000 | S$5,722 psm |
| Jul 2025 | Blk 283 · 3 ROOM · 01 TO 03 · Model A · 58 years left | 84 sqm | S$493,000 | S$5,869 psm |
| Jul 2025 | Blk 287 · 3 ROOM · 01 TO 03 · Model A · 58 years left | 74 sqm | S$475,000 | S$6,419 psm |
| Jul 2025 | Blk 273 · 3 ROOM · 07 TO 09 · Model A · 58 years left | 73 sqm | S$488,000 | S$6,685 psm |
| Jun 2025 | Blk 294 · 5 ROOM · 07 TO 09 · Improved · 59 years left | 121 sqm | S$683,888 | S$5,652 psm |
| Jun 2025 | Blk 283 · 4 ROOM · 04 TO 06 · Model A · 58 years left | 105 sqm | S$630,000 | S$6,000 psm |
| Jun 2025 | Blk 274 · 4 ROOM · 07 TO 09 · Model A · 58 years left | 105 sqm | S$655,000 | S$6,238 psm |
| Jun 2025 | Blk 281 · 4 ROOM · 04 TO 06 · Model A · 59 years left | 104 sqm | S$605,000 | S$5,817 psm |
| Jun 2025 | Blk 291 · 3 ROOM · 07 TO 09 · Model A · 58 years left | 73 sqm | S$468,000 | S$6,411 psm |
| Jun 2025 | Blk 293 · 3 ROOM · 01 TO 03 · Model A · 58 years left | 73 sqm | S$480,000 | S$6,575 psm |
| May 2025 | Blk 294 · 5 ROOM · 07 TO 09 · Improved · 59 years left | 121 sqm | S$712,000 | S$5,884 psm |
| May 2025 | Blk 272 · 4 ROOM · 01 TO 03 · Model A · 58 years left | 103 sqm | S$620,000 | S$6,019 psm |
| May 2025 | Blk 276 · 3 ROOM · 01 TO 03 · Model A · 59 years left | 80 sqm | S$480,000 | S$6,000 psm |
| May 2025 | Blk 293 · 3 ROOM · 07 TO 09 · Model A · 58 years left | 73 sqm | S$478,000 | S$6,548 psm |
| May 2025 | Blk 277 · 3 ROOM · 01 TO 03 · Model A · 59 years left | 74 sqm | S$460,000 | S$6,216 psm |
| May 2025 | Blk 277 · 3 ROOM · 07 TO 09 · Model A · 59 years left | 74 sqm | S$468,000 | S$6,324 psm |
| Apr 2025 | Blk 279 · 5 ROOM · 04 TO 06 · Model A · 59 years left | 132 sqm | S$668,000 | S$5,061 psm |
| Apr 2025 | Blk 296 · 4 ROOM · 04 TO 06 · New Generation · 59 years left | 91 sqm | S$570,000 | S$6,264 psm |
| Apr 2025 | Blk 277 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 104 sqm | S$585,000 | S$5,625 psm |
| Apr 2025 | Blk 293 · 3 ROOM · 01 TO 03 · Model A · 58 years left excluded: outlier | 73 sqm | S$390,000 | S$5,342 psm |
| Mar 2025 | Blk 298 · 5 ROOM · 04 TO 06 · Improved · 59 years left | 121 sqm | S$690,000 | S$5,702 psm |
| Mar 2025 | Blk 279 · 5 ROOM · 01 TO 03 · Model A · 59 years left | 137 sqm | S$745,000 | S$5,438 psm |
| Mar 2025 | Blk 288 · 4 ROOM · 04 TO 06 · Model A · 59 years left | 103 sqm | S$635,000 | S$6,165 psm |
| Mar 2025 | Blk 287 · 3 ROOM · 01 TO 03 · Model A · 58 years left | 74 sqm | S$450,000 | S$6,081 psm |
| Mar 2025 | Blk 296 · 3 ROOM · 07 TO 09 · New Generation · 59 years left | 67 sqm | S$460,000 | S$6,866 psm |
| Feb 2025 | Blk 288 · 5 ROOM · 04 TO 06 · Model A · 59 years left | 133 sqm | S$718,000 | S$5,399 psm |
| Feb 2025 | Blk 298 · 5 ROOM · 07 TO 09 · Improved · 59 years left | 121 sqm | S$670,000 | S$5,537 psm |
| Feb 2025 | Blk 288 · 5 ROOM · 04 TO 06 · Model A · 59 years left | 133 sqm | S$690,000 | S$5,188 psm |
| Feb 2025 | Blk 278 · 4 ROOM · 07 TO 09 · Model A · 59 years left | 104 sqm | S$638,000 | S$6,135 psm |
| Feb 2025 | Blk 285 · 4 ROOM · 07 TO 09 · Model A · 59 years left | 103 sqm | S$620,000 | S$6,019 psm |
| Feb 2025 | Blk 299A · 3 ROOM · 10 TO 12 · Model A · 86 years left | 65 sqm | S$520,000 | S$8,000 psm |
| Feb 2025 | Blk 299A · 2 ROOM · 07 TO 09 · Model A · 86 years left | 45 sqm | S$372,000 | S$8,267 psm |
| Jan 2025 | Blk 298 · 5 ROOM · 04 TO 06 · Improved · 59 years left | 126 sqm | S$707,000 | S$5,611 psm |
| Jan 2025 | Blk 294 · 5 ROOM · 01 TO 03 · Improved · 60 years left | 126 sqm | S$640,000 | S$5,079 psm |
| Jan 2025 | Blk 279 · 5 ROOM · 07 TO 09 · Model A · 59 years left | 132 sqm | S$670,000 | S$5,076 psm |
| Jan 2025 | Blk 294 · 5 ROOM · 07 TO 09 · Improved · 60 years left | 121 sqm | S$705,000 | S$5,826 psm |
| Jan 2025 | Blk 273 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 112 sqm | S$640,000 | S$5,714 psm |
| Jan 2025 | Blk 283 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 103 sqm | S$580,000 | S$5,631 psm |
| Jan 2025 | Blk 295 · 4 ROOM · 04 TO 06 · Model A · 58 years left | 105 sqm | S$600,000 | S$5,714 psm |
| Dec 2024 | Blk 293 · 4 ROOM · 04 TO 06 · Model A · 59 years left | 108 sqm | S$630,000 | S$5,833 psm |
| Dec 2024 | Blk 289 · 5 ROOM · 07 TO 09 · Improved · 59 years left | 121 sqm | S$620,000 | S$5,124 psm |
| Dec 2024 | Blk 283 · 4 ROOM · 04 TO 06 · Model A · 59 years left | 103 sqm | S$598,000 | S$5,806 psm |
| Dec 2024 | Blk 277 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 104 sqm | S$585,000 | S$5,625 psm |
| Dec 2024 | Blk 273 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 105 sqm | S$570,000 | S$5,429 psm |
| Dec 2024 | Blk 275 · 3 ROOM · 10 TO 12 · Model A · 59 years left | 73 sqm | S$450,000 | S$6,164 psm |
| Nov 2024 | Blk 291 · 4 ROOM · 10 TO 12 · Model A · 59 years left | 108 sqm | S$630,000 | S$5,833 psm |
| Nov 2024 | Blk 287 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 103 sqm | S$575,000 | S$5,583 psm |
| Nov 2024 | Blk 297 · 3 ROOM · 10 TO 12 · Model A · 59 years left | 73 sqm | S$480,000 | S$6,575 psm |
| Oct 2024 | Blk 298 · 5 ROOM · 04 TO 06 · Improved · 60 years left | 121 sqm | S$668,888 | S$5,528 psm |
| Oct 2024 | Blk 280 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 114 sqm | S$615,000 | S$5,395 psm |
| Oct 2024 | Blk 297 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 104 sqm | S$565,000 | S$5,433 psm |
| Oct 2024 | Blk 282 · 4 ROOM · 01 TO 03 · Model A · 58 years left | 102 sqm | S$554,000 | S$5,431 psm |
| Oct 2024 | Blk 279 · 4 ROOM · 07 TO 09 · Model A · 59 years left | 104 sqm | S$550,000 | S$5,288 psm |
| Oct 2024 | Blk 283 · 3 ROOM · 07 TO 09 · Model A · 59 years left | 84 sqm | S$498,800 | S$5,938 psm |
| Oct 2024 | Blk 299A · 3 ROOM · 01 TO 03 · Model A · 87 years left | 65 sqm | S$466,000 | S$7,169 psm |
| Oct 2024 | Blk 284 · 3 ROOM · 07 TO 09 · Model A · 59 years left | 74 sqm | S$460,000 | S$6,216 psm |
| Oct 2024 | Blk 275 · 3 ROOM · 07 TO 09 · Model A · 59 years left | 73 sqm | S$458,000 | S$6,274 psm |
| Oct 2024 | Blk 283 · 3 ROOM · 01 TO 03 · Model A · 59 years left | 74 sqm | S$435,000 | S$5,878 psm |
| Oct 2024 | Blk 277 · 3 ROOM · 04 TO 06 · Model A · 60 years left | 74 sqm | S$435,000 | S$5,878 psm |
| Sept 2024 | Blk 288 · 5 ROOM · 04 TO 06 · Model A · 59 years left | 139 sqm | S$680,000 | S$4,892 psm |
| Sept 2024 | Blk 278 · 5 ROOM · 01 TO 03 · Model A · 60 years left | 135 sqm | S$643,000 | S$4,763 psm |
| Sept 2024 | Blk 275 · 4 ROOM · 04 TO 06 · Model A · 59 years left | 103 sqm | S$598,000 | S$5,806 psm |
| Sept 2024 | Blk 284 · 4 ROOM · 04 TO 06 · Model A · 59 years left | 103 sqm | S$575,000 | S$5,583 psm |
| Sept 2024 | Blk 281 · 4 ROOM · 04 TO 06 · Model A · 59 years left | 103 sqm | S$560,000 | S$5,437 psm |
| Sept 2024 | Blk 274 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 105 sqm | S$560,000 | S$5,333 psm |
| Sept 2024 | Blk 276 · 4 ROOM · 07 TO 09 · Model A · 59 years left | 105 sqm | S$550,000 | S$5,238 psm |
| Sept 2024 | Blk 285 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 103 sqm | S$525,000 | S$5,097 psm |
| Sept 2024 | Blk 291 · 3 ROOM · 07 TO 09 · Model A · 59 years left | 73 sqm | S$470,000 | S$6,438 psm |
| Sept 2024 | Blk 296 · 3 ROOM · 07 TO 09 · New Generation · 60 years left excluded: outlier | 67 sqm | S$442,000 | S$6,597 psm |
| Sept 2024 | Blk 299A · 2 ROOM · 10 TO 12 · Model A · 87 years left | 45 sqm | S$373,000 | S$8,289 psm |
| Aug 2024 | Blk 289 · 5 ROOM · 10 TO 12 · Improved · 60 years left | 121 sqm | S$670,000 | S$5,537 psm |
| Aug 2024 | Blk 289 · 5 ROOM · 01 TO 03 · Improved · 60 years left | 126 sqm | S$625,000 | S$4,960 psm |
| Aug 2024 | Blk 276 · 4 ROOM · 07 TO 09 · Model A · 59 years left | 106 sqm | S$600,000 | S$5,660 psm |
| Aug 2024 | Blk 286 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 105 sqm | S$590,000 | S$5,619 psm |
| Aug 2024 | Blk 273 · 4 ROOM · 04 TO 06 · Model A · 59 years left | 103 sqm | S$590,000 | S$5,728 psm |
| Aug 2024 | Blk 295 · 3 ROOM · 10 TO 12 · Model A · 59 years left | 73 sqm | S$455,000 | S$6,233 psm |
| Aug 2024 | Blk 285 · 3 ROOM · 07 TO 09 · Model A · 59 years left | 74 sqm | S$450,000 | S$6,081 psm |
| Aug 2024 | Blk 280 · 3 ROOM · 04 TO 06 · Model A · 59 years left | 74 sqm | S$440,000 | S$5,946 psm |
| Aug 2024 | Blk 274 · 3 ROOM · 01 TO 03 · Model A · 59 years left | 73 sqm | S$435,000 | S$5,959 psm |
| Aug 2024 | Blk 293 · 3 ROOM · 07 TO 09 · Model A · 59 years left | 73 sqm | S$427,000 | S$5,849 psm |
| Jul 2024 | Blk 279 · 5 ROOM · 07 TO 09 · Model A · 60 years left | 137 sqm | S$700,888 | S$5,116 psm |
| Jul 2024 | Blk 278 · 5 ROOM · 10 TO 12 · Model A · 60 years left | 132 sqm | S$680,000 | S$5,152 psm |
| Jul 2024 | Blk 294 · 5 ROOM · 10 TO 12 · Improved · 60 years left | 128 sqm | S$676,000 | S$5,281 psm |
| Jul 2024 | Blk 293 · 4 ROOM · 10 TO 12 · Model A · 59 years left | 108 sqm | S$625,000 | S$5,787 psm |
| Jul 2024 | Blk 275 · 3 ROOM · 07 TO 09 · Model A · 60 years left | 73 sqm | S$445,000 | S$6,096 psm |
| Jul 2024 | Blk 287 · 3 ROOM · 01 TO 03 · Model A · 59 years left | 74 sqm | S$432,000 | S$5,838 psm |
| Jul 2024 | Blk 295 · 3 ROOM · 07 TO 09 · Model A · 59 years left | 73 sqm | S$420,000 | S$5,753 psm |
| Jul 2024 | Blk 287 · 3 ROOM · 01 TO 03 · Model A · 59 years left excluded: outlier | 74 sqm | S$400,000 | S$5,405 psm |
| Jul 2024 | Blk 299A · 2 ROOM · 07 TO 09 · Model A · 87 years left | 45 sqm | S$365,000 | S$8,111 psm |
| Jun 2024 | Blk 278 · 5 ROOM · 04 TO 06 · Model A · 60 years left | 141 sqm | S$685,000 | S$4,858 psm |
| Jun 2024 | Blk 294 · 5 ROOM · 04 TO 06 · Improved · 60 years left | 121 sqm | S$630,000 | S$5,207 psm |
| Jun 2024 | Blk 284 · 4 ROOM · 10 TO 12 · Model A · 59 years left | 103 sqm | S$578,888 | S$5,620 psm |
| Jun 2024 | Blk 287 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 103 sqm | S$525,000 | S$5,097 psm |
| Jun 2024 | Blk 285 · 3 ROOM · 04 TO 06 · Model A · 59 years left | 78 sqm | S$468,000 | S$6,000 psm |
| Jun 2024 | Blk 293 · 3 ROOM · 07 TO 09 · Model A · 59 years left | 73 sqm | S$442,000 | S$6,055 psm |
| Jun 2024 | Blk 297 · 3 ROOM · 01 TO 03 · Model A · 59 years left | 73 sqm | S$435,000 | S$5,959 psm |
| May 2024 | Blk 279 · 5 ROOM · 01 TO 03 · Model A · 60 years left | 135 sqm | S$635,000 | S$4,704 psm |
| May 2024 | Blk 294 · 5 ROOM · 04 TO 06 · Improved · 60 years left | 121 sqm | S$630,000 | S$5,207 psm |
| May 2024 | Blk 286 · 4 ROOM · 10 TO 12 · Model A · 59 years left | 103 sqm | S$590,000 | S$5,728 psm |
| May 2024 | Blk 296 · 3 ROOM · 04 TO 06 · New Generation · 60 years left excluded: outlier | 67 sqm | S$435,000 | S$6,493 psm |
| May 2024 | Blk 274 · 3 ROOM · 04 TO 06 · Model A · 59 years left | 73 sqm | S$425,000 | S$5,822 psm |
| May 2024 | Blk 299A · 2 ROOM · 07 TO 09 · Model A · 87 years left | 45 sqm | S$355,000 | S$7,889 psm |
| Apr 2024 | Blk 298 · 5 ROOM · 07 TO 09 · Improved · 60 years left | 121 sqm | S$660,000 | S$5,455 psm |
| Apr 2024 | Blk 294 · 5 ROOM · 04 TO 06 · Improved · 60 years left | 130 sqm | S$635,000 | S$4,885 psm |
| Apr 2024 | Blk 274 · 4 ROOM · 04 TO 06 · Model A · 59 years left | 103 sqm | S$570,000 | S$5,534 psm |
| Apr 2024 | Blk 286 · 4 ROOM · 04 TO 06 · Model A · 59 years left | 103 sqm | S$522,000 | S$5,068 psm |
| Apr 2024 | Blk 286 · 3 ROOM · 04 TO 06 · Model A · 59 years left | 74 sqm | S$435,000 | S$5,878 psm |
| Apr 2024 | Blk 282 · 3 ROOM · 07 TO 09 · Model A · 59 years left | 74 sqm | S$428,000 | S$5,784 psm |
| Apr 2024 | Blk 291 · 3 ROOM · 10 TO 12 · Model A · 59 years left | 73 sqm | S$426,422 | S$5,841 psm |
| Mar 2024 | Blk 298 · 5 ROOM · 07 TO 09 · Improved · 60 years left | 121 sqm | S$650,088 | S$5,373 psm |
| Mar 2024 | Blk 298 · 5 ROOM · 04 TO 06 · Improved · 60 years left | 130 sqm | S$635,000 | S$4,885 psm |
| Mar 2024 | Blk 283 · 4 ROOM · 10 TO 12 · Model A · 60 years left | 103 sqm | S$575,000 | S$5,583 psm |
| Mar 2024 | Blk 285 · 4 ROOM · 10 TO 12 · Model A · 60 years left | 103 sqm | S$568,888 | S$5,523 psm |
| Mar 2024 | Blk 297 · 4 ROOM · 10 TO 12 · Model A · 59 years left | 104 sqm | S$565,000 | S$5,433 psm |
| Mar 2024 | Blk 272 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 103 sqm | S$565,000 | S$5,485 psm |
| Mar 2024 | Blk 284 · 4 ROOM · 10 TO 12 · Model A · 59 years left | 103 sqm | S$562,000 | S$5,456 psm |
| Mar 2024 | Blk 287 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 102 sqm | S$520,000 | S$5,098 psm |
| Mar 2024 | Blk 292 · 4 ROOM · 01 TO 03 · New Generation · 60 years left | 91 sqm | S$492,000 | S$5,407 psm |
| Mar 2024 | Blk 272 · 3 ROOM · 07 TO 09 · Model A · 59 years left | 73 sqm | S$430,000 | S$5,890 psm |
| Mar 2024 | Blk 287 · 3 ROOM · 04 TO 06 · Model A · 59 years left | 74 sqm | S$426,000 | S$5,757 psm |
| Mar 2024 | Blk 295 · 3 ROOM · 01 TO 03 · Model A · 59 years left | 73 sqm | S$406,000 | S$5,562 psm |
| Mar 2024 | Blk 299A · 2 ROOM · 01 TO 03 · Model A · 87 years left | 45 sqm | S$350,000 | S$7,778 psm |
| Feb 2024 | Blk 298 · 5 ROOM · 10 TO 12 · Improved · 60 years left | 126 sqm | S$650,000 | S$5,159 psm |
| Feb 2024 | Blk 289 · 5 ROOM · 07 TO 09 · Improved · 60 years left | 121 sqm | S$588,000 | S$4,860 psm |
| Feb 2024 | Blk 275 · 4 ROOM · 01 TO 03 · Model A · 60 years left | 109 sqm | S$563,000 | S$5,165 psm |
| Feb 2024 | Blk 277 · 4 ROOM · 04 TO 06 · Model A · 60 years left | 104 sqm | S$550,000 | S$5,288 psm |
| Feb 2024 | Blk 280 · 3 ROOM · 04 TO 06 · Model A · 60 years left | 74 sqm | S$426,000 | S$5,757 psm |
| Feb 2024 | Blk 297 · 3 ROOM · 07 TO 09 · Model A · 59 years left | 73 sqm | S$420,000 | S$5,753 psm |
| Jan 2024 | Blk 279 · 5 ROOM · 07 TO 09 · Model A · 60 years left | 133 sqm | S$645,000 | S$4,850 psm |
| Jan 2024 | Blk 275 · 4 ROOM · 04 TO 06 · Model A · 60 years left | 103 sqm | S$570,000 | S$5,534 psm |
| Jan 2024 | Blk 297 · 4 ROOM · 04 TO 06 · Model A · 59 years left | 105 sqm | S$555,000 | S$5,286 psm |
| Jan 2024 | Blk 277 · 3 ROOM · 04 TO 06 · Model A · 60 years left | 76 sqm | S$440,000 | S$5,789 psm |
| Jan 2024 | Blk 273 · 3 ROOM · 10 TO 12 · Model A · 60 years left | 77 sqm | S$430,000 | S$5,584 psm |
| Jan 2024 | Blk 291 · 3 ROOM · 07 TO 09 · Model A · 60 years left | 73 sqm | S$425,000 | S$5,822 psm |
| Jan 2024 | Blk 291 · 3 ROOM · 01 TO 03 · Model A · 60 years left | 73 sqm | S$401,888 | S$5,505 psm |
| Jan 2024 | Blk 299A · 2 ROOM · 07 TO 09 · Model A · 87 years left | 45 sqm | S$340,000 | S$7,556 psm |
| Jan 2024 | Blk 299A · 2 ROOM · 04 TO 06 · Model A · 87 years left | 45 sqm | S$328,000 | S$7,289 psm |
| Dec 2023 | Blk 298 · 5 ROOM · 04 TO 06 · Improved · 60 years left | 126 sqm | S$625,000 | S$4,960 psm |
| Dec 2023 | Blk 283 · 4 ROOM · 07 TO 09 · Model A · 60 years left | 103 sqm | S$520,000 | S$5,049 psm |
| Dec 2023 | Blk 272 · 3 ROOM · 10 TO 12 · Model A · 60 years left | 82 sqm | S$453,000 | S$5,524 psm |
| Dec 2023 | Blk 273 · 3 ROOM · 04 TO 06 · Model A · 60 years left | 73 sqm | S$430,000 | S$5,890 psm |
| Dec 2023 | Blk 287 · 3 ROOM · 04 TO 06 · Model A · 60 years left | 74 sqm | S$410,000 | S$5,541 psm |
| Nov 2023 | Blk 288 · 5 ROOM · 04 TO 06 · Model A · 60 years left | 133 sqm | S$630,000 | S$4,737 psm |
| Nov 2023 | Blk 294 · 5 ROOM · 01 TO 03 · Improved · 61 years left | 121 sqm | S$605,000 | S$5,000 psm |
| Nov 2023 | Blk 275 · 4 ROOM · 10 TO 12 · Model A · 60 years left | 105 sqm | S$580,000 | S$5,524 psm |
| Nov 2023 | Blk 283 · 4 ROOM · 04 TO 06 · Model A · 60 years left | 103 sqm | S$525,000 | S$5,097 psm |
| Nov 2023 | Blk 297 · 3 ROOM · 04 TO 06 · Model A · 60 years left | 73 sqm | S$430,000 | S$5,890 psm |
| Nov 2023 | Blk 284 · 3 ROOM · 10 TO 12 · Model A · 60 years left | 74 sqm | S$430,000 | S$5,811 psm |
| Nov 2023 | Blk 296 · 3 ROOM · 04 TO 06 · New Generation · 61 years left excluded: outlier | 67 sqm | S$416,000 | S$6,209 psm |
| Nov 2023 | Blk 287 · 3 ROOM · 01 TO 03 · Model A · 60 years left | 74 sqm | S$400,000 | S$5,405 psm |
| Oct 2023 | Blk 289 · 5 ROOM · 10 TO 12 · Improved · 61 years left | 123 sqm | S$648,888 | S$5,276 psm |
| Oct 2023 | Blk 279 · 5 ROOM · 07 TO 09 · Model A · 60 years left | 133 sqm | S$640,888 | S$4,819 psm |
| Oct 2023 | Blk 280 · 4 ROOM · 07 TO 09 · Model A · 60 years left | 103 sqm | S$578,000 | S$5,612 psm |
| Oct 2023 | Blk 274 · 4 ROOM · 10 TO 12 · Model A · 60 years left | 105 sqm | S$568,888 | S$5,418 psm |
| Oct 2023 | Blk 291 · 4 ROOM · 04 TO 06 · Model A · 60 years left | 108 sqm | S$548,000 | S$5,074 psm |
| Oct 2023 | Blk 273 · 4 ROOM · 04 TO 06 · Model A · 60 years left | 103 sqm | S$547,000 | S$5,311 psm |
| Oct 2023 | Blk 274 · 3 ROOM · 01 TO 03 · Model A · 60 years left | 77 sqm | S$430,000 | S$5,584 psm |
| Oct 2023 | Blk 295 · 3 ROOM · 07 TO 09 · Model A · 60 years left | 73 sqm | S$423,888 | S$5,807 psm |
| Oct 2023 | Blk 276 · 3 ROOM · 07 TO 09 · Model A · 60 years left | 74 sqm | S$415,000 | S$5,608 psm |
| Oct 2023 | Blk 296 · 3 ROOM · 04 TO 06 · New Generation · 61 years left | 67 sqm | S$370,000 | S$5,522 psm |
| Sept 2023 | Blk 294 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 126 sqm | S$625,000 | S$4,960 psm |
| Sept 2023 | Blk 275 · 4 ROOM · 07 TO 09 · Model A · 60 years left | 105 sqm | S$555,000 | S$5,286 psm |
| Sept 2023 | Blk 289 · 5 ROOM · 04 TO 06 · Improved · 61 years left excluded: outlier | 126 sqm | S$545,000 | S$4,325 psm |
| Sept 2023 | Blk 284 · 4 ROOM · 04 TO 06 · Model A · 60 years left | 105 sqm | S$530,000 | S$5,048 psm |
| Sept 2023 | Blk 272 · 4 ROOM · 01 TO 03 · Model A · 60 years left | 103 sqm | S$520,000 | S$5,049 psm |
| Sept 2023 | Blk 276 · 4 ROOM · 07 TO 09 · Model A · 60 years left | 105 sqm | S$510,000 | S$4,857 psm |
| Sept 2023 | Blk 272 · 3 ROOM · 07 TO 09 · Model A · 60 years left | 83 sqm | S$455,000 | S$5,482 psm |
| Sept 2023 | Blk 275 · 3 ROOM · 07 TO 09 · Model A · 60 years left | 73 sqm | S$435,000 | S$5,959 psm |
| Sept 2023 | Blk 283 · 3 ROOM · 10 TO 12 · Model A · 60 years left | 74 sqm | S$420,000 | S$5,676 psm |
| Sept 2023 | Blk 299A · 2 ROOM · 01 TO 03 · Model A · 88 years left | 45 sqm | S$305,000 | S$6,778 psm |
| Aug 2023 | Blk 276 · 4 ROOM · 07 TO 09 · Model A · 61 years left | 105 sqm | S$560,000 | S$5,333 psm |
| Aug 2023 | Blk 295 · 4 ROOM · 04 TO 06 · Model A · 60 years left | 105 sqm | S$545,000 | S$5,190 psm |
| Aug 2023 | Blk 288 · 4 ROOM · 04 TO 06 · Model A · 60 years left | 103 sqm | S$540,000 | S$5,243 psm |
| Aug 2023 | Blk 291 · 4 ROOM · 01 TO 03 · Model A · 60 years left | 104 sqm | S$505,000 | S$4,856 psm |
| Aug 2023 | Blk 283 · 3 ROOM · 10 TO 12 · Model A · 60 years left | 83 sqm | S$460,000 | S$5,542 psm |
| Aug 2023 | Blk 274 · 3 ROOM · 10 TO 12 · Model A · 60 years left excluded: outlier | 73 sqm | S$443,000 | S$6,068 psm |
| Aug 2023 | Blk 291 · 3 ROOM · 04 TO 06 · Model A · 60 years left | 73 sqm | S$400,000 | S$5,479 psm |
| Jul 2023 | Blk 294 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 130 sqm | S$628,000 | S$4,831 psm |
| Jul 2023 | Blk 289 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 121 sqm | S$600,000 | S$4,959 psm |
| Jul 2023 | Blk 289 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 121 sqm | S$582,888 | S$4,817 psm |
| Jul 2023 | Blk 273 · 4 ROOM · 01 TO 03 · Model A · 60 years left | 103 sqm | S$560,000 | S$5,437 psm |
| Jul 2023 | Blk 272 · 4 ROOM · 01 TO 03 · Model A · 60 years left | 103 sqm | S$538,000 | S$5,223 psm |
| Jul 2023 | Blk 285 · 4 ROOM · 01 TO 03 · Model A · 60 years left | 103 sqm | S$510,000 | S$4,951 psm |
| Jul 2023 | Blk 280 · 3 ROOM · 04 TO 06 · Model A · 60 years left | 74 sqm | S$425,000 | S$5,743 psm |
| Jul 2023 | Blk 286 · 3 ROOM · 07 TO 09 · Model A · 60 years left | 74 sqm | S$420,000 | S$5,676 psm |
| Jul 2023 | Blk 283 · 3 ROOM · 07 TO 09 · Model A · 60 years left | 74 sqm | S$415,000 | S$5,608 psm |
| Jun 2023 | Blk 279 · 5 ROOM · 10 TO 12 · Model A · 61 years left | 133 sqm | S$640,000 | S$4,812 psm |
| Jun 2023 | Blk 289 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 121 sqm | S$598,888 | S$4,949 psm |
| Jun 2023 | Blk 294 · 5 ROOM · 01 TO 03 · Improved · 61 years left | 121 sqm | S$590,000 | S$4,876 psm |
| Jun 2023 | Blk 275 · 4 ROOM · 01 TO 03 · Model A · 61 years left | 103 sqm | S$535,000 | S$5,194 psm |
| Jun 2023 | Blk 277 · 4 ROOM · 07 TO 09 · Model A · 61 years left | 105 sqm | S$530,000 | S$5,048 psm |
| Jun 2023 | Blk 279 · 4 ROOM · 07 TO 09 · Model A · 61 years left excluded: outlier | 104 sqm | S$465,000 | S$4,471 psm |
| Jun 2023 | Blk 280 · 3 ROOM · 10 TO 12 · Model A · 60 years left | 84 sqm | S$450,888 | S$5,368 psm |
| Jun 2023 | Blk 293 · 3 ROOM · 04 TO 06 · Model A · 60 years left | 73 sqm | S$408,000 | S$5,589 psm |
| Jun 2023 | Blk 276 · 3 ROOM · 01 TO 03 · Model A · 61 years left | 74 sqm | S$405,000 | S$5,473 psm |
| Jun 2023 | Blk 296 · 3 ROOM · 04 TO 06 · New Generation · 61 years left excluded: outlier | 67 sqm | S$398,000 | S$5,940 psm |
| Jun 2023 | Blk 295 · 3 ROOM · 04 TO 06 · Model A · 60 years left | 73 sqm | S$390,000 | S$5,342 psm |
| Jun 2023 | Blk 299A · 2 ROOM · 04 TO 06 · Model A · 88 years left | 45 sqm | S$335,000 | S$7,444 psm |
| May 2023 | Blk 285 · 4 ROOM · 07 TO 09 · Model A · 60 years left | 103 sqm | S$563,000 | S$5,466 psm |
| May 2023 | Blk 283 · 4 ROOM · 10 TO 12 · Model A · 60 years left | 103 sqm | S$545,000 | S$5,291 psm |
| May 2023 | Blk 275 · 4 ROOM · 04 TO 06 · Model A · 61 years left | 103 sqm | S$545,000 | S$5,291 psm |
| May 2023 | Blk 293 · 4 ROOM · 01 TO 03 · Model A · 60 years left | 105 sqm | S$515,000 | S$4,905 psm |
| May 2023 | Blk 280 · 3 ROOM · 07 TO 09 · Model A · 60 years left | 84 sqm | S$455,000 | S$5,417 psm |
| May 2023 | Blk 297 · 3 ROOM · 04 TO 06 · Model A · 60 years left | 73 sqm | S$420,000 | S$5,753 psm |
| Apr 2023 | Blk 295 · 3 ROOM · 07 TO 09 · Model A · 60 years left | 73 sqm | S$420,000 | S$5,753 psm |
| Apr 2023 | Blk 280 · 3 ROOM · 07 TO 09 · Model A · 60 years left | 74 sqm | S$400,000 | S$5,405 psm |
| Mar 2023 | Blk 289 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 126 sqm | S$600,000 | S$4,762 psm |
| Mar 2023 | Blk 279 · 5 ROOM · 04 TO 06 · Model A · 61 years left | 132 sqm | S$600,000 | S$4,545 psm |
| Mar 2023 | Blk 277 · 4 ROOM · 07 TO 09 · Model A · 61 years left | 108 sqm | S$572,000 | S$5,296 psm |
| Mar 2023 | Blk 279 · 4 ROOM · 07 TO 09 · Model A · 61 years left | 104 sqm | S$560,000 | S$5,385 psm |
| Mar 2023 | Blk 295 · 4 ROOM · 07 TO 09 · Model A · 60 years left | 104 sqm | S$550,000 | S$5,288 psm |
| Mar 2023 | Blk 284 · 4 ROOM · 10 TO 12 · Model A · 60 years left | 105 sqm | S$518,888 | S$4,942 psm |
Showing 300 of 1876.
Sale prices as filed in caveats.
| Period | Detail | Monthly rent | Per area |
|---|---|---|---|
| Sept 2026 | Blk 285 · 4 ROOM | S$3,300 | — |
| Sept 2026 | Blk 299A · 3 ROOM | S$3,000 | — |
| Sept 2026 | Blk 297 · 3 ROOM | S$3,000 | — |
| Sept 2026 | Blk 275 · 3 ROOM | S$2,925 | — |
| Sept 2026 | Blk 276 · 3 ROOM | S$2,800 | — |
| Sept 2026 | Blk 297 · 3 ROOM | S$2,500 | — |
| Sept 2026 | Blk 284 · 4 ROOM | S$2,400 | — |
| Sept 2026 | Blk 287 · 4 ROOM | S$2,300 | — |
| Sept 2026 | Blk 285 · 4 ROOM | S$900 | — |
| Aug 2026 | Blk 284 · 4 ROOM | S$3,800 | — |
| Aug 2026 | Blk 272 · 4 ROOM | S$3,600 | — |
| Aug 2026 | Blk 296 · 4 ROOM | S$3,600 | — |
| Aug 2026 | Blk 275 · 3 ROOM | S$3,400 | — |
| Aug 2026 | Blk 273 · 4 ROOM | S$3,200 | — |
| Aug 2026 | Blk 281 · 3 ROOM | S$3,100 | — |
| Aug 2026 | Blk 287 · 3 ROOM | S$2,950 | — |
| Aug 2026 | Blk 295 · 3 ROOM | S$2,900 | — |
| Aug 2026 | Blk 277 · 3 ROOM | S$2,900 | — |
| Aug 2026 | Blk 281 · 3 ROOM | S$2,900 | — |
| Aug 2026 | Blk 274 · 3 ROOM | S$2,850 | — |
| Jul 2026 | Blk 294 · 5 ROOM | S$3,700 | — |
| Jul 2026 | Blk 274 · 4 ROOM | S$3,700 | — |
| Jul 2026 | Blk 277 · 4 ROOM | S$3,500 | — |
| Jul 2026 | Blk 293 · 4 ROOM | S$3,350 | — |
| Jul 2026 | Blk 283 · 4 ROOM | S$3,300 | — |
| Jul 2026 | Blk 283 · 3 ROOM | S$3,150 | — |
| Jul 2026 | Blk 272 · 3 ROOM | S$3,000 | — |
| Jul 2026 | Blk 275 · 4 ROOM | S$3,000 | — |
| Jul 2026 | Blk 272 · 4 ROOM | S$2,800 | — |
| Jul 2026 | Blk 274 · 3 ROOM | S$2,800 | — |
| Jul 2026 | Blk 294 · 4 ROOM | S$2,800 | — |
| Jul 2026 | Blk 285 · 3 ROOM | S$2,750 | — |
| Jul 2026 | Blk 299A · 2 ROOM | S$2,550 | — |
| Jul 2026 | Blk 285 · 3 ROOM | S$2,000 | — |
| Jun 2026 | Blk 276 · 4 ROOM | S$4,000 | — |
| Jun 2026 | Blk 298 · 5 ROOM | S$3,800 | — |
| Jun 2026 | Blk 288 · 4 ROOM | S$3,700 | — |
| Jun 2026 | Blk 285 · 4 ROOM | S$3,500 | — |
| Jun 2026 | Blk 297 · 4 ROOM | S$3,420 | — |
| Jun 2026 | Blk 287 · 4 ROOM | S$3,400 | — |
| Jun 2026 | Blk 283 · 4 ROOM | S$3,200 | — |
| Jun 2026 | Blk 272 · 4 ROOM | S$3,200 | — |
| Jun 2026 | Blk 289 · 5 ROOM | S$3,150 | — |
| Jun 2026 | Blk 283 · 4 ROOM | S$3,100 | — |
| Jun 2026 | Blk 272 · 3 ROOM | S$3,000 | — |
| Jun 2026 | Blk 290 · 3 ROOM | S$2,800 | — |
| Jun 2026 | Blk 277 · 3 ROOM | S$2,800 | — |
| May 2026 | Blk 289 · 5 ROOM | S$4,880 | — |
| May 2026 | Blk 294 · 4 ROOM | S$3,500 | — |
| May 2026 | Blk 273 · 3 ROOM | S$3,000 | — |
| May 2026 | Blk 272 · 3 ROOM | S$3,000 | — |
| May 2026 | Blk 274 · 3 ROOM | S$2,800 | — |
| May 2026 | Blk 285 · 3 ROOM | S$2,600 | — |
| May 2026 | Blk 282 · 3 ROOM | S$2,100 | — |
| Apr 2026 | Blk 288 · 5 ROOM | S$4,000 | — |
| Apr 2026 | Blk 284 · 4 ROOM | S$3,500 | — |
| Apr 2026 | Blk 289 · 4 ROOM | S$3,200 | — |
| Apr 2026 | Blk 287 · 3 ROOM | S$3,000 | — |
| Apr 2026 | Blk 290 · 3 ROOM | S$3,000 | — |
| Apr 2026 | Blk 280 · 3 ROOM | S$2,900 | — |
| Apr 2026 | Blk 286 · 3 ROOM | S$2,800 | — |
| Mar 2026 | Blk 280 · 4 ROOM | S$3,800 | — |
| Mar 2026 | Blk 290 · 4 ROOM | S$3,450 | — |
| Mar 2026 | Blk 296 · 3 ROOM | S$3,000 | — |
| Mar 2026 | Blk 295 · 3 ROOM | S$3,000 | — |
| Mar 2026 | Blk 275 · 3 ROOM | S$2,300 | — |
| Mar 2026 | Blk 293 · 3 ROOM | S$2,150 | — |
| Feb 2026 | Blk 288 · 5 ROOM | S$3,950 | — |
| Feb 2026 | Blk 297 · 4 ROOM | S$3,700 | — |
| Feb 2026 | Blk 297 · 4 ROOM | S$3,500 | — |
| Feb 2026 | Blk 275 · 3 ROOM | S$3,200 | — |
| Feb 2026 | Blk 298 · 5 ROOM | S$3,200 | — |
| Feb 2026 | Blk 272 · 3 ROOM | S$3,000 | — |
| Feb 2026 | Blk 276 · 3 ROOM | S$3,000 | — |
| Jan 2026 | Blk 283 · 4 ROOM | S$3,600 | — |
| Jan 2026 | Blk 281 · 4 ROOM | S$3,400 | — |
| Jan 2026 | Blk 286 · 4 ROOM | S$3,300 | — |
| Jan 2026 | Blk 287 · 4 ROOM | S$3,200 | — |
| Jan 2026 | Blk 274 · 3 ROOM | S$3,000 | — |
| Jan 2026 | Blk 283 · 3 ROOM | S$3,000 | — |
| Jan 2026 | Blk 283 · 3 ROOM | S$3,000 | — |
| Jan 2026 | Blk 286 · 3 ROOM | S$2,900 | — |
| Jan 2026 | Blk 289 · 5 ROOM | S$2,900 | — |
| Jan 2026 | Blk 286 · 3 ROOM | S$2,800 | — |
| Jan 2026 | Blk 273 · 4 ROOM | S$1,900 | — |
| Dec 2025 | Blk 278 · 5 ROOM | S$4,000 | — |
| Dec 2025 | Blk 278 · 5 ROOM | S$4,000 | — |
| Dec 2025 | Blk 294 · 4 ROOM | S$3,500 | — |
| Dec 2025 | Blk 293 · 4 ROOM | S$3,300 | — |
| Dec 2025 | Blk 291 · 4 ROOM | S$3,200 | — |
| Dec 2025 | Blk 293 · 3 ROOM | S$3,000 | — |
| Dec 2025 | Blk 290 · 3 ROOM | S$2,800 | — |
| Dec 2025 | Blk 276 · 3 ROOM | S$2,750 | — |
| Dec 2025 | Blk 286 · 4 ROOM | S$1,200 | — |
| Nov 2025 | Blk 282 · 4 ROOM | S$3,800 | — |
| Nov 2025 | Blk 283 · 4 ROOM | S$3,800 | — |
| Nov 2025 | Blk 277 · 4 ROOM | S$3,450 | — |
| Nov 2025 | Blk 285 · 4 ROOM | S$3,300 | — |
| Nov 2025 | Blk 283 · 4 ROOM | S$3,300 | — |
| Nov 2025 | Blk 295 · 4 ROOM | S$3,200 | — |
| Nov 2025 | Blk 293 · 3 ROOM | S$2,900 | — |
| Nov 2025 | Blk 272 · 3 ROOM | S$2,800 | — |
| Nov 2025 | Blk 298 · 4 ROOM | S$2,800 | — |
| Nov 2025 | Blk 290 · 3 ROOM | S$2,650 | — |
| Nov 2025 | Blk 285 · 3 ROOM | S$2,600 | — |
| Nov 2025 | Blk 277 · 3 ROOM | S$2,600 | — |
| Nov 2025 | Blk 285 · 3 ROOM | S$2,000 | — |
| Nov 2025 | Blk 274 · 3 ROOM | S$1,500 | — |
| Oct 2025 | Blk 286 · 4 ROOM | S$3,600 | — |
| Oct 2025 | Blk 280 · 4 ROOM | S$3,600 | — |
| Oct 2025 | Blk 281 · 4 ROOM | S$3,500 | — |
| Oct 2025 | Blk 293 · 4 ROOM | S$3,300 | — |
| Oct 2025 | Blk 281 · 4 ROOM | S$3,100 | — |
| Oct 2025 | Blk 284 · 4 ROOM | S$3,000 | — |
| Oct 2025 | Blk 281 · 3 ROOM | S$3,000 | — |
| Oct 2025 | Blk 283 · 3 ROOM | S$2,700 | — |
| Oct 2025 | Blk 299A · 2 ROOM | S$2,350 | — |
| Sept 2025 | Blk 278 · 5 ROOM | S$3,400 | — |
| Sept 2025 | Blk 275 · 4 ROOM | S$3,200 | — |
| Sept 2025 | Blk 283 · 4 ROOM | S$3,100 | — |
| Sept 2025 | Blk 275 · 4 ROOM | S$3,000 | — |
| Sept 2025 | Blk 299A · 3 ROOM | S$3,000 | — |
| Sept 2025 | Blk 275 · 3 ROOM | S$2,500 | — |
| Sept 2025 | Blk 273 · 4 ROOM | S$1,900 | — |
| Aug 2025 | Blk 281 · 4 ROOM | S$3,400 | — |
| Aug 2025 | Blk 293 · 4 ROOM | S$3,200 | — |
| Aug 2025 | Blk 272 · 3 ROOM | S$3,000 | — |
| Aug 2025 | Blk 285 · 3 ROOM | S$2,750 | — |
| Aug 2025 | Blk 299A · 3 ROOM | S$2,680 | — |
| Aug 2025 | Blk 289 · 5 ROOM | S$2,000 | — |
| Aug 2025 | Blk 284 · 3 ROOM | S$2,000 | — |
| Jul 2025 | Blk 288 · 5 ROOM | S$3,800 | — |
| Jul 2025 | Blk 284 · 4 ROOM | S$3,600 | — |
| Jul 2025 | Blk 281 · 4 ROOM | S$3,500 | — |
| Jul 2025 | Blk 290 · 4 ROOM | S$3,400 | — |
| Jul 2025 | Blk 283 · 3 ROOM | S$3,100 | — |
| Jul 2025 | Blk 283 · 4 ROOM | S$3,000 | — |
| Jul 2025 | Blk 281 · 4 ROOM | S$3,000 | — |
| Jul 2025 | Blk 285 · 3 ROOM | S$2,900 | — |
| Jul 2025 | Blk 274 · 3 ROOM | S$2,800 | — |
| Jul 2025 | Blk 275 · 3 ROOM | S$2,500 | — |
| Jul 2025 | Blk 273 · 4 ROOM | S$2,000 | — |
| Jun 2025 | Blk 294 · 4 ROOM | S$3,500 | — |
| Jun 2025 | Blk 294 · 5 ROOM | S$3,500 | — |
| Jun 2025 | Blk 287 · 4 ROOM | S$3,500 | — |
| Jun 2025 | Blk 289 · 5 ROOM | S$3,400 | — |
| Jun 2025 | Blk 289 · 5 ROOM | S$3,200 | — |
| Jun 2025 | Blk 272 · 3 ROOM | S$3,000 | — |
| Jun 2025 | Blk 275 · 3 ROOM | S$3,000 | — |
| Jun 2025 | Blk 284 · 3 ROOM | S$3,000 | — |
| Jun 2025 | Blk 287 · 4 ROOM | S$2,800 | — |
| Jun 2025 | Blk 285 · 4 ROOM | S$2,800 | — |
| Jun 2025 | Blk 274 · 3 ROOM | S$2,600 | — |
| Jun 2025 | Blk 277 · 3 ROOM | S$2,100 | — |
| May 2025 | Blk 274 · 4 ROOM | S$3,700 | — |
| May 2025 | Blk 277 · 3 ROOM | S$3,250 | — |
| May 2025 | Blk 276 · 3 ROOM | S$3,000 | — |
| May 2025 | Blk 293 · 3 ROOM | S$3,000 | — |
| May 2025 | Blk 274 · 3 ROOM | S$2,900 | — |
| May 2025 | Blk 285 · 3 ROOM | S$2,600 | — |
| May 2025 | Blk 274 · 3 ROOM | S$2,600 | — |
| May 2025 | Blk 286 · 3 ROOM | S$2,600 | — |
| May 2025 | Blk 297 · 3 ROOM | S$2,500 | — |
| May 2025 | Blk 276 · 3 ROOM | S$2,400 | — |
| May 2025 | Blk 285 · 3 ROOM | S$2,350 | — |
| May 2025 | Blk 282 · 3 ROOM | S$2,100 | — |
| May 2025 | Blk 275 · 4 ROOM | S$2,000 | — |
| May 2025 | Blk 280 · 4 ROOM | S$1,600 | — |
| Apr 2025 | Blk 291 · 3 ROOM | S$3,500 | — |
| Apr 2025 | Blk 295 · 4 ROOM | S$3,500 | — |
| Apr 2025 | Blk 286 · 4 ROOM | S$3,300 | — |
| Apr 2025 | Blk 272 · 4 ROOM | S$3,300 | — |
| Apr 2025 | Blk 289 · 4 ROOM | S$3,100 | — |
| Apr 2025 | Blk 297 · 3 ROOM | S$3,000 | — |
| Apr 2025 | Blk 290 · 3 ROOM | S$3,000 | — |
| Apr 2025 | Blk 275 · 3 ROOM | S$2,900 | — |
| Apr 2025 | Blk 275 · 3 ROOM | S$2,800 | — |
| Apr 2025 | Blk 293 · 3 ROOM | S$2,800 | — |
| Apr 2025 | Blk 297 · 3 ROOM | S$2,600 | — |
| Apr 2025 | Blk 285 · 3 ROOM | S$2,500 | — |
| Apr 2025 | Blk 293 · 3 ROOM | S$2,200 | — |
| Apr 2025 | Blk 291 · 3 ROOM | S$1,600 | — |
| Mar 2025 | Blk 285 · 4 ROOM | S$3,700 | — |
| Mar 2025 | Blk 283 · 4 ROOM | S$3,300 | — |
| Mar 2025 | Blk 298 · 5 ROOM | S$3,168 | — |
| Mar 2025 | Blk 279 · 5 ROOM | S$3,150 | — |
| Mar 2025 | Blk 293 · 3 ROOM | S$3,088 | — |
| Mar 2025 | Blk 295 · 3 ROOM | S$3,000 | — |
| Mar 2025 | Blk 280 · 4 ROOM | S$3,000 | — |
| Mar 2025 | Blk 296 · 3 ROOM | S$2,950 | — |
| Mar 2025 | Blk 272 · 4 ROOM | S$2,800 | — |
| Mar 2025 | Blk 299A · 2 ROOM | S$2,600 | — |
| Feb 2025 | Blk 273 · 4 ROOM | S$4,000 | — |
| Feb 2025 | Blk 284 · 4 ROOM | S$3,600 | — |
| Feb 2025 | Blk 283 · 4 ROOM | S$3,200 | — |
| Feb 2025 | Blk 287 · 3 ROOM | S$3,200 | — |
| Feb 2025 | Blk 283 · 3 ROOM | S$3,000 | — |
| Feb 2025 | Blk 276 · 3 ROOM | S$3,000 | — |
| Feb 2025 | Blk 272 · 3 ROOM | S$2,900 | — |
| Feb 2025 | Blk 274 · 3 ROOM | S$2,700 | — |
| Feb 2025 | Blk 291 · 3 ROOM | S$2,500 | — |
| Jan 2025 | Blk 293 · 4 ROOM | S$3,300 | — |
| Jan 2025 | Blk 284 · 3 ROOM | S$3,100 | — |
| Jan 2025 | Blk 293 · 3 ROOM | S$3,000 | — |
| Dec 2024 | Blk 272 · 4 ROOM | S$3,700 | — |
| Dec 2024 | Blk 277 · 4 ROOM | S$3,500 | — |
| Dec 2024 | Blk 293 · 4 ROOM | S$3,300 | — |
| Dec 2024 | Blk 287 · 4 ROOM | S$3,300 | — |
| Dec 2024 | Blk 297 · 4 ROOM | S$3,100 | — |
| Dec 2024 | Blk 277 · 3 ROOM | S$2,900 | — |
| Dec 2024 | Blk 275 · 3 ROOM | S$2,800 | — |
| Dec 2024 | Blk 272 · 3 ROOM | S$2,800 | — |
| Dec 2024 | Blk 272 · 3 ROOM | S$2,700 | — |
| Dec 2024 | Blk 283 · 3 ROOM | S$2,600 | — |
| Dec 2024 | Blk 274 · 3 ROOM | S$2,000 | — |
| Nov 2024 | Blk 278 · 5 ROOM | S$4,050 | — |
| Nov 2024 | Blk 293 · 4 ROOM | S$3,700 | — |
| Nov 2024 | Blk 293 · 4 ROOM | S$3,500 | — |
| Nov 2024 | Blk 286 · 4 ROOM | S$3,450 | — |
| Nov 2024 | Blk 289 · 5 ROOM | S$3,400 | — |
| Nov 2024 | Blk 283 · 4 ROOM | S$3,300 | — |
| Nov 2024 | Blk 275 · 3 ROOM | S$2,800 | — |
| Nov 2024 | Blk 283 · 4 ROOM | S$2,500 | — |
| Nov 2024 | Blk 277 · 3 ROOM | S$2,500 | — |
| Oct 2024 | Blk 273 · 4 ROOM | S$3,700 | — |
| Oct 2024 | Blk 296 · 4 ROOM | S$3,700 | — |
| Oct 2024 | Blk 286 · 4 ROOM | S$3,500 | — |
| Oct 2024 | Blk 272 · 4 ROOM | S$3,050 | — |
| Oct 2024 | Blk 281 · 3 ROOM | S$3,000 | — |
| Oct 2024 | Blk 295 · 4 ROOM | S$3,000 | — |
| Oct 2024 | Blk 272 · 3 ROOM | S$3,000 | — |
| Oct 2024 | Blk 275 · 3 ROOM | S$2,850 | — |
| Oct 2024 | Blk 283 · 3 ROOM | S$2,100 | — |
| Oct 2024 | Blk 285 · 3 ROOM | S$1,900 | — |
| Sept 2024 | Blk 272 · 4 ROOM | S$3,850 | — |
| Sept 2024 | Blk 285 · 4 ROOM | S$3,500 | — |
| Sept 2024 | Blk 295 · 3 ROOM | S$2,900 | — |
| Sept 2024 | Blk 281 · 3 ROOM | S$2,800 | — |
| Sept 2024 | Blk 291 · 3 ROOM | S$2,700 | — |
| Sept 2024 | Blk 283 · 3 ROOM | S$2,700 | — |
| Sept 2024 | Blk 290 · 3 ROOM | S$2,650 | — |
| Sept 2024 | Blk 297 · 3 ROOM | S$2,600 | — |
| Sept 2024 | Blk 284 · 4 ROOM | S$2,400 | — |
| Aug 2024 | Blk 281 · 4 ROOM | S$3,400 | — |
| Aug 2024 | Blk 296 · 4 ROOM | S$3,400 | — |
| Aug 2024 | Blk 277 · 4 ROOM | S$3,400 | — |
| Aug 2024 | Blk 275 · 3 ROOM | S$3,400 | — |
| Aug 2024 | Blk 285 · 4 ROOM | S$3,300 | — |
| Aug 2024 | Blk 293 · 3 ROOM | S$3,250 | — |
| Aug 2024 | Blk 283 · 4 ROOM | S$3,200 | — |
| Aug 2024 | Blk 283 · 4 ROOM | S$3,000 | — |
| Aug 2024 | Blk 293 · 3 ROOM | S$3,000 | — |
| Aug 2024 | Blk 272 · 3 ROOM | S$2,950 | — |
| Aug 2024 | Blk 299A · 3 ROOM | S$2,900 | — |
| Aug 2024 | Blk 272 · 4 ROOM | S$2,700 | — |
| Aug 2024 | Blk 287 · 4 ROOM | S$2,300 | — |
| Aug 2024 | Blk 296 · 3 ROOM | S$2,200 | — |
| Jul 2024 | Blk 289 · 5 ROOM | S$4,000 | — |
| Jul 2024 | Blk 294 · 5 ROOM | S$3,700 | — |
| Jul 2024 | Blk 288 · 4 ROOM | S$3,700 | — |
| Jul 2024 | Blk 281 · 4 ROOM | S$3,450 | — |
| Jul 2024 | Blk 297 · 4 ROOM | S$3,300 | — |
| Jul 2024 | Blk 295 · 4 ROOM | S$3,300 | — |
| Jul 2024 | Blk 283 · 4 ROOM | S$3,200 | — |
| Jul 2024 | Blk 274 · 3 ROOM | S$3,000 | — |
| Jul 2024 | Blk 296 · 3 ROOM | S$2,600 | — |
| Jul 2024 | Blk 294 · 4 ROOM | S$2,300 | — |
| Jul 2024 | Blk 285 · 3 ROOM | S$2,000 | — |
| Jun 2024 | Blk 285 · 4 ROOM | S$3,900 | — |
| Jun 2024 | Blk 272 · 4 ROOM | S$3,200 | — |
| Jun 2024 | Blk 289 · 5 ROOM | S$3,200 | — |
| Jun 2024 | Blk 285 · 4 ROOM | S$2,800 | — |
| Jun 2024 | Blk 283 · 4 ROOM | S$2,400 | — |
| May 2024 | Blk 294 · 4 ROOM | S$3,500 | — |
| May 2024 | Blk 277 · 3 ROOM | S$3,250 | — |
| May 2024 | Blk 285 · 3 ROOM | S$3,050 | — |
| May 2024 | Blk 297 · 4 ROOM | S$3,000 | — |
| May 2024 | Blk 283 · 3 ROOM | S$3,000 | — |
| May 2024 | Blk 277 · 3 ROOM | S$3,000 | — |
| May 2024 | Blk 273 · 3 ROOM | S$2,750 | — |
| May 2024 | Blk 299A · 2 ROOM | S$2,700 | — |
| May 2024 | Blk 286 · 3 ROOM | S$2,500 | — |
| May 2024 | Blk 285 · 3 ROOM | S$2,400 | — |
| May 2024 | Blk 299A · 2 ROOM | S$2,300 | — |
| May 2024 | Blk 282 · 3 ROOM | S$1,900 | — |
| Apr 2024 | Blk 283 · 4 ROOM | S$3,200 | — |
| Apr 2024 | Blk 280 · 4 ROOM | S$3,000 | — |
| Apr 2024 | Blk 293 · 3 ROOM | S$2,500 | — |
| Apr 2024 | Blk 285 · 4 ROOM | S$900 | — |
| Mar 2024 | Blk 288 · 5 ROOM | S$3,950 | — |
| Mar 2024 | Blk 284 · 4 ROOM | S$3,600 | — |
| Mar 2024 | Blk 274 · 4 ROOM | S$3,600 | — |
| Mar 2024 | Blk 297 · 4 ROOM | S$3,500 | — |
| Mar 2024 | Blk 282 · 4 ROOM | S$3,300 | — |
| Mar 2024 | Blk 290 · 3 ROOM | S$2,800 | — |
| Mar 2024 | Blk 296 · 3 ROOM | S$2,600 | — |
| Mar 2024 | Blk 272 · 3 ROOM | S$2,400 | — |
| Mar 2024 | Blk 287 · 3 ROOM | S$2,150 | — |
| Mar 2024 | Blk 284 · 3 ROOM | S$1,500 | — |
| Feb 2024 | Blk 288 · 5 ROOM | S$4,200 | — |
Showing 300 of 689.
Rents as approved by HDB, or as filed with URA for private homes, where the floor area is given as a band.
4-Room resale prices in Tampines
Embed these figures on your site
Free to use with the link intact. The card updates when the data does.