Lor 1 Toa Payoh — recent transacted prices and indicative value
99-year lease · 39.2 years remaining · 48 addresses
Lor 1 Toa Payoh has 39.2 years of lease remaining. Latest recorded sale 1 Oct 2026.
The median price at Lor 1 Toa Payoh over the last 12 months was S$6,061 psm, from 129 recorded sales between Dec 2025 and Oct 2026, with most between S$5,462 psm and S$8,594 psm. This is an indicative figure from recorded transactions, not a formal valuation.
From 129 sales between Dec 2025 and Oct 2026 · 25th to 75th percentile S$5,462 psm to S$8,594 psmLatest recorded sale 1 Oct 2026
How has the price at Lor 1 Toa Payoh changed?
The median price at Lor 1 Toa Payoh has risen 16.4% from S$4,834 psm in Q1 2017 to S$5,627 psm in Q4 2026. This reflects recorded transactions and is not a formal valuation.
How accurate is this estimate for Lor 1 Toa Payoh?
We re-ran the estimate as of Q1 2026 on what was known at the time, then compared it with the 115 sales in Lor 1 Toa Payoh since.
- Median error
- 5.3%
Half the estimates came closer than this to what the home actually fetched, half missed by more.
Value a unit here
Starts with this address. Type another address or postal code in this project to value that one.
Primary schools within 1 km of Lor 1 Toa Payoh
Measured from each school's land to this project's buildings, the way MOE bands P1 priority. MOE measures to the building's outline, so near 1 km check OneMap's School Query.
- CHIJ Primary (Toa Payoh) (girls) · 16 m · 43 of 48 buildings within 1 km · near the line — check on OneMap
- Kheng Cheng School · 149 m
- First Toa Payoh Primary School · 310 m · 11 of 48 buildings within 1 km · near the line — check on OneMap
- Marymount Convent School (girls) · 315 m · 34 of 48 buildings within 1 km · near the line — check on OneMap
What does a unit at Lor 1 Toa Payoh rent for?
A flat like this at Lor 1 Toa Payoh rents for about S$3,000 a month, the middle of 192 HDB rental approvals in the last year. That is a gross yield of 9.44% on the indicative value. Indicative, from recorded rents.
What this flat earns against what it costs, set beside what homes like it earn.
9.44% gross yield
S$36,000 of rent a year against the estimate above · 0.3 points below flats like it
Homes like this rent for about S$3,000 a month, the middle of 192 approvals in the last year.
In Toa Payoh, flats of this type with 40 to 49 years of lease left yield 9.74%, from 41 blocks.
A yield above the mark means the flat rents well for what it costs, which can point to a keen rental patch or a price the sales alone have not caught up with. Below it, buyers are paying for something a tenant will not, such as the address itself.
Recent rental approvals used
| Approved | Block | Flat | Rent a month |
|---|---|---|---|
| Sept 2026 | 131A | 3 ROOM | S$3,600 |
| Sept 2026 | 111 | 3 ROOM | S$3,500 |
| Sept 2026 | 158 | 3 ROOM | S$3,300 |
| Sept 2026 | 110 | 3 ROOM | S$3,200 |
| Sept 2026 | 158 | 3 ROOM | S$3,200 |
| Sept 2026 | 113 | 3 ROOM | S$3,150 |
| Sept 2026 | 157 | 3 ROOM | S$3,000 |
| Sept 2026 | 128 | 3 ROOM | S$2,900 |
median of 192 HDB rental approvals for 3 ROOM on Lor 1 Toa Payoh since 2025-11.
Get new sales by email
We'll email you when a new sale is filed at Lor 1 Toa Payoh. At most one email a week for this project, and only when something sold.
We use your address only to send this alert, and nothing else. Unsubscribe in one click from any email.
What flat types sell at Lor 1 Toa Payoh?
- 2 ROOM37 sales
- 3 ROOM899 sales
- 4 ROOM229 sales
- 5 ROOM80 sales
- EXECUTIVE46 sales
Blocks in Lor 1 Toa Payoh
- Blk 100 Lor 1 Toa Payoh
- Blk 107 Lor 1 Toa Payoh
- Blk 108 Lor 1 Toa Payoh
- Blk 109 Lor 1 Toa Payoh
- Blk 110 Lor 1 Toa Payoh
- Blk 111 Lor 1 Toa Payoh
- Blk 112 Lor 1 Toa Payoh
- Blk 113 Lor 1 Toa Payoh
- Blk 114 Lor 1 Toa Payoh
- Blk 115 Lor 1 Toa Payoh
- Blk 117 Lor 1 Toa Payoh
- Blk 118 Lor 1 Toa Payoh
- Blk 119 Lor 1 Toa Payoh
- Blk 123 Lor 1 Toa Payoh
- Blk 124 Lor 1 Toa Payoh
- Blk 125 Lor 1 Toa Payoh
- Blk 126 Lor 1 Toa Payoh
- Blk 128 Lor 1 Toa Payoh
- Blk 130A Lor 1 Toa Payoh
- Blk 130B Lor 1 Toa Payoh
- Blk 131A Lor 1 Toa Payoh
- Blk 131B Lor 1 Toa Payoh
- Blk 153A Lor 1 Toa Payoh
- Blk 155 Lor 1 Toa Payoh
- Blk 156 Lor 1 Toa Payoh
- Blk 157 Lor 1 Toa Payoh
- Blk 158 Lor 1 Toa Payoh
- Blk 159 Lor 1 Toa Payoh
- Blk 160 Lor 1 Toa Payoh
- Blk 161 Lor 1 Toa Payoh
- Blk 163 Lor 1 Toa Payoh
- Blk 168 Lor 1 Toa Payoh
- Blk 169 Lor 1 Toa Payoh
- Blk 171 Lor 1 Toa Payoh
- Blk 172 Lor 1 Toa Payoh
- Blk 172A Lor 1 Toa Payoh
- Blk 173 Lor 1 Toa Payoh
- Blk 174 Lor 1 Toa Payoh
- Blk 236 Lor 1 Toa Payoh
- Blk 237 Lor 1 Toa Payoh
- Blk 238 Lor 1 Toa Payoh
- Blk 239 Lor 1 Toa Payoh
- Blk 240 Lor 1 Toa Payoh
- Blk 402A Lor 1 Toa Payoh
- Blk 402B Lor 1 Toa Payoh
- Blk 403A Lor 1 Toa Payoh
- Blk 403B Lor 1 Toa Payoh
- Blk 98 Lor 1 Toa Payoh
Nearest projects
- Lor 2 Toa Payoh · 425 m · 726 sales
- Ah Hood Rd · 463 m · 42 sales
- Jln Dusun · 466 m · 42 sales
- Lor 1a Toa Payoh · 469 m · 566 sales
- Toa Payoh Ctrl · 701 m · 381 sales
Buying or selling here?
Buying: Stamp duty · Cash and CPF needed · How much can I borrow · Monthly repayment.
Selling: Net proceeds from selling.
What has sold at Lor 1 Toa Payoh recently?
| Date | Detail | Area | Price | Per area |
|---|---|---|---|---|
| Oct 2026 | Blk 98 · 3 ROOM · 13 TO 15 · Improved · 42 years left | 68 sqm | S$352,000 | S$5,176 psm |
| Oct 2026 | Blk 108 · 3 ROOM · 04 TO 06 · Improved · 42 years left | 66 sqm | S$348,000 | S$5,273 psm |
| Oct 2026 | Blk 113 · 3 ROOM · 01 TO 03 · Improved · 40 years left | 65 sqm | S$340,000 | S$5,231 psm |
| Oct 2026 | Blk 107 · 3 ROOM · 07 TO 09 · Improved · 42 years left | 67 sqm | S$377,000 | S$5,627 psm |
| Oct 2026 | Blk 171 · 5 ROOM · 10 TO 12 · Improved · 68 years left | 123 sqm | S$1,078,000 | S$8,764 psm |
| Oct 2026 | Blk 130A · 3 ROOM · 28 TO 30 · Model A · 91 years left | 68 sqm | S$858,000 | S$12,618 psm |
| Oct 2026 | Blk 168 · 3 ROOM · 10 TO 12 · Improved · 45 years left | 65 sqm | S$380,000 | S$5,846 psm |
| Oct 2026 | Blk 119 · 3 ROOM · 01 TO 03 · Improved · 41 years left | 65 sqm | S$320,000 | S$4,923 psm |
| Oct 2026 | Blk 237 · EXECUTIVE · 04 TO 06 · Maisonette · 59 years left | 146 sqm | S$920,000 | S$6,301 psm |
| Oct 2026 | Blk 98 · 3 ROOM · 01 TO 03 · Improved · 42 years left | 68 sqm | S$340,000 | S$5,000 psm |
| Oct 2026 | Blk 100 · 3 ROOM · 01 TO 03 · Improved · 42 years left excluded: outlier | 68 sqm | S$288,000 | S$4,235 psm |
| Oct 2026 | Blk 158 · 3 ROOM · 10 TO 12 · Improved · 44 years left | 76 sqm | S$428,000 | S$5,632 psm |
| Oct 2026 | Blk 157 · 3 ROOM · 04 TO 06 · Improved · 44 years left | 77 sqm | S$415,888 | S$5,401 psm |
| Oct 2026 | Blk 173 · 3 ROOM · 10 TO 12 · Improved · 45 years left | 66 sqm | S$362,000 | S$5,485 psm |
| Oct 2026 | Blk 240 · EXECUTIVE · 01 TO 03 · Maisonette · 59 years left | 146 sqm | S$970,000 | S$6,644 psm |
| Oct 2026 | Blk 156 · 4 ROOM · 16 TO 18 · Model A · 71 years left | 101 sqm | S$790,000 | S$7,822 psm |
| Sept 2026 | Blk 174 · 5 ROOM · 10 TO 12 · Adjoined flat · 45 years left | 151 sqm | S$935,000 | S$6,192 psm |
| Sept 2026 | Blk 238 · 5 ROOM · 19 TO 21 · Improved · 59 years left | 120 sqm | S$878,000 | S$7,317 psm |
| Sept 2026 | Blk 239 · 5 ROOM · 04 TO 06 · Improved · 59 years left excluded: outlier | 120 sqm | S$790,000 | S$6,583 psm |
| Sept 2026 | Blk 118 · 3 ROOM · 01 TO 03 · Improved · 41 years left | 65 sqm | S$360,000 | S$5,538 psm |
| Sept 2026 | Blk 157 · 5 ROOM · 07 TO 09 · Adjoined flat · 44 years left | 134 sqm | S$980,000 | S$7,313 psm |
| Sept 2026 | Blk 130A · 4 ROOM · 31 TO 33 · Model A · 91 years left | 93 sqm | S$1,150,000 | S$12,366 psm |
| Sept 2026 | Blk 128 · 3 ROOM · 04 TO 06 · Improved · 42 years left | 67 sqm | S$356,666 | S$5,323 psm |
| Sept 2026 | Blk 238 · 5 ROOM · 19 TO 21 · Improved · 59 years left | 120 sqm | S$910,800 | S$7,590 psm |
| Sept 2026 | Blk 171 · 5 ROOM · 01 TO 03 · Improved · 68 years left | 123 sqm | S$950,000 | S$7,724 psm |
| Sept 2026 | Blk 239 · 4 ROOM · 19 TO 21 · Model A · 59 years left | 103 sqm | S$810,000 | S$7,864 psm |
| Sept 2026 | Blk 130A · 4 ROOM · 22 TO 24 · Model A · 91 years left | 93 sqm | S$1,140,000 | S$12,258 psm |
| Sept 2026 | Blk 128 · 3 ROOM · 04 TO 06 · Improved · 42 years left | 67 sqm | S$340,000 | S$5,075 psm |
| Sept 2026 | Blk 125 · 3 ROOM · 07 TO 09 · Improved · 42 years left | 67 sqm | S$395,000 | S$5,896 psm |
| Sept 2026 | Blk 115 · 3 ROOM · 04 TO 06 · Improved · 40 years left | 65 sqm | S$340,000 | S$5,231 psm |
| Aug 2026 | Blk 238 · 5 ROOM · 19 TO 21 · Improved · 59 years left | 120 sqm | S$820,000 | S$6,833 psm |
| Aug 2026 | Blk 239 · 5 ROOM · 07 TO 09 · Improved · 59 years left | 123 sqm | S$892,000 | S$7,252 psm |
| Aug 2026 | Blk 130B · 4 ROOM · 19 TO 21 · Model A · 91 years left | 93 sqm | S$1,160,000 | S$12,473 psm |
| Aug 2026 | Blk 156 · 4 ROOM · 10 TO 12 · Model A · 72 years left | 101 sqm | S$900,000 | S$8,911 psm |
| Aug 2026 | Blk 157 · 3 ROOM · 07 TO 09 · Improved · 44 years left | 67 sqm | S$338,000 | S$5,045 psm |
| Aug 2026 | Blk 130B · 3 ROOM · 19 TO 21 · Model A · 91 years left | 68 sqm | S$852,000 | S$12,529 psm |
| Aug 2026 | Blk 118 · 3 ROOM · 04 TO 06 · Improved · 41 years left | 65 sqm | S$350,000 | S$5,385 psm |
| Aug 2026 | Blk 131B · 3 ROOM · 01 TO 03 · Model A · 91 years left | 68 sqm | S$740,000 | S$10,882 psm |
| Aug 2026 | Blk 125 · 3 ROOM · 04 TO 06 · Improved · 43 years left | 67 sqm | S$335,000 | S$5,000 psm |
| Aug 2026 | Blk 161 · 2 ROOM · 01 TO 03 · Improved · 45 years left | 40 sqm | S$282,000 | S$7,050 psm |
| Jul 2026 | Blk 171 · 5 ROOM · 16 TO 18 · Improved · 68 years left | 124 sqm | S$1,060,000 | S$8,548 psm |
| Jul 2026 | Blk 238 · 5 ROOM · 01 TO 03 · Improved · 59 years left | 120 sqm | S$828,200 | S$6,902 psm |
| Jul 2026 | Blk 238 · 5 ROOM · 10 TO 12 · Improved · 59 years left | 120 sqm | S$910,000 | S$7,583 psm |
| Jul 2026 | Blk 130B · 4 ROOM · 04 TO 06 · Model A · 91 years left excluded: outlier | 93 sqm | S$945,000 | S$10,161 psm |
| Jul 2026 | Blk 155 · 4 ROOM · 04 TO 06 · Model A · 72 years left | 101 sqm | S$868,000 | S$8,594 psm |
| Jul 2026 | Blk 130A · 3 ROOM · 37 TO 39 · Model A · 91 years left | 68 sqm | S$890,000 | S$13,088 psm |
| Jul 2026 | Blk 174 · 3 ROOM · 04 TO 06 · Improved · 45 years left | 65 sqm | S$335,000 | S$5,154 psm |
| Jul 2026 | Blk 131B · 3 ROOM · 07 TO 09 · Model A · 91 years left | 68 sqm | S$785,000 | S$11,544 psm |
| Jul 2026 | Blk 115 · 3 ROOM · 04 TO 06 · Improved · 40 years left | 65 sqm | S$375,000 | S$5,769 psm |
| Jul 2026 | Blk 125 · 3 ROOM · 04 TO 06 · Improved · 43 years left | 67 sqm | S$343,000 | S$5,119 psm |
| Jul 2026 | Blk 168 · 3 ROOM · 04 TO 06 · Improved · 45 years left | 65 sqm | S$318,888 | S$4,906 psm |
| Jul 2026 | Blk 117 · 3 ROOM · 07 TO 09 · Improved · 41 years left | 65 sqm | S$370,000 | S$5,692 psm |
| Jul 2026 | Blk 124 · 3 ROOM · 07 TO 09 · Improved · 43 years left | 79 sqm | S$400,000 | S$5,063 psm |
| Jul 2026 | Blk 159 · 3 ROOM · 04 TO 06 · Improved · 45 years left | 65 sqm | S$360,000 | S$5,538 psm |
| Jul 2026 | Blk 161 · 2 ROOM · 04 TO 06 · Improved · 45 years left | 41 sqm | S$290,000 | S$7,073 psm |
| Jun 2026 | Blk 236 · EXECUTIVE · 04 TO 06 · Maisonette · 59 years left | 146 sqm | S$980,000 | S$6,712 psm |
| Jun 2026 | Blk 172 · 5 ROOM · 22 TO 24 · Improved · 68 years left | 124 sqm | S$1,020,000 | S$8,226 psm |
| Jun 2026 | Blk 130B · 4 ROOM · 01 TO 03 · Model A · 91 years left excluded: outlier | 93 sqm | S$820,000 | S$8,817 psm |
| Jun 2026 | Blk 130B · 4 ROOM · 01 TO 03 · Model A · 91 years left | 93 sqm | S$1,020,000 | S$10,968 psm |
| Jun 2026 | Blk 112 · 3 ROOM · 07 TO 09 · Improved · 40 years left | 65 sqm | S$350,000 | S$5,385 psm |
| Jun 2026 | Blk 125 · 3 ROOM · 04 TO 06 · Improved · 43 years left | 67 sqm | S$330,000 | S$4,925 psm |
| Jun 2026 | Blk 131B · 3 ROOM · 22 TO 24 · Model A · 91 years left | 68 sqm | S$854,000 | S$12,559 psm |
| Jun 2026 | Blk 130A · 3 ROOM · 31 TO 33 · Model A · 91 years left | 68 sqm | S$830,000 | S$12,206 psm |
| Jun 2026 | Blk 123 · 3 ROOM · 04 TO 06 · Improved · 43 years left | 67 sqm | S$330,000 | S$4,925 psm |
| Jun 2026 | Blk 126 · 3 ROOM · 04 TO 06 · Improved · 43 years left | 67 sqm | S$370,000 | S$5,522 psm |
| Jun 2026 | Blk 157 · 3 ROOM · 04 TO 06 · Improved · 44 years left | 67 sqm | S$360,000 | S$5,373 psm |
| Jun 2026 | Blk 111 · 3 ROOM · 01 TO 03 · Improved · 43 years left | 66 sqm | S$378,888 | S$5,741 psm |
| May 2026 | Blk 239 · 5 ROOM · 19 TO 21 · Improved · 59 years left | 120 sqm | S$913,800 | S$7,615 psm |
| May 2026 | Blk 130B · 4 ROOM · 34 TO 36 · Model A · 91 years left | 93 sqm | S$1,182,889 | S$12,719 psm |
| May 2026 | Blk 130A · 4 ROOM · 37 TO 39 · Model A · 91 years left | 93 sqm | S$1,200,000 | S$12,903 psm |
| May 2026 | Blk 156 · 4 ROOM · 16 TO 18 · Model A · 72 years left | 101 sqm | S$894,000 | S$8,851 psm |
| May 2026 | Blk 157 · 3 ROOM · 04 TO 06 · Improved · 44 years left | 67 sqm | S$370,000 | S$5,522 psm |
| May 2026 | Blk 112 · 3 ROOM · 01 TO 03 · Improved · 40 years left | 65 sqm | S$345,000 | S$5,308 psm |
| May 2026 | Blk 114 · 3 ROOM · 01 TO 03 · Improved · 40 years left | 65 sqm | S$355,000 | S$5,462 psm |
| May 2026 | Blk 173 · 3 ROOM · 01 TO 03 · Improved · 45 years left | 66 sqm | S$338,000 | S$5,121 psm |
| May 2026 | Blk 157 · 3 ROOM · 04 TO 06 · Improved · 44 years left | 67 sqm | S$365,000 | S$5,448 psm |
| May 2026 | Blk 163 · 3 ROOM · 04 TO 06 · Improved · 45 years left | 65 sqm | S$368,888 | S$5,675 psm |
| May 2026 | Blk 109 · 3 ROOM · 10 TO 12 · Improved · 43 years left | 66 sqm | S$415,000 | S$6,288 psm |
| May 2026 | Blk 111 · 3 ROOM · 07 TO 09 · Improved · 43 years left | 66 sqm | S$400,000 | S$6,061 psm |
| Apr 2026 | Blk 130A · 4 ROOM · 07 TO 09 · Model A · 91 years left | 93 sqm | S$1,075,000 | S$11,559 psm |
| Apr 2026 | Blk 169 · 3 ROOM · 07 TO 09 · Improved · 45 years left | 65 sqm | S$388,000 | S$5,969 psm |
| Apr 2026 | Blk 159 · 3 ROOM · 07 TO 09 · Improved · 45 years left | 65 sqm | S$375,000 | S$5,769 psm |
| Apr 2026 | Blk 125 · 3 ROOM · 10 TO 12 · Improved · 43 years left | 67 sqm | S$375,000 | S$5,597 psm |
| Apr 2026 | Blk 123 · 3 ROOM · 04 TO 06 · Improved · 43 years left | 79 sqm | S$420,000 | S$5,316 psm |
| Apr 2026 | Blk 111 · 3 ROOM · 10 TO 12 · Improved · 43 years left | 66 sqm | S$400,000 | S$6,061 psm |
| Apr 2026 | Blk 131B · 3 ROOM · 10 TO 12 · Model A · 91 years left | 68 sqm | S$770,000 | S$11,324 psm |
| Apr 2026 | Blk 115 · 3 ROOM · 04 TO 06 · Improved · 40 years left | 65 sqm | S$345,000 | S$5,308 psm |
| Apr 2026 | Blk 168 · 3 ROOM · 07 TO 09 · Improved · 45 years left | 65 sqm | S$372,500 | S$5,731 psm |
| Mar 2026 | Blk 153A · 5 ROOM · 10 TO 12 · Improved · 72 years left | 124 sqm | S$1,180,000 | S$9,516 psm |
| Mar 2026 | Blk 172 · 5 ROOM · 10 TO 12 · Improved · 68 years left | 123 sqm | S$1,035,000 | S$8,415 psm |
| Mar 2026 | Blk 130B · 4 ROOM · 28 TO 30 · Model A · 92 years left | 93 sqm | S$1,168,000 | S$12,559 psm |
| Mar 2026 | Blk 130B · 4 ROOM · 16 TO 18 · Model A · 92 years left | 93 sqm | S$1,130,000 | S$12,151 psm |
| Mar 2026 | Blk 114 · 3 ROOM · 04 TO 06 · Improved · 40 years left | 65 sqm | S$355,000 | S$5,462 psm |
| Mar 2026 | Blk 124 · 3 ROOM · 04 TO 06 · Improved · 43 years left | 67 sqm | S$400,000 | S$5,970 psm |
| Mar 2026 | Blk 118 · 3 ROOM · 10 TO 12 · Improved · 41 years left | 65 sqm | S$390,000 | S$6,000 psm |
| Mar 2026 | Blk 159 · 3 ROOM · 10 TO 12 · Improved · 45 years left | 65 sqm | S$406,888 | S$6,260 psm |
| Mar 2026 | Blk 109 · 3 ROOM · 10 TO 12 · Improved · 43 years left | 66 sqm | S$409,000 | S$6,197 psm |
| Mar 2026 | Blk 158 · 3 ROOM · 01 TO 03 · Improved · 45 years left | 65 sqm | S$370,000 | S$5,692 psm |
| Mar 2026 | Blk 100 · 3 ROOM · 01 TO 03 · Improved · 43 years left | 78 sqm | S$440,000 | S$5,641 psm |
| Mar 2026 | Blk 168 · 3 ROOM · 07 TO 09 · Improved · 45 years left | 65 sqm | S$370,000 | S$5,692 psm |
| Mar 2026 | Blk 173 · 3 ROOM · 07 TO 09 · Improved · 45 years left | 66 sqm | S$345,000 | S$5,227 psm |
| Feb 2026 | Blk 118 · 5 ROOM · 07 TO 09 · Adjoined flat · 41 years left | 130 sqm | S$800,000 | S$6,154 psm |
| Feb 2026 | Blk 130B · 4 ROOM · 28 TO 30 · Model A · 92 years left | 93 sqm | S$1,186,000 | S$12,753 psm |
| Feb 2026 | Blk 131A · 4 ROOM · 28 TO 30 · Model A · 92 years left | 93 sqm | S$1,200,000 | S$12,903 psm |
| Feb 2026 | Blk 126 · 3 ROOM · 10 TO 12 · Improved · 43 years left | 67 sqm | S$415,000 | S$6,194 psm |
| Feb 2026 | Blk 112 · 3 ROOM · 04 TO 06 · Improved · 40 years left | 65 sqm | S$418,000 | S$6,431 psm |
| Feb 2026 | Blk 110 · 3 ROOM · 04 TO 06 · Improved · 40 years left | 65 sqm | S$355,000 | S$5,462 psm |
| Feb 2026 | Blk 110 · 3 ROOM · 07 TO 09 · Improved · 40 years left | 65 sqm | S$370,000 | S$5,692 psm |
| Feb 2026 | Blk 125 · 3 ROOM · 07 TO 09 · Improved · 43 years left | 67 sqm | S$343,000 | S$5,119 psm |
| Jan 2026 | Blk 130B · 4 ROOM · 07 TO 09 · Model A · 92 years left | 93 sqm | S$1,098,000 | S$11,806 psm |
| Jan 2026 | Blk 171 · 4 ROOM · 01 TO 03 · Model A · 68 years left excluded: outlier | 104 sqm | S$715,000 | S$6,875 psm |
| Jan 2026 | Blk 155 · 4 ROOM · 19 TO 21 · Model A · 73 years left | 100 sqm | S$943,888 | S$9,439 psm |
| Jan 2026 | Blk 239 · 4 ROOM · 22 TO 24 · Model A · 60 years left | 103 sqm | S$700,000 | S$6,796 psm |
| Jan 2026 | Blk 130B · 4 ROOM · 19 TO 21 · Model A · 92 years left | 93 sqm | S$1,110,000 | S$11,935 psm |
| Jan 2026 | Blk 98 · 3 ROOM · 16 TO 18 · Improved · 43 years left | 68 sqm | S$385,000 | S$5,662 psm |
| Jan 2026 | Blk 115 · 3 ROOM · 04 TO 06 · Improved · 41 years left | 65 sqm | S$340,000 | S$5,231 psm |
| Jan 2026 | Blk 173 · 3 ROOM · 01 TO 03 · Improved · 46 years left excluded: outlier | 66 sqm | S$320,000 | S$4,848 psm |
| Jan 2026 | Blk 159 · 3 ROOM · 04 TO 06 · Improved · 45 years left | 65 sqm | S$365,000 | S$5,615 psm |
| Jan 2026 | Blk 113 · 3 ROOM · 04 TO 06 · Improved · 41 years left | 65 sqm | S$375,000 | S$5,769 psm |
| Jan 2026 | Blk 112 · 3 ROOM · 01 TO 03 · Improved · 41 years left | 65 sqm | S$343,000 | S$5,277 psm |
| Jan 2026 | Blk 114 · 3 ROOM · 07 TO 09 · Improved · 41 years left | 65 sqm | S$330,000 | S$5,077 psm |
| Jan 2026 | Blk 131B · 3 ROOM · 25 TO 27 · Model A · 92 years left | 68 sqm | S$865,000 | S$12,721 psm |
| Jan 2026 | Blk 130A · 3 ROOM · 04 TO 06 · Model A · 92 years left excluded: outlier | 68 sqm | S$720,000 | S$10,588 psm |
| Jan 2026 | Blk 131A · 3 ROOM · 31 TO 33 · Model A · 92 years left | 68 sqm | S$868,000 | S$12,765 psm |
| Jan 2026 | Blk 118 · 3 ROOM · 07 TO 09 · Improved · 42 years left | 65 sqm | S$400,000 | S$6,154 psm |
| Dec 2025 | Blk 156 · 5 ROOM · 04 TO 06 · Improved · 72 years left | 118 sqm | S$1,038,888 | S$8,804 psm |
| Dec 2025 | Blk 130B · 4 ROOM · 22 TO 24 · Model A · 92 years left | 93 sqm | S$1,158,000 | S$12,452 psm |
| Dec 2025 | Blk 130B · 4 ROOM · 13 TO 15 · Model A · 92 years left | 93 sqm | S$1,113,000 | S$11,968 psm |
| Dec 2025 | Blk 130A · 4 ROOM · 22 TO 24 · Model A · 92 years left | 93 sqm | S$1,125,000 | S$12,097 psm |
| Dec 2025 | Blk 100 · 3 ROOM · 07 TO 09 · Improved · 43 years left | 68 sqm | S$372,000 | S$5,471 psm |
| Dec 2025 | Blk 159 · 3 ROOM · 04 TO 06 · Improved · 45 years left | 65 sqm | S$368,000 | S$5,662 psm |
| Dec 2025 | Blk 113 · 3 ROOM · 01 TO 03 · Improved · 41 years left | 65 sqm | S$340,000 | S$5,231 psm |
| Dec 2025 | Blk 110 · 3 ROOM · 04 TO 06 · Improved · 41 years left | 65 sqm | S$418,000 | S$6,431 psm |
| Dec 2025 | Blk 100 · 3 ROOM · 13 TO 15 · Improved · 43 years left | 68 sqm | S$391,888 | S$5,763 psm |
| Dec 2025 | Blk 168 · 3 ROOM · 07 TO 09 · Improved · 46 years left | 65 sqm | S$373,000 | S$5,738 psm |
| Dec 2025 | Blk 126 · 3 ROOM · 13 TO 15 · Improved · 43 years left | 67 sqm | S$410,000 | S$6,119 psm |
| Nov 2025 | Blk 130B · 4 ROOM · 40 TO 42 · Model A · 92 years left | 93 sqm | S$1,200,000 | S$12,903 psm |
| Nov 2025 | Blk 171 · 4 ROOM · 04 TO 06 · Model A · 69 years left | 105 sqm | S$789,000 | S$7,514 psm |
| Nov 2025 | Blk 131B · 4 ROOM · 13 TO 15 · Model A · 92 years left | 93 sqm | S$1,090,000 | S$11,720 psm |
| Nov 2025 | Blk 156 · 4 ROOM · 04 TO 06 · Model A · 72 years left | 101 sqm | S$896,000 | S$8,871 psm |
| Nov 2025 | Blk 130B · 4 ROOM · 16 TO 18 · Model A · 92 years left | 93 sqm | S$1,110,000 | S$11,935 psm |
| Nov 2025 | Blk 131B · 4 ROOM · 16 TO 18 · Model A · 92 years left | 93 sqm | S$1,130,000 | S$12,151 psm |
| Nov 2025 | Blk 158 · 3 ROOM · 04 TO 06 · Improved · 45 years left | 65 sqm | S$380,000 | S$5,846 psm |
| Nov 2025 | Blk 173 · 3 ROOM · 04 TO 06 · Improved · 46 years left | 66 sqm | S$380,000 | S$5,758 psm |
| Nov 2025 | Blk 111 · 3 ROOM · 07 TO 09 · Improved · 43 years left | 66 sqm | S$398,000 | S$6,030 psm |
| Nov 2025 | Blk 110 · 3 ROOM · 01 TO 03 · Improved · 41 years left | 65 sqm | S$400,000 | S$6,154 psm |
| Nov 2025 | Blk 173 · 3 ROOM · 10 TO 12 · Improved · 46 years left | 66 sqm | S$345,000 | S$5,227 psm |
| Nov 2025 | Blk 118 · 3 ROOM · 07 TO 09 · Improved · 42 years left | 65 sqm | S$400,000 | S$6,154 psm |
| Oct 2025 | Blk 169 · 3 ROOM · 04 TO 06 · Improved · 46 years left | 65 sqm | S$360,000 | S$5,538 psm |
| Oct 2025 | Blk 174 · 3 ROOM · 10 TO 12 · Improved · 46 years left | 65 sqm | S$358,000 | S$5,508 psm |
| Oct 2025 | Blk 118 · 3 ROOM · 04 TO 06 · Improved · 42 years left | 65 sqm | S$338,888 | S$5,214 psm |
| Oct 2025 | Blk 128 · 3 ROOM · 07 TO 09 · Improved · 43 years left | 67 sqm | S$388,000 | S$5,791 psm |
| Oct 2025 | Blk 174 · 3 ROOM · 07 TO 09 · Improved · 46 years left | 65 sqm | S$360,000 | S$5,538 psm |
| Oct 2025 | Blk 130B · 3 ROOM · 34 TO 36 · Model A · 92 years left | 68 sqm | S$830,000 | S$12,206 psm |
| Oct 2025 | Blk 100 · 3 ROOM · 07 TO 09 · Improved · 43 years left | 68 sqm | S$356,000 | S$5,235 psm |
| Oct 2025 | Blk 98 · 3 ROOM · 07 TO 09 · Improved · 43 years left | 68 sqm | S$405,000 | S$5,956 psm |
| Oct 2025 | Blk 117 · 3 ROOM · 01 TO 03 · Improved · 42 years left excluded: outlier | 64 sqm | S$310,000 | S$4,844 psm |
| Oct 2025 | Blk 124 · 3 ROOM · 04 TO 06 · Improved · 43 years left | 67 sqm | S$372,000 | S$5,552 psm |
| Sept 2025 | Blk 130B · 4 ROOM · 22 TO 24 · Model A · 92 years left | 93 sqm | S$1,160,888 | S$12,483 psm |
| Sept 2025 | Blk 156 · 4 ROOM · 16 TO 18 · Model A · 73 years left | 101 sqm | S$900,000 | S$8,911 psm |
| Sept 2025 | Blk 172 · 4 ROOM · 19 TO 21 · Model A · 69 years left | 109 sqm | S$840,000 | S$7,706 psm |
| Sept 2025 | Blk 130A · 4 ROOM · 25 TO 27 · Model A · 92 years left | 93 sqm | S$1,138,000 | S$12,237 psm |
| Sept 2025 | Blk 239 · 4 ROOM · 10 TO 12 · Model A · 60 years left | 103 sqm | S$782,000 | S$7,592 psm |
| Sept 2025 | Blk 118 · 3 ROOM · 01 TO 03 · Improved · 42 years left | 65 sqm | S$355,888 | S$5,475 psm |
| Sept 2025 | Blk 163 · 3 ROOM · 07 TO 09 · Improved · 46 years left | 65 sqm | S$420,000 | S$6,462 psm |
| Sept 2025 | Blk 126 · 3 ROOM · 13 TO 15 · Improved · 43 years left | 67 sqm | S$390,000 | S$5,821 psm |
| Sept 2025 | Blk 107 · 3 ROOM · 07 TO 09 · Improved · 43 years left | 67 sqm | S$385,000 | S$5,746 psm |
| Sept 2025 | Blk 157 · 3 ROOM · 07 TO 09 · Improved · 45 years left | 67 sqm | S$418,000 | S$6,239 psm |
| Sept 2025 | Blk 108 · 3 ROOM · 01 TO 03 · Improved · 43 years left | 66 sqm | S$369,000 | S$5,591 psm |
| Sept 2025 | Blk 157 · 3 ROOM · 01 TO 03 · Improved · 45 years left | 67 sqm | S$410,000 | S$6,119 psm |
| Sept 2025 | Blk 161 · 2 ROOM · 04 TO 06 · Improved · 45 years left | 41 sqm | S$280,000 | S$6,829 psm |
| Aug 2025 | Blk 155 · 4 ROOM · 07 TO 09 · Model A · 73 years left | 101 sqm | S$855,000 | S$8,465 psm |
| Aug 2025 | Blk 172A · 4 ROOM · 04 TO 06 · Model A · 69 years left excluded: outlier | 105 sqm | S$760,000 | S$7,238 psm |
| Aug 2025 | Blk 130A · 4 ROOM · 25 TO 27 · Model A · 92 years left | 93 sqm | S$1,168,888 | S$12,569 psm |
| Aug 2025 | Blk 130B · 4 ROOM · 28 TO 30 · Model A · 92 years left | 93 sqm | S$1,153,000 | S$12,398 psm |
| Aug 2025 | Blk 114 · 3 ROOM · 07 TO 09 · Improved · 41 years left | 65 sqm | S$355,000 | S$5,462 psm |
| Aug 2025 | Blk 126 · 3 ROOM · 13 TO 15 · Improved · 43 years left | 67 sqm | S$426,500 | S$6,366 psm |
| Aug 2025 | Blk 123 · 3 ROOM · 07 TO 09 · Improved · 43 years left | 67 sqm | S$415,000 | S$6,194 psm |
| Aug 2025 | Blk 115 · 3 ROOM · 07 TO 09 · Improved · 41 years left | 65 sqm | S$398,000 | S$6,123 psm |
| Aug 2025 | Blk 158 · 3 ROOM · 07 TO 09 · Improved · 45 years left | 65 sqm | S$410,888 | S$6,321 psm |
| Aug 2025 | Blk 163 · 3 ROOM · 07 TO 09 · Improved · 46 years left | 65 sqm | S$448,000 | S$6,892 psm |
| Aug 2025 | Blk 98 · 3 ROOM · 10 TO 12 · Improved · 43 years left | 68 sqm | S$425,000 | S$6,250 psm |
| Aug 2025 | Blk 98 · 3 ROOM · 01 TO 03 · Improved · 43 years left | 68 sqm | S$380,000 | S$5,588 psm |
| Aug 2025 | Blk 163 · 3 ROOM · 07 TO 09 · Improved · 46 years left | 76 sqm | S$435,000 | S$5,724 psm |
| Aug 2025 | Blk 173 · 3 ROOM · 01 TO 03 · Improved · 46 years left | 66 sqm | S$340,000 | S$5,152 psm |
| Aug 2025 | Blk 113 · 3 ROOM · 07 TO 09 · Improved · 41 years left | 65 sqm | S$397,000 | S$6,108 psm |
| Aug 2025 | Blk 159 · 3 ROOM · 07 TO 09 · Improved · 45 years left | 65 sqm | S$388,888 | S$5,983 psm |
| Jul 2025 | Blk 237 · EXECUTIVE · 01 TO 03 · Maisonette · 60 years left | 146 sqm | S$950,000 | S$6,507 psm |
| Jul 2025 | Blk 130B · 4 ROOM · 19 TO 21 · Model A · 92 years left | 93 sqm | S$1,101,888 | S$11,848 psm |
| Jul 2025 | Blk 130B · 4 ROOM · 34 TO 36 · Model A · 92 years left | 93 sqm | S$1,150,000 | S$12,366 psm |
| Jul 2025 | Blk 130B · 4 ROOM · 28 TO 30 · Model A · 92 years left | 93 sqm | S$1,165,000 | S$12,527 psm |
| Jul 2025 | Blk 130A · 4 ROOM · 07 TO 09 · Model A · 92 years left | 93 sqm | S$1,075,000 | S$11,559 psm |
| Jul 2025 | Blk 131A · 4 ROOM · 34 TO 36 · Model A · 92 years left | 93 sqm | S$1,190,000 | S$12,796 psm |
| Jul 2025 | Blk 130B · 4 ROOM · 13 TO 15 · Model A · 92 years left | 93 sqm | S$1,110,000 | S$11,935 psm |
| Jul 2025 | Blk 128 · 3 ROOM · 04 TO 06 · Improved · 44 years left | 67 sqm | S$395,000 | S$5,896 psm |
| Jul 2025 | Blk 158 · 3 ROOM · 04 TO 06 · Improved · 46 years left | 65 sqm | S$378,088 | S$5,817 psm |
| Jul 2025 | Blk 107 · 3 ROOM · 04 TO 06 · Improved · 44 years left | 67 sqm | S$380,000 | S$5,672 psm |
| Jul 2025 | Blk 169 · 3 ROOM · 01 TO 03 · Improved · 46 years left | 76 sqm | S$400,000 | S$5,263 psm |
| Jul 2025 | Blk 98 · 3 ROOM · 16 TO 18 · Improved · 44 years left | 68 sqm | S$416,000 | S$6,118 psm |
| Jul 2025 | Blk 112 · 3 ROOM · 04 TO 06 · Improved · 41 years left | 65 sqm | S$375,000 | S$5,769 psm |
| Jul 2025 | Blk 126 · 3 ROOM · 16 TO 18 · Improved · 44 years left | 67 sqm | S$459,000 | S$6,851 psm |
| Jul 2025 | Blk 159 · 3 ROOM · 07 TO 09 · Improved · 46 years left | 65 sqm | S$395,000 | S$6,077 psm |
| Jul 2025 | Blk 159 · 3 ROOM · 07 TO 09 · Improved · 46 years left | 65 sqm | S$390,000 | S$6,000 psm |
| Jun 2025 | Blk 238 · 5 ROOM · 10 TO 12 · Improved · 60 years left | 123 sqm | S$1,008,000 | S$8,195 psm |
| Jun 2025 | Blk 156 · 4 ROOM · 07 TO 09 · Model A · 73 years left | 101 sqm | S$890,000 | S$8,812 psm |
| Jun 2025 | Blk 130A · 4 ROOM · 10 TO 12 · Model A · 92 years left | 93 sqm | S$1,100,000 | S$11,828 psm |
| Jun 2025 | Blk 123 · 3 ROOM · 04 TO 06 · Improved · 44 years left | 67 sqm | S$370,888 | S$5,536 psm |
| Jun 2025 | Blk 130A · 3 ROOM · 34 TO 36 · Model A · 92 years left | 68 sqm | S$850,000 | S$12,500 psm |
| Jun 2025 | Blk 100 · 3 ROOM · 07 TO 09 · Improved · 44 years left | 68 sqm | S$370,000 | S$5,441 psm |
| Jun 2025 | Blk 173 · 3 ROOM · 07 TO 09 · Improved · 46 years left | 66 sqm | S$370,000 | S$5,606 psm |
| Jun 2025 | Blk 115 · 3 ROOM · 01 TO 03 · Improved · 41 years left | 65 sqm | S$380,000 | S$5,846 psm |
| Jun 2025 | Blk 169 · 3 ROOM · 07 TO 09 · Improved · 46 years left | 65 sqm | S$418,888 | S$6,444 psm |
| Jun 2025 | Blk 169 · 3 ROOM · 04 TO 06 · Improved · 46 years left | 65 sqm | S$360,000 | S$5,538 psm |
| Jun 2025 | Blk 157 · 3 ROOM · 10 TO 12 · Improved · 45 years left | 67 sqm | S$408,000 | S$6,090 psm |
| Jun 2025 | Blk 161 · 2 ROOM · 01 TO 03 · Improved · 46 years left | 40 sqm | S$301,000 | S$7,525 psm |
| Jun 2025 | Blk 161 · 2 ROOM · 07 TO 09 · Improved · 46 years left | 41 sqm | S$300,000 | S$7,317 psm |
| May 2025 | Blk 237 · EXECUTIVE · 07 TO 09 · Maisonette · 60 years left | 146 sqm | S$1,095,000 | S$7,500 psm |
| May 2025 | Blk 239 · 5 ROOM · 13 TO 15 · Improved · 60 years left | 123 sqm | S$918,000 | S$7,463 psm |
| May 2025 | Blk 171 · 5 ROOM · 13 TO 15 · Improved · 69 years left | 123 sqm | S$980,000 | S$7,967 psm |
| May 2025 | Blk 238 · 4 ROOM · 10 TO 12 · Model A · 60 years left | 103 sqm | S$788,000 | S$7,650 psm |
| May 2025 | Blk 130A · 4 ROOM · 25 TO 27 · Model A · 92 years left | 93 sqm | S$1,150,000 | S$12,366 psm |
| May 2025 | Blk 172A · 4 ROOM · 01 TO 03 · Model A · 69 years left excluded: outlier | 105 sqm | S$740,000 | S$7,048 psm |
| May 2025 | Blk 110 · 3 ROOM · 10 TO 12 · Improved · 41 years left | 65 sqm | S$385,000 | S$5,923 psm |
| May 2025 | Blk 131A · 3 ROOM · 07 TO 09 · Model A · 92 years left | 68 sqm | S$768,000 | S$11,294 psm |
| May 2025 | Blk 98 · 3 ROOM · 01 TO 03 · Improved · 44 years left | 68 sqm | S$393,000 | S$5,779 psm |
| May 2025 | Blk 130B · 3 ROOM · 16 TO 18 · Model A · 92 years left | 68 sqm | S$800,000 | S$11,765 psm |
| May 2025 | Blk 131A · 3 ROOM · 25 TO 27 · Model A · 92 years left | 68 sqm | S$813,000 | S$11,956 psm |
| May 2025 | Blk 173 · 3 ROOM · 01 TO 03 · Improved · 46 years left | 66 sqm | S$338,888 | S$5,135 psm |
| May 2025 | Blk 157 · 3 ROOM · 07 TO 09 · Improved · 45 years left | 67 sqm | S$416,888 | S$6,222 psm |
| May 2025 | Blk 168 · 3 ROOM · 07 TO 09 · Improved · 46 years left | 76 sqm | S$455,000 | S$5,987 psm |
| May 2025 | Blk 161 · 2 ROOM · 07 TO 09 · Improved · 46 years left | 40 sqm | S$290,000 | S$7,250 psm |
| Apr 2025 | Blk 153A · 4 ROOM · 13 TO 15 · Model A · 73 years left | 101 sqm | S$910,000 | S$9,010 psm |
| Apr 2025 | Blk 130B · 4 ROOM · 22 TO 24 · Model A · 92 years left | 93 sqm | S$1,135,000 | S$12,204 psm |
| Apr 2025 | Blk 131A · 4 ROOM · 34 TO 36 · Model A · 92 years left | 93 sqm | S$1,170,000 | S$12,581 psm |
| Apr 2025 | Blk 126 · 3 ROOM · 07 TO 09 · Improved · 44 years left | 67 sqm | S$411,000 | S$6,134 psm |
| Apr 2025 | Blk 125 · 3 ROOM · 13 TO 15 · Improved · 44 years left | 67 sqm | S$420,000 | S$6,269 psm |
| Apr 2025 | Blk 168 · 3 ROOM · 04 TO 06 · Improved · 46 years left | 65 sqm | S$371,000 | S$5,708 psm |
| Apr 2025 | Blk 100 · 3 ROOM · 16 TO 18 · Improved · 44 years left | 68 sqm | S$450,000 | S$6,618 psm |
| Apr 2025 | Blk 100 · 3 ROOM · 01 TO 03 · Improved · 44 years left | 68 sqm | S$365,888 | S$5,381 psm |
| Apr 2025 | Blk 130A · 3 ROOM · 13 TO 15 · Model A · 92 years left | 68 sqm | S$815,000 | S$11,985 psm |
| Apr 2025 | Blk 173 · 3 ROOM · 07 TO 09 · Improved · 46 years left | 66 sqm | S$363,000 | S$5,500 psm |
| Mar 2025 | Blk 236 · EXECUTIVE · 07 TO 09 · Maisonette · 61 years left | 146 sqm | S$1,135,000 | S$7,774 psm |
| Mar 2025 | Blk 171 · 5 ROOM · 04 TO 06 · Improved · 69 years left | 123 sqm | S$970,000 | S$7,886 psm |
| Mar 2025 | Blk 238 · 4 ROOM · 04 TO 06 · Model A · 60 years left | 103 sqm | S$748,000 | S$7,262 psm |
| Mar 2025 | Blk 131B · 4 ROOM · 34 TO 36 · Model A · 93 years left | 93 sqm | S$1,120,888 | S$12,053 psm |
| Mar 2025 | Blk 131B · 4 ROOM · 28 TO 30 · Model A · 93 years left | 93 sqm | S$1,160,000 | S$12,473 psm |
| Mar 2025 | Blk 131A · 4 ROOM · 25 TO 27 · Model A · 93 years left | 93 sqm | S$1,165,000 | S$12,527 psm |
| Mar 2025 | Blk 131B · 4 ROOM · 16 TO 18 · Model A · 93 years left | 93 sqm | S$1,070,000 | S$11,505 psm |
| Mar 2025 | Blk 123 · 3 ROOM · 01 TO 03 · Improved · 44 years left | 67 sqm | S$380,000 | S$5,672 psm |
| Mar 2025 | Blk 108 · 3 ROOM · 01 TO 03 · Improved · 44 years left | 66 sqm | S$360,000 | S$5,455 psm |
| Mar 2025 | Blk 115 · 3 ROOM · 07 TO 09 · Improved · 41 years left | 65 sqm | S$365,000 | S$5,615 psm |
| Mar 2025 | Blk 130B · 3 ROOM · 37 TO 39 · Model A · 93 years left | 68 sqm | S$830,000 | S$12,206 psm |
| Mar 2025 | Blk 157 · 3 ROOM · 10 TO 12 · Improved · 45 years left | 67 sqm | S$422,000 | S$6,299 psm |
| Mar 2025 | Blk 168 · 3 ROOM · 04 TO 06 · Improved · 47 years left | 76 sqm | S$400,000 | S$5,263 psm |
| Feb 2025 | Blk 172 · 5 ROOM · 22 TO 24 · Improved · 69 years left | 124 sqm | S$1,080,000 | S$8,710 psm |
| Feb 2025 | Blk 131A · 4 ROOM · 07 TO 09 · Model A · 93 years left | 93 sqm | S$1,070,000 | S$11,505 psm |
| Feb 2025 | Blk 130A · 4 ROOM · 22 TO 24 · Model A · 93 years left | 93 sqm | S$1,120,000 | S$12,043 psm |
| Feb 2025 | Blk 131B · 3 ROOM · 16 TO 18 · Model A · 93 years left | 68 sqm | S$788,000 | S$11,588 psm |
| Feb 2025 | Blk 125 · 3 ROOM · 07 TO 09 · Improved · 44 years left | 67 sqm | S$410,000 | S$6,119 psm |
| Feb 2025 | Blk 157 · 3 ROOM · 07 TO 09 · Improved · 46 years left | 67 sqm | S$392,000 | S$5,851 psm |
| Feb 2025 | Blk 100 · 3 ROOM · 04 TO 06 · Improved · 44 years left | 68 sqm | S$398,000 | S$5,853 psm |
| Feb 2025 | Blk 119 · 3 ROOM · 07 TO 09 · Improved · 43 years left | 65 sqm | S$378,000 | S$5,815 psm |
| Feb 2025 | Blk 126 · 3 ROOM · 04 TO 06 · Improved · 44 years left | 67 sqm | S$350,000 | S$5,224 psm |
| Feb 2025 | Blk 123 · 3 ROOM · 07 TO 09 · Improved · 44 years left | 67 sqm | S$398,000 | S$5,940 psm |
| Jan 2025 | Blk 171 · 5 ROOM · 01 TO 03 · Improved · 69 years left | 124 sqm | S$868,000 | S$7,000 psm |
| Jan 2025 | Blk 130B · 4 ROOM · 16 TO 18 · Model A · 93 years left | 93 sqm | S$1,115,000 | S$11,989 psm |
| Jan 2025 | Blk 238 · 4 ROOM · 19 TO 21 · Model A · 61 years left | 103 sqm | S$768,000 | S$7,456 psm |
| Jan 2025 | Blk 130A · 4 ROOM · 22 TO 24 · Model A · 93 years left | 93 sqm | S$1,138,888 | S$12,246 psm |
| Jan 2025 | Blk 131A · 4 ROOM · 04 TO 06 · Model A · 93 years left excluded: outlier | 93 sqm | S$998,000 | S$10,731 psm |
| Jan 2025 | Blk 130A · 3 ROOM · 16 TO 18 · Model A · 93 years left | 68 sqm | S$780,000 | S$11,471 psm |
| Jan 2025 | Blk 98 · 3 ROOM · 10 TO 12 · Improved · 44 years left | 68 sqm | S$416,000 | S$6,118 psm |
| Jan 2025 | Blk 114 · 3 ROOM · 04 TO 06 · Improved · 42 years left | 65 sqm | S$382,888 | S$5,891 psm |
| Jan 2025 | Blk 100 · 3 ROOM · 04 TO 06 · Improved · 44 years left | 68 sqm | S$388,000 | S$5,706 psm |
| Jan 2025 | Blk 125 · 3 ROOM · 13 TO 15 · Improved · 44 years left | 67 sqm | S$415,000 | S$6,194 psm |
| Jan 2025 | Blk 131B · 3 ROOM · 34 TO 36 · Model A · 93 years left | 68 sqm | S$815,000 | S$11,985 psm |
| Jan 2025 | Blk 158 · 3 ROOM · 01 TO 03 · Improved · 46 years left | 65 sqm | S$380,000 | S$5,846 psm |
| Jan 2025 | Blk 108 · 3 ROOM · 04 TO 06 · Improved · 44 years left | 66 sqm | S$370,000 | S$5,606 psm |
| Jan 2025 | Blk 123 · 3 ROOM · 07 TO 09 · Improved · 44 years left | 79 sqm | S$428,000 | S$5,418 psm |
| Jan 2025 | Blk 161 · 2 ROOM · 07 TO 09 · Improved · 46 years left | 40 sqm | S$292,000 | S$7,300 psm |
| Dec 2024 | Blk 131A · 4 ROOM · 10 TO 12 · Model A · 93 years left | 93 sqm | S$1,118,000 | S$12,022 psm |
| Dec 2024 | Blk 236 · EXECUTIVE · 01 TO 03 · Maisonette · 61 years left | 146 sqm | S$1,100,000 | S$7,534 psm |
| Dec 2024 | Blk 153A · 5 ROOM · 10 TO 12 · Improved · 73 years left | 124 sqm | S$1,100,000 | S$8,871 psm |
| Dec 2024 | Blk 130B · 4 ROOM · 10 TO 12 · Model A · 93 years left | 93 sqm | S$1,100,000 | S$11,828 psm |
| Dec 2024 | Blk 131A · 4 ROOM · 07 TO 09 · Model A · 93 years left | 93 sqm | S$1,070,000 | S$11,505 psm |
| Dec 2024 | Blk 156 · 5 ROOM · 07 TO 09 · Improved · 73 years left | 121 sqm | S$1,000,000 | S$8,264 psm |
| Dec 2024 | Blk 130B · 4 ROOM · 04 TO 06 · Model A · 93 years left excluded: outlier | 93 sqm | S$989,800 | S$10,643 psm |
| Dec 2024 | Blk 239 · 5 ROOM · 19 TO 21 · Improved · 61 years left | 122 sqm | S$900,000 | S$7,377 psm |
| Dec 2024 | Blk 109 · 3 ROOM · 07 TO 09 · Improved · 44 years left | 66 sqm | S$445,000 | S$6,742 psm |
| Dec 2024 | Blk 173 · 3 ROOM · 10 TO 12 · Improved · 47 years left | 77 sqm | S$425,000 | S$5,519 psm |
| Dec 2024 | Blk 168 · 3 ROOM · 04 TO 06 · Improved · 47 years left | 76 sqm | S$420,000 | S$5,526 psm |
| Dec 2024 | Blk 124 · 3 ROOM · 04 TO 06 · Improved · 44 years left | 67 sqm | S$400,000 | S$5,970 psm |
| Dec 2024 | Blk 128 · 3 ROOM · 07 TO 09 · Improved · 44 years left | 67 sqm | S$400,000 | S$5,970 psm |
| Dec 2024 | Blk 98 · 3 ROOM · 01 TO 03 · Improved · 44 years left | 68 sqm | S$380,000 | S$5,588 psm |
| Dec 2024 | Blk 110 · 3 ROOM · 01 TO 03 · Improved · 42 years left | 64 sqm | S$360,000 | S$5,625 psm |
| Dec 2024 | Blk 173 · 3 ROOM · 01 TO 03 · Improved · 47 years left | 66 sqm | S$360,000 | S$5,455 psm |
| Dec 2024 | Blk 114 · 3 ROOM · 01 TO 03 · Improved · 42 years left | 65 sqm | S$360,000 | S$5,538 psm |
| Dec 2024 | Blk 118 · 3 ROOM · 01 TO 03 · Improved · 43 years left | 65 sqm | S$350,000 | S$5,385 psm |
| Nov 2024 | Blk 153A · 5 ROOM · 10 TO 12 · Improved · 73 years left | 121 sqm | S$1,165,000 | S$9,628 psm |
| Nov 2024 | Blk 130A · 4 ROOM · 16 TO 18 · Model A · 93 years left | 93 sqm | S$1,120,000 | S$12,043 psm |
| Nov 2024 | Blk 131A · 3 ROOM · 28 TO 30 · Model A · 93 years left | 68 sqm | S$795,000 | S$11,691 psm |
Showing 300 of 2723.
Sale prices as filed in caveats.
| Period | Detail | Monthly rent | Per area |
|---|---|---|---|
| Sept 2026 | Blk 130B · 4 ROOM | S$4,500 | — |
| Sept 2026 | Blk 130B · 4 ROOM | S$4,000 | — |
| Sept 2026 | Blk 171 · 5 ROOM | S$3,900 | — |
| Sept 2026 | Blk 131A · 3 ROOM | S$3,600 | — |
| Sept 2026 | Blk 111 · 3 ROOM | S$3,500 | — |
| Sept 2026 | Blk 158 · 3 ROOM | S$3,300 | — |
| Sept 2026 | Blk 110 · 3 ROOM | S$3,200 | — |
| Sept 2026 | Blk 158 · 3 ROOM | S$3,200 | — |
| Sept 2026 | Blk 113 · 3 ROOM | S$3,150 | — |
| Sept 2026 | Blk 157 · 3 ROOM | S$3,000 | — |
| Sept 2026 | Blk 128 · 3 ROOM | S$2,900 | — |
| Sept 2026 | Blk 158 · 3 ROOM | S$2,800 | — |
| Sept 2026 | Blk 115 · 3 ROOM | S$2,800 | — |
| Sept 2026 | Blk 125 · 3 ROOM | S$2,500 | — |
| Sept 2026 | Blk 118 · 3 ROOM | S$1,550 | — |
| Aug 2026 | Blk 130A · 4 ROOM | S$4,500 | — |
| Aug 2026 | Blk 171 · 4 ROOM | S$4,000 | — |
| Aug 2026 | Blk 128 · 3 ROOM | S$3,400 | — |
| Aug 2026 | Blk 171 · 5 ROOM | S$3,300 | — |
| Aug 2026 | Blk 110 · 3 ROOM | S$3,300 | — |
| Aug 2026 | Blk 110 · 3 ROOM | S$3,300 | — |
| Aug 2026 | Blk 115 · 3 ROOM | S$3,300 | — |
| Aug 2026 | Blk 112 · 3 ROOM | S$3,250 | — |
| Aug 2026 | Blk 126 · 3 ROOM | S$3,200 | — |
| Aug 2026 | Blk 123 · 3 ROOM | S$3,150 | — |
| Aug 2026 | Blk 169 · 3 ROOM | S$3,050 | — |
| Aug 2026 | Blk 98 · 3 ROOM | S$3,000 | — |
| Aug 2026 | Blk 100 · 3 ROOM | S$3,000 | — |
| Aug 2026 | Blk 112 · 3 ROOM | S$2,900 | — |
| Aug 2026 | Blk 119 · 3 ROOM | S$2,850 | — |
| Aug 2026 | Blk 117 · 3 ROOM | S$2,850 | — |
| Aug 2026 | Blk 118 · 3 ROOM | S$2,800 | — |
| Aug 2026 | Blk 161 · 2 ROOM | S$2,300 | — |
| Aug 2026 | Blk 163 · 3 ROOM | S$2,200 | — |
| Aug 2026 | Blk 98 · 3 ROOM | S$2,000 | — |
| Aug 2026 | Blk 128 · 3 ROOM | S$1,400 | — |
| Jul 2026 | Blk 158 · 5 ROOM | S$5,000 | — |
| Jul 2026 | Blk 155 · 4 ROOM | S$4,100 | — |
| Jul 2026 | Blk 98 · 3 ROOM | S$3,600 | — |
| Jul 2026 | Blk 238 · 5 ROOM | S$3,500 | — |
| Jul 2026 | Blk 131B · 3 ROOM | S$3,500 | — |
| Jul 2026 | Blk 113 · 3 ROOM | S$3,100 | — |
| Jul 2026 | Blk 126 · 3 ROOM | S$3,028 | — |
| Jul 2026 | Blk 168 · 3 ROOM | S$3,000 | — |
| Jul 2026 | Blk 128 · 3 ROOM | S$3,000 | — |
| Jul 2026 | Blk 98 · 3 ROOM | S$2,900 | — |
| Jul 2026 | Blk 125 · 3 ROOM | S$2,800 | — |
| Jul 2026 | Blk 157 · 3 ROOM | S$2,800 | — |
| Jul 2026 | Blk 108 · 3 ROOM | S$2,800 | — |
| Jul 2026 | Blk 157 · 3 ROOM | S$2,750 | — |
| Jul 2026 | Blk 112 · 3 ROOM | S$2,300 | — |
| Jul 2026 | Blk 239 · 4 ROOM | S$2,300 | — |
| Jul 2026 | Blk 173 · 3 ROOM | S$2,250 | — |
| Jul 2026 | Blk 156 · 4 ROOM | S$1,900 | — |
| Jun 2026 | Blk 236 · EXECUTIVE | S$4,500 | — |
| Jun 2026 | Blk 171 · 4 ROOM | S$4,150 | — |
| Jun 2026 | Blk 155 · 4 ROOM | S$4,000 | — |
| Jun 2026 | Blk 239 · 4 ROOM | S$4,000 | — |
| Jun 2026 | Blk 155 · 4 ROOM | S$3,650 | — |
| Jun 2026 | Blk 114 · 3 ROOM | S$3,600 | — |
| Jun 2026 | Blk 130A · 3 ROOM | S$3,600 | — |
| Jun 2026 | Blk 114 · 3 ROOM | S$3,400 | — |
| Jun 2026 | Blk 174 · 3 ROOM | S$3,300 | — |
| Jun 2026 | Blk 112 · 3 ROOM | S$3,200 | — |
| Jun 2026 | Blk 126 · 3 ROOM | S$3,150 | — |
| Jun 2026 | Blk 158 · 3 ROOM | S$3,100 | — |
| Jun 2026 | Blk 125 · 3 ROOM | S$3,000 | — |
| Jun 2026 | Blk 156 · 4 ROOM | S$2,950 | — |
| Jun 2026 | Blk 159 · 3 ROOM | S$2,900 | — |
| Jun 2026 | Blk 157 · 3 ROOM | S$2,800 | — |
| Jun 2026 | Blk 117 · 3 ROOM | S$2,600 | — |
| Jun 2026 | Blk 163 · 3 ROOM | S$2,300 | — |
| Jun 2026 | Blk 118 · 3 ROOM | S$1,600 | — |
| May 2026 | Blk 239 · 4 ROOM | S$4,500 | — |
| May 2026 | Blk 131A · 4 ROOM | S$4,500 | — |
| May 2026 | Blk 112 · 3 ROOM | S$3,500 | — |
| May 2026 | Blk 117 · 3 ROOM | S$3,400 | — |
| May 2026 | Blk 114 · 3 ROOM | S$3,350 | — |
| May 2026 | Blk 125 · 3 ROOM | S$3,200 | — |
| May 2026 | Blk 236 · EXECUTIVE | S$3,200 | — |
| May 2026 | Blk 157 · 3 ROOM | S$3,200 | — |
| May 2026 | Blk 131B · 3 ROOM | S$3,200 | — |
| May 2026 | Blk 100 · 3 ROOM | S$3,200 | — |
| May 2026 | Blk 173 · 3 ROOM | S$3,150 | — |
| May 2026 | Blk 123 · 3 ROOM | S$3,100 | — |
| May 2026 | Blk 168 · 3 ROOM | S$3,100 | — |
| May 2026 | Blk 107 · 3 ROOM | S$3,100 | — |
| May 2026 | Blk 125 · 3 ROOM | S$3,100 | — |
| May 2026 | Blk 112 · 3 ROOM | S$3,000 | — |
| May 2026 | Blk 124 · 3 ROOM | S$3,000 | — |
| May 2026 | Blk 159 · 3 ROOM | S$3,000 | — |
| May 2026 | Blk 110 · 3 ROOM | S$2,800 | — |
| May 2026 | Blk 157 · 3 ROOM | S$2,650 | — |
| May 2026 | Blk 157 · 3 ROOM | S$2,600 | — |
| May 2026 | Blk 168 · 3 ROOM | S$2,500 | — |
| May 2026 | Blk 173 · 3 ROOM | S$2,500 | — |
| May 2026 | Blk 173 · 3 ROOM | S$2,200 | — |
| May 2026 | Blk 156 · 4 ROOM | S$2,150 | — |
| May 2026 | Blk 115 · 3 ROOM | S$2,000 | — |
| Apr 2026 | Blk 236 · EXECUTIVE | S$5,200 | — |
| Apr 2026 | Blk 156 · 4 ROOM | S$4,000 | — |
| Apr 2026 | Blk 171 · 5 ROOM | S$3,900 | — |
| Apr 2026 | Blk 126 · 3 ROOM | S$3,200 | — |
| Apr 2026 | Blk 174 · 3 ROOM | S$3,000 | — |
| Apr 2026 | Blk 158 · 3 ROOM | S$3,000 | — |
| Apr 2026 | Blk 109 · 3 ROOM | S$2,900 | — |
| Apr 2026 | Blk 110 · 3 ROOM | S$2,850 | — |
| Apr 2026 | Blk 100 · 3 ROOM | S$2,800 | — |
| Apr 2026 | Blk 119 · 3 ROOM | S$2,600 | — |
| Apr 2026 | Blk 109 · 3 ROOM | S$2,500 | — |
| Apr 2026 | Blk 157 · 3 ROOM | S$2,450 | — |
| Apr 2026 | Blk 112 · 3 ROOM | S$2,300 | — |
| Apr 2026 | Blk 168 · 3 ROOM | S$1,500 | — |
| Mar 2026 | Blk 131B · 4 ROOM | S$4,500 | — |
| Mar 2026 | Blk 153A · 5 ROOM | S$4,300 | — |
| Mar 2026 | Blk 402B · 4 ROOM | S$4,300 | — |
| Mar 2026 | Blk 153A · 4 ROOM | S$4,000 | — |
| Mar 2026 | Blk 131B · 4 ROOM | S$3,900 | — |
| Mar 2026 | Blk 174 · 3 ROOM | S$3,300 | — |
| Mar 2026 | Blk 114 · 3 ROOM | S$3,300 | — |
| Mar 2026 | Blk 126 · 3 ROOM | S$3,250 | — |
| Mar 2026 | Blk 173 · 3 ROOM | S$3,250 | — |
| Mar 2026 | Blk 98 · 3 ROOM | S$3,150 | — |
| Mar 2026 | Blk 168 · 3 ROOM | S$3,100 | — |
| Mar 2026 | Blk 114 · 3 ROOM | S$3,100 | — |
| Mar 2026 | Blk 108 · 3 ROOM | S$3,000 | — |
| Mar 2026 | Blk 174 · 3 ROOM | S$3,000 | — |
| Mar 2026 | Blk 157 · 3 ROOM | S$3,000 | — |
| Mar 2026 | Blk 115 · 3 ROOM | S$3,000 | — |
| Mar 2026 | Blk 108 · 3 ROOM | S$3,000 | — |
| Mar 2026 | Blk 123 · 3 ROOM | S$3,000 | — |
| Mar 2026 | Blk 124 · 3 ROOM | S$2,950 | — |
| Mar 2026 | Blk 157 · 3 ROOM | S$2,900 | — |
| Mar 2026 | Blk 115 · 3 ROOM | S$2,800 | — |
| Mar 2026 | Blk 108 · 3 ROOM | S$2,800 | — |
| Mar 2026 | Blk 98 · 3 ROOM | S$2,800 | — |
| Mar 2026 | Blk 108 · 3 ROOM | S$2,800 | — |
| Mar 2026 | Blk 157 · 3 ROOM | S$2,600 | — |
| Mar 2026 | Blk 108 · 3 ROOM | S$2,600 | — |
| Mar 2026 | Blk 100 · 3 ROOM | S$2,500 | — |
| Mar 2026 | Blk 157 · 3 ROOM | S$2,500 | — |
| Mar 2026 | Blk 158 · 3 ROOM | S$2,150 | — |
| Mar 2026 | Blk 174 · 3 ROOM | S$2,000 | — |
| Mar 2026 | Blk 157 · 3 ROOM | S$2,000 | — |
| Mar 2026 | Blk 100 · 3 ROOM | S$1,700 | — |
| Mar 2026 | Blk 174 · 3 ROOM | S$1,300 | — |
| Feb 2026 | Blk 237 · EXECUTIVE | S$4,800 | — |
| Feb 2026 | Blk 131B · 4 ROOM | S$4,500 | — |
| Feb 2026 | Blk 130A · 4 ROOM | S$4,500 | — |
| Feb 2026 | Blk 171 · 5 ROOM | S$4,200 | — |
| Feb 2026 | Blk 239 · 5 ROOM | S$3,600 | — |
| Feb 2026 | Blk 157 · 3 ROOM | S$3,300 | — |
| Feb 2026 | Blk 100 · 3 ROOM | S$3,300 | — |
| Feb 2026 | Blk 163 · 3 ROOM | S$3,200 | — |
| Feb 2026 | Blk 100 · 3 ROOM | S$3,200 | — |
| Feb 2026 | Blk 109 · 3 ROOM | S$3,100 | — |
| Feb 2026 | Blk 126 · 3 ROOM | S$3,100 | — |
| Feb 2026 | Blk 159 · 3 ROOM | S$3,100 | — |
| Feb 2026 | Blk 119 · 3 ROOM | S$3,100 | — |
| Feb 2026 | Blk 114 · 3 ROOM | S$3,000 | — |
| Feb 2026 | Blk 108 · 3 ROOM | S$3,000 | — |
| Feb 2026 | Blk 128 · 3 ROOM | S$3,000 | — |
| Feb 2026 | Blk 113 · 3 ROOM | S$2,950 | — |
| Feb 2026 | Blk 113 · 3 ROOM | S$2,750 | — |
| Feb 2026 | Blk 158 · 3 ROOM | S$2,700 | — |
| Feb 2026 | Blk 160 · 2 ROOM | S$2,700 | — |
| Feb 2026 | Blk 169 · 3 ROOM | S$2,700 | — |
| Feb 2026 | Blk 113 · 3 ROOM | S$2,600 | — |
| Feb 2026 | Blk 108 · 3 ROOM | S$2,300 | — |
| Feb 2026 | Blk 108 · 3 ROOM | S$2,200 | — |
| Jan 2026 | Blk 157 · 5 ROOM | S$5,600 | — |
| Jan 2026 | Blk 131A · 4 ROOM | S$5,000 | — |
| Jan 2026 | Blk 403A · 4 ROOM | S$4,600 | — |
| Jan 2026 | Blk 130B · 4 ROOM | S$4,450 | — |
| Jan 2026 | Blk 171 · 5 ROOM | S$4,200 | — |
| Jan 2026 | Blk 171 · 4 ROOM | S$4,000 | — |
| Jan 2026 | Blk 236 · EXECUTIVE | S$3,900 | — |
| Jan 2026 | Blk 131B · 3 ROOM | S$3,700 | — |
| Jan 2026 | Blk 238 · 5 ROOM | S$3,600 | — |
| Jan 2026 | Blk 163 · 3 ROOM | S$3,500 | — |
| Jan 2026 | Blk 131A · 3 ROOM | S$3,500 | — |
| Jan 2026 | Blk 110 · 3 ROOM | S$3,400 | — |
| Jan 2026 | Blk 157 · 3 ROOM | S$3,300 | — |
| Jan 2026 | Blk 123 · 3 ROOM | S$3,200 | — |
| Jan 2026 | Blk 124 · 3 ROOM | S$3,100 | — |
| Jan 2026 | Blk 126 · 3 ROOM | S$3,000 | — |
| Jan 2026 | Blk 158 · 3 ROOM | S$3,000 | — |
| Jan 2026 | Blk 173 · 3 ROOM | S$3,000 | — |
| Jan 2026 | Blk 126 · 3 ROOM | S$3,000 | — |
| Jan 2026 | Blk 113 · 3 ROOM | S$3,000 | — |
| Jan 2026 | Blk 173 · 3 ROOM | S$2,900 | — |
| Jan 2026 | Blk 113 · 3 ROOM | S$2,900 | — |
| Jan 2026 | Blk 100 · 3 ROOM | S$2,800 | — |
| Jan 2026 | Blk 157 · 3 ROOM | S$2,800 | — |
| Jan 2026 | Blk 100 · 3 ROOM | S$2,800 | — |
| Jan 2026 | Blk 157 · 3 ROOM | S$2,800 | — |
| Jan 2026 | Blk 113 · 3 ROOM | S$2,580 | — |
| Jan 2026 | Blk 100 · 3 ROOM | S$2,400 | — |
| Jan 2026 | Blk 131B · 3 ROOM | S$2,300 | — |
| Jan 2026 | Blk 128 · 3 ROOM | S$2,200 | — |
| Jan 2026 | Blk 118 · 3 ROOM | S$2,000 | — |
| Jan 2026 | Blk 161 · 2 ROOM | S$2,000 | — |
| Jan 2026 | Blk 156 · 4 ROOM | S$2,000 | — |
| Jan 2026 | Blk 107 · 3 ROOM | S$1,700 | — |
| Jan 2026 | Blk 128 · 3 ROOM | S$1,700 | — |
| Dec 2025 | Blk 155 · 4 ROOM | S$4,500 | — |
| Dec 2025 | Blk 172 · 5 ROOM | S$4,100 | — |
| Dec 2025 | Blk 402B · 4 ROOM | S$4,080 | — |
| Dec 2025 | Blk 159 · 3 ROOM | S$3,220 | — |
| Dec 2025 | Blk 128 · 3 ROOM | S$3,200 | — |
| Dec 2025 | Blk 126 · 3 ROOM | S$3,200 | — |
| Dec 2025 | Blk 107 · 3 ROOM | S$3,100 | — |
| Dec 2025 | Blk 158 · 3 ROOM | S$3,100 | — |
| Dec 2025 | Blk 115 · 3 ROOM | S$3,100 | — |
| Dec 2025 | Blk 115 · 3 ROOM | S$3,100 | — |
| Dec 2025 | Blk 174 · 3 ROOM | S$3,000 | — |
| Dec 2025 | Blk 123 · 3 ROOM | S$3,000 | — |
| Dec 2025 | Blk 124 · 3 ROOM | S$3,000 | — |
| Dec 2025 | Blk 109 · 3 ROOM | S$2,950 | — |
| Dec 2025 | Blk 128 · 3 ROOM | S$2,900 | — |
| Dec 2025 | Blk 100 · 3 ROOM | S$2,900 | — |
| Dec 2025 | Blk 174 · 3 ROOM | S$2,800 | — |
| Dec 2025 | Blk 168 · 3 ROOM | S$2,400 | — |
| Dec 2025 | Blk 115 · 3 ROOM | S$2,200 | — |
| Dec 2025 | Blk 159 · 3 ROOM | S$1,800 | — |
| Nov 2025 | Blk 402A · 4 ROOM | S$4,500 | — |
| Nov 2025 | Blk 403A · 4 ROOM | S$4,500 | — |
| Nov 2025 | Blk 239 · 5 ROOM | S$4,100 | — |
| Nov 2025 | Blk 239 · 5 ROOM | S$4,000 | — |
| Nov 2025 | Blk 130A · 3 ROOM | S$3,600 | — |
| Nov 2025 | Blk 128 · 3 ROOM | S$3,200 | — |
| Nov 2025 | Blk 159 · 3 ROOM | S$3,200 | — |
| Nov 2025 | Blk 128 · 3 ROOM | S$3,100 | — |
| Nov 2025 | Blk 117 · 3 ROOM | S$3,100 | — |
| Nov 2025 | Blk 157 · 3 ROOM | S$3,050 | — |
| Nov 2025 | Blk 157 · 3 ROOM | S$3,000 | — |
| Nov 2025 | Blk 112 · 3 ROOM | S$3,000 | — |
| Nov 2025 | Blk 125 · 3 ROOM | S$3,000 | — |
| Nov 2025 | Blk 118 · 3 ROOM | S$3,000 | — |
| Nov 2025 | Blk 108 · 3 ROOM | S$2,850 | — |
| Nov 2025 | Blk 128 · 3 ROOM | S$2,800 | — |
| Nov 2025 | Blk 128 · 3 ROOM | S$2,800 | — |
| Nov 2025 | Blk 112 · 3 ROOM | S$2,300 | — |
| Nov 2025 | Blk 157 · 3 ROOM | S$2,000 | — |
| Nov 2025 | Blk 174 · 3 ROOM | S$1,950 | — |
| Oct 2025 | Blk 153A · 5 ROOM | S$4,000 | — |
| Oct 2025 | Blk 171 · 4 ROOM | S$3,900 | — |
| Oct 2025 | Blk 171 · 4 ROOM | S$3,900 | — |
| Oct 2025 | Blk 239 · 4 ROOM | S$3,600 | — |
| Oct 2025 | Blk 157 · 3 ROOM | S$3,500 | — |
| Oct 2025 | Blk 168 · 3 ROOM | S$3,400 | — |
| Oct 2025 | Blk 163 · 3 ROOM | S$3,400 | — |
| Oct 2025 | Blk 157 · 3 ROOM | S$3,300 | — |
| Oct 2025 | Blk 111 · 3 ROOM | S$3,200 | — |
| Oct 2025 | Blk 117 · 3 ROOM | S$3,200 | — |
| Oct 2025 | Blk 123 · 3 ROOM | S$3,200 | — |
| Oct 2025 | Blk 239 · 4 ROOM | S$3,200 | — |
| Oct 2025 | Blk 158 · 3 ROOM | S$3,200 | — |
| Oct 2025 | Blk 158 · 3 ROOM | S$3,200 | — |
| Oct 2025 | Blk 100 · 3 ROOM | S$3,100 | — |
| Oct 2025 | Blk 114 · 3 ROOM | S$3,100 | — |
| Oct 2025 | Blk 126 · 3 ROOM | S$3,000 | — |
| Oct 2025 | Blk 115 · 3 ROOM | S$3,000 | — |
| Oct 2025 | Blk 126 · 3 ROOM | S$3,000 | — |
| Oct 2025 | Blk 126 · 3 ROOM | S$3,000 | — |
| Oct 2025 | Blk 98 · 3 ROOM | S$3,000 | — |
| Oct 2025 | Blk 110 · 3 ROOM | S$2,900 | — |
| Oct 2025 | Blk 112 · 3 ROOM | S$2,800 | — |
| Oct 2025 | Blk 159 · 3 ROOM | S$2,800 | — |
| Oct 2025 | Blk 124 · 3 ROOM | S$2,700 | — |
| Oct 2025 | Blk 98 · 3 ROOM | S$2,700 | — |
| Oct 2025 | Blk 108 · 3 ROOM | S$2,500 | — |
| Oct 2025 | Blk 117 · 3 ROOM | S$2,500 | — |
| Oct 2025 | Blk 125 · 3 ROOM | S$2,500 | — |
| Oct 2025 | Blk 107 · 3 ROOM | S$1,700 | — |
| Oct 2025 | Blk 100 · 3 ROOM | S$1,500 | — |
| Oct 2025 | Blk 117 · 3 ROOM | S$1,500 | — |
| Sept 2025 | Blk 155 · 4 ROOM | S$3,800 | — |
| Sept 2025 | Blk 110 · 3 ROOM | S$3,500 | — |
| Sept 2025 | Blk 130B · 3 ROOM | S$3,400 | — |
| Sept 2025 | Blk 171 · 5 ROOM | S$3,300 | — |
| Sept 2025 | Blk 128 · 3 ROOM | S$3,300 | — |
| Sept 2025 | Blk 173 · 3 ROOM | S$3,200 | — |
| Sept 2025 | Blk 110 · 3 ROOM | S$3,200 | — |
| Sept 2025 | Blk 128 · 3 ROOM | S$3,150 | — |
| Sept 2025 | Blk 126 · 3 ROOM | S$3,150 | — |
| Sept 2025 | Blk 174 · 3 ROOM | S$3,100 | — |
| Sept 2025 | Blk 118 · 3 ROOM | S$3,100 | — |
| Sept 2025 | Blk 118 · 3 ROOM | S$3,100 | — |
| Sept 2025 | Blk 98 · 3 ROOM | S$2,900 | — |
| Sept 2025 | Blk 159 · 3 ROOM | S$2,800 | — |
| Sept 2025 | Blk 98 · 3 ROOM | S$2,800 | — |
| Sept 2025 | Blk 157 · 3 ROOM | S$2,800 | — |
| Sept 2025 | Blk 158 · 3 ROOM | S$2,800 | — |
| Sept 2025 | Blk 158 · 3 ROOM | S$2,700 | — |
| Sept 2025 | Blk 128 · 3 ROOM | S$2,500 | — |
| Sept 2025 | Blk 118 · 3 ROOM | S$2,500 | — |
| Sept 2025 | Blk 98 · 3 ROOM | S$2,100 | — |
| Aug 2025 | Blk 130A · 4 ROOM | S$4,300 | — |
| Aug 2025 | Blk 130A · 4 ROOM | S$3,900 | — |
Showing 300 of 1719.
Rents as approved by HDB, or as filed with URA for private homes, where the floor area is given as a band.
3-Room resale prices in Toa Payoh
Embed these figures on your site
Free to use with the link intact. The card updates when the data does.