Bishan St 12 — recent transacted prices and indicative value
99-year lease · 57.2 years remaining · 44 addresses
Bishan St 12 has 57.2 years of lease remaining. Latest recorded sale 1 Oct 2026.
The median price at Bishan St 12 over the last 12 months was S$7,857 psm, from 75 recorded sales between Dec 2025 and Oct 2026, with most between S$7,554 psm and S$8,331 psm. This is an indicative figure from recorded transactions, not a formal valuation.
From 75 sales between Dec 2025 and Oct 2026 · 25th to 75th percentile S$7,554 psm to S$8,331 psmLatest recorded sale 1 Oct 2026
How has the price at Bishan St 12 changed?
The median price at Bishan St 12 has risen 22.0% from S$6,225 psm in Q1 2017 to S$7,594 psm in Q4 2026. This reflects recorded transactions and is not a formal valuation.
How accurate is this estimate for Bishan St 12?
We re-ran the estimate as of Q1 2026 on what was known at the time, then compared it with the 66 sales in Bishan St 12 since.
- Median error
- 4.7%
Half the estimates came closer than this to what the home actually fetched, half missed by more.
Value a unit here
Starts with this address. Type another address or postal code in this project to value that one.
Primary schools within 1 km of Bishan St 12
Measured from each school's land to this project's buildings, the way MOE bands P1 priority. MOE measures to the building's outline, so near 1 km check OneMap's School Query.
- Kuo Chuan Presbyterian Primary School · 331 m
- First Toa Payoh Primary School · 478 m · 36 of 44 buildings within 1 km · near the line — check on OneMap
- Catholic High School (boys) · 740 m · 23 of 44 buildings within 1 km · near the line — check on OneMap
- Kheng Cheng School · 761 m · 26 of 44 buildings within 1 km · near the line — check on OneMap
What does a unit at Bishan St 12 rent for?
A flat like this at Bishan St 12 rents for about S$3,700 a month, the middle of 68 HDB rental approvals in the last year. That is a gross yield of 6.04% on the indicative value. Indicative, from recorded rents.
What this flat earns against what it costs, set beside what homes like it earn.
6.04% gross yield
S$44,400 of rent a year against the estimate above · 1.09 points below flats like it
Homes like this rent for about S$3,700 a month, the middle of 68 approvals in the last year.
Across Singapore, flats of this type with 50 to 59 years of lease left yield 7.13%, from 99 blocks. This town has too few such blocks to measure on its own.
A yield above the mark means the flat rents well for what it costs, which can point to a keen rental patch or a price the sales alone have not caught up with. Below it, buyers are paying for something a tenant will not, such as the address itself.
Recent rental approvals used
| Approved | Block | Flat | Rent a month |
|---|---|---|---|
| Sept 2026 | 124 | 4 ROOM | S$4,100 |
| Sept 2026 | 107 | 4 ROOM | S$4,100 |
| Sept 2026 | 109 | 4 ROOM | S$4,100 |
| Sept 2026 | 114 | 4 ROOM | S$3,800 |
| Sept 2026 | 125 | 4 ROOM | S$3,700 |
| Sept 2026 | 127 | 4 ROOM | S$3,690 |
| Sept 2026 | 130 | 4 ROOM | S$3,600 |
| Sept 2026 | 109 | 4 ROOM | S$3,000 |
median of 68 HDB rental approvals for 4 ROOM on Bishan St 12 since 2025-11.
Get new sales by email
We'll email you when a new sale is filed at Bishan St 12. At most one email a week for this project, and only when something sold.
We use your address only to send this alert, and nothing else. Unsubscribe in one click from any email.
What flat types sell at Bishan St 12?
- 3 ROOM99 sales
- 4 ROOM435 sales
- 5 ROOM207 sales
- EXECUTIVE42 sales
- MULTI-GENERATION8 sales
Blocks in Bishan St 12
- Blk 101 Bishan St 12
- Blk 102 Bishan St 12
- Blk 103 Bishan St 12
- Blk 104 Bishan St 12
- Blk 105 Bishan St 12
- Blk 106 Bishan St 12
- Blk 107 Bishan St 12
- Blk 108 Bishan St 12
- Blk 109 Bishan St 12
- Blk 110 Bishan St 12
- Blk 111 Bishan St 12
- Blk 112 Bishan St 12
- Blk 113 Bishan St 12
- Blk 114 Bishan St 12
- Blk 115 Bishan St 12
- Blk 116 Bishan St 12
- Blk 117 Bishan St 12
- Blk 118 Bishan St 12
- Blk 119 Bishan St 12
- Blk 120 Bishan St 12
- Blk 121 Bishan St 12
- Blk 122 Bishan St 12
- Blk 123 Bishan St 12
- Blk 124 Bishan St 12
- Blk 125 Bishan St 12
- Blk 126 Bishan St 12
- Blk 127 Bishan St 12
- Blk 128 Bishan St 12
- Blk 129 Bishan St 12
- Blk 130 Bishan St 12
- Blk 131 Bishan St 12
- Blk 132 Bishan St 12
- Blk 133 Bishan St 12
- Blk 134 Bishan St 12
- Blk 135 Bishan St 12
- Blk 136 Bishan St 12
- Blk 137 Bishan St 12
- Blk 138 Bishan St 12
- Blk 139 Bishan St 12
- Blk 140 Bishan St 12
- Blk 141 Bishan St 12
- Blk 142 Bishan St 12
- Blk 143 Bishan St 12
- Blk 144 Bishan St 12
Nearest projects
- Toa Payoh Nth · 471 m · 357 sales
- Lor 3 Toa Payoh · 864 m · 87 sales
- Bishan St 13 · 923 m · 825 sales
- Bishan St 11 · 928 m · 154 sales
- Lor 6 Toa Payoh · 1023 m · 120 sales
Buying or selling here?
Buying: Stamp duty · Cash and CPF needed · How much can I borrow · Monthly repayment.
Selling: Net proceeds from selling.
What has sold at Bishan St 12 recently?
| Date | Detail | Area | Price | Per area |
|---|---|---|---|---|
| Oct 2026 | Blk 128 · 5 ROOM · 04 TO 06 · Improved · 59 years left | 121 sqm | S$900,000 | S$7,438 psm |
| Oct 2026 | Blk 144 · 4 ROOM · 04 TO 06 · Model A · 61 years left | 103 sqm | S$738,000 | S$7,165 psm |
| Oct 2026 | Blk 131 · 4 ROOM · 04 TO 06 · Simplified · 58 years left | 84 sqm | S$590,000 | S$7,024 psm |
| Oct 2026 | Blk 105 · 3 ROOM · 07 TO 09 · Simplified · 58 years left | 64 sqm | S$482,000 | S$7,531 psm |
| Oct 2026 | Blk 137 · MULTI-GENERATION · 07 TO 09 · Multi Generation · 60 years left | 165 sqm | S$1,548,888 | S$9,387 psm |
| Oct 2026 | Blk 103 · 5 ROOM · 07 TO 09 · Improved · 59 years left | 121 sqm | S$918,889 | S$7,594 psm |
| Oct 2026 | Blk 110 · 3 ROOM · 04 TO 06 · Simplified · 58 years left | 64 sqm | S$533,000 | S$8,328 psm |
| Oct 2026 | Blk 135 · 5 ROOM · 13 TO 15 · Improved · 60 years left | 121 sqm | S$930,000 | S$7,686 psm |
| Oct 2026 | Blk 113 · 4 ROOM · 10 TO 12 · Model A · 58 years left | 104 sqm | S$860,000 | S$8,269 psm |
| Sept 2026 | Blk 125 · 5 ROOM · 10 TO 12 · Improved · 60 years left | 121 sqm | S$968,000 | S$8,000 psm |
| Sept 2026 | Blk 141 · 4 ROOM · 07 TO 09 · Simplified · 61 years left | 84 sqm | S$638,000 | S$7,595 psm |
| Sept 2026 | Blk 125 · 5 ROOM · 10 TO 12 · Improved · 60 years left | 121 sqm | S$870,000 | S$7,190 psm |
| Sept 2026 | Blk 105 · 4 ROOM · 07 TO 09 · Model A · 58 years left | 104 sqm | S$848,000 | S$8,154 psm |
| Sept 2026 | Blk 119 · EXECUTIVE · 04 TO 06 · Apartment · 60 years left | 151 sqm | S$1,400,000 | S$9,272 psm |
| Sept 2026 | Blk 123 · 4 ROOM · 07 TO 09 · Simplified · 59 years left | 84 sqm | S$603,888 | S$7,189 psm |
| Sept 2026 | Blk 134 · EXECUTIVE · 07 TO 09 · Apartment · 59 years left | 151 sqm | S$1,295,000 | S$8,576 psm |
| Sept 2026 | Blk 128 · 5 ROOM · 07 TO 09 · Improved · 60 years left | 121 sqm | S$928,888 | S$7,677 psm |
| Sept 2026 | Blk 109 · 4 ROOM · 04 TO 06 · Simplified · 58 years left | 84 sqm | S$688,000 | S$8,190 psm |
| Sept 2026 | Blk 109 · 4 ROOM · 13 TO 15 · Model A · 58 years left | 105 sqm | S$890,000 | S$8,476 psm |
| Sept 2026 | Blk 144 · 4 ROOM · 07 TO 09 · Model A · 61 years left | 104 sqm | S$742,000 | S$7,135 psm |
| Aug 2026 | Blk 128 · 5 ROOM · 16 TO 18 · Improved · 60 years left | 121 sqm | S$880,000 | S$7,273 psm |
| Aug 2026 | Blk 128 · 5 ROOM · 04 TO 06 · Improved · 60 years left | 121 sqm | S$985,000 | S$8,141 psm |
| Aug 2026 | Blk 124 · 4 ROOM · 10 TO 12 · Simplified · 60 years left | 84 sqm | S$710,000 | S$8,452 psm |
| Aug 2026 | Blk 123 · 4 ROOM · 01 TO 03 · Simplified · 59 years left | 84 sqm | S$620,000 | S$7,381 psm |
| Aug 2026 | Blk 115 · 4 ROOM · 04 TO 06 · Model A · 59 years left | 104 sqm | S$836,000 | S$8,038 psm |
| Aug 2026 | Blk 130 · 4 ROOM · 10 TO 12 · Simplified · 59 years left | 84 sqm | S$650,000 | S$7,738 psm |
| Aug 2026 | Blk 113 · 4 ROOM · 01 TO 03 · Model A · 59 years left excluded: outlier | 104 sqm | S$730,000 | S$7,019 psm |
| Aug 2026 | Blk 110 · 3 ROOM · 01 TO 03 · Simplified · 59 years left | 70 sqm | S$520,000 | S$7,429 psm |
| Aug 2026 | Blk 129 · 3 ROOM · 04 TO 06 · Simplified · 60 years left | 64 sqm | S$507,000 | S$7,922 psm |
| Jul 2026 | Blk 119 · EXECUTIVE · 13 TO 15 · Apartment · 60 years left | 151 sqm | S$1,410,000 | S$9,338 psm |
| Jul 2026 | Blk 144 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 123 sqm | S$899,999 | S$7,317 psm |
| Jul 2026 | Blk 130 · 4 ROOM · 10 TO 12 · Simplified · 59 years left | 84 sqm | S$655,000 | S$7,798 psm |
| Jul 2026 | Blk 138 · 4 ROOM · 04 TO 06 · Simplified · 60 years left | 84 sqm | S$640,000 | S$7,619 psm |
| Jul 2026 | Blk 122 · 4 ROOM · 01 TO 03 · Simplified · 59 years left | 90 sqm | S$750,000 | S$8,333 psm |
| Jul 2026 | Blk 112 · 4 ROOM · 01 TO 03 · Model A · 58 years left excluded: outlier | 104 sqm | S$710,000 | S$6,827 psm |
| Jul 2026 | Blk 105 · 3 ROOM · 01 TO 03 · Simplified · 59 years left excluded: outlier | 64 sqm | S$480,000 | S$7,500 psm |
| Jun 2026 | Blk 144 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 123 sqm | S$858,888 | S$6,983 psm |
| Jun 2026 | Blk 117 · 5 ROOM · 19 TO 21 · Improved · 60 years left | 121 sqm | S$1,110,000 | S$9,174 psm |
| Jun 2026 | Blk 123 · 4 ROOM · 07 TO 09 · Model A · 59 years left | 105 sqm | S$848,000 | S$8,076 psm |
| Jun 2026 | Blk 110 · 4 ROOM · 01 TO 03 · Model A · 59 years left excluded: outlier | 104 sqm | S$713,888 | S$6,864 psm |
| Jun 2026 | Blk 141 · 4 ROOM · 04 TO 06 · Simplified · 61 years left | 84 sqm | S$650,000 | S$7,738 psm |
| May 2026 | Blk 141 · 5 ROOM · 01 TO 03 · Improved · 61 years left | 122 sqm | S$850,000 | S$6,967 psm |
| May 2026 | Blk 123 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 104 sqm | S$788,000 | S$7,577 psm |
| May 2026 | Blk 131 · 4 ROOM · 07 TO 09 · Simplified · 59 years left | 84 sqm | S$640,000 | S$7,619 psm |
| May 2026 | Blk 113 · 4 ROOM · 10 TO 12 · Model A · 59 years left | 105 sqm | S$850,000 | S$8,095 psm |
| May 2026 | Blk 110 · 3 ROOM · 07 TO 09 · Simplified · 59 years left | 64 sqm | S$530,000 | S$8,281 psm |
| Apr 2026 | Blk 136 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 119 sqm | S$865,000 | S$7,269 psm |
| Apr 2026 | Blk 124 · 5 ROOM · 01 TO 03 · Improved · 60 years left | 121 sqm | S$905,000 | S$7,479 psm |
| Apr 2026 | Blk 122 · 4 ROOM · 10 TO 12 · Simplified · 59 years left | 84 sqm | S$650,000 | S$7,738 psm |
| Apr 2026 | Blk 143 · 4 ROOM · 01 TO 03 · Model A · 61 years left | 104 sqm | S$818,888 | S$7,874 psm |
| Apr 2026 | Blk 130 · 4 ROOM · 04 TO 06 · Model A · 59 years left | 105 sqm | S$850,000 | S$8,095 psm |
| Apr 2026 | Blk 131 · 4 ROOM · 10 TO 12 · Model A · 59 years left | 105 sqm | S$825,000 | S$7,857 psm |
| Apr 2026 | Blk 141 · 4 ROOM · 10 TO 12 · Simplified · 61 years left | 84 sqm | S$650,000 | S$7,738 psm |
| Apr 2026 | Blk 114 · 4 ROOM · 10 TO 12 · Simplified · 59 years left | 84 sqm | S$740,000 | S$8,810 psm |
| Apr 2026 | Blk 110 · 3 ROOM · 07 TO 09 · Simplified · 59 years left | 64 sqm | S$570,000 | S$8,906 psm |
| Apr 2026 | Blk 110 · 3 ROOM · 07 TO 09 · Simplified · 59 years left | 64 sqm | S$538,000 | S$8,406 psm |
| Mar 2026 | Blk 135 · 5 ROOM · 10 TO 12 · Improved · 60 years left | 121 sqm | S$938,000 | S$7,752 psm |
| Mar 2026 | Blk 140 · 5 ROOM · 04 TO 06 · Improved · 62 years left | 128 sqm | S$840,000 | S$6,563 psm |
| Mar 2026 | Blk 133 · 4 ROOM · 04 TO 06 · Simplified · 60 years left | 88 sqm | S$788,000 | S$8,955 psm |
| Mar 2026 | Blk 111 · 4 ROOM · 04 TO 06 · Simplified · 59 years left | 84 sqm | S$765,000 | S$9,107 psm |
| Mar 2026 | Blk 113 · 4 ROOM · 10 TO 12 · Model A · 59 years left | 105 sqm | S$820,000 | S$7,810 psm |
| Mar 2026 | Blk 114 · 4 ROOM · 07 TO 09 · Model A · 59 years left | 104 sqm | S$890,000 | S$8,558 psm |
| Feb 2026 | Blk 102 · 5 ROOM · 10 TO 12 · Improved · 60 years left | 121 sqm | S$940,000 | S$7,769 psm |
| Feb 2026 | Blk 124 · 4 ROOM · 04 TO 06 · Simplified · 60 years left | 83 sqm | S$640,000 | S$7,711 psm |
| Feb 2026 | Blk 106 · 4 ROOM · 04 TO 06 · Simplified · 59 years left | 84 sqm | S$608,000 | S$7,238 psm |
| Feb 2026 | Blk 107 · 4 ROOM · 10 TO 12 · Model A · 59 years left | 104 sqm | S$830,888 | S$7,989 psm |
| Feb 2026 | Blk 108 · 3 ROOM · 04 TO 06 · Simplified · 59 years left | 64 sqm | S$535,000 | S$8,359 psm |
| Jan 2026 | Blk 103 · 5 ROOM · 04 TO 06 · Improved · 60 years left | 121 sqm | S$945,000 | S$7,810 psm |
| Jan 2026 | Blk 113 · 4 ROOM · 07 TO 09 · Simplified · 59 years left | 84 sqm | S$718,888 | S$8,558 psm |
| Jan 2026 | Blk 122 · 4 ROOM · 10 TO 12 · Simplified · 59 years left | 84 sqm | S$718,000 | S$8,548 psm |
| Jan 2026 | Blk 112 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 104 sqm | S$780,000 | S$7,500 psm |
| Dec 2025 | Blk 103 · 5 ROOM · 04 TO 06 · Improved · 60 years left | 121 sqm | S$878,000 | S$7,256 psm |
| Dec 2025 | Blk 124 · 4 ROOM · 10 TO 12 · Simplified · 61 years left | 84 sqm | S$675,000 | S$8,036 psm |
| Dec 2025 | Blk 130 · 4 ROOM · 10 TO 12 · Model A · 59 years left | 105 sqm | S$860,000 | S$8,190 psm |
| Dec 2025 | Blk 127 · 4 ROOM · 10 TO 12 · Simplified · 60 years left | 84 sqm | S$650,000 | S$7,738 psm |
| Dec 2025 | Blk 124 · 4 ROOM · 07 TO 09 · Simplified · 61 years left | 83 sqm | S$720,000 | S$8,675 psm |
| Dec 2025 | Blk 115 · 4 ROOM · 01 TO 03 · Model A · 59 years left | 104 sqm | S$825,000 | S$7,933 psm |
| Dec 2025 | Blk 110 · 3 ROOM · 01 TO 03 · Simplified · 59 years left | 64 sqm | S$520,000 | S$8,125 psm |
| Dec 2025 | Blk 115 · 3 ROOM · 01 TO 03 · Simplified · 59 years left | 64 sqm | S$540,000 | S$8,438 psm |
| Nov 2025 | Blk 135 · EXECUTIVE · 22 TO 24 · Maisonette · 61 years left | 163 sqm | S$1,600,000 | S$9,816 psm |
| Nov 2025 | Blk 118 · 4 ROOM · 01 TO 03 · Simplified · 60 years left | 89 sqm | S$675,000 | S$7,584 psm |
| Nov 2025 | Blk 110 · 3 ROOM · 07 TO 09 · Simplified · 59 years left | 64 sqm | S$578,000 | S$9,031 psm |
| Oct 2025 | Blk 125 · 5 ROOM · 10 TO 12 · Improved · 61 years left | 121 sqm | S$990,000 | S$8,182 psm |
| Oct 2025 | Blk 102 · 5 ROOM · 07 TO 09 · Improved · 60 years left | 121 sqm | S$930,880 | S$7,693 psm |
| Oct 2025 | Blk 142 · 5 ROOM · 07 TO 09 · Improved · 62 years left | 119 sqm | S$900,000 | S$7,563 psm |
| Oct 2025 | Blk 127 · 4 ROOM · 07 TO 09 · Simplified · 60 years left | 84 sqm | S$700,000 | S$8,333 psm |
| Oct 2025 | Blk 115 · 3 ROOM · 04 TO 06 · Simplified · 59 years left | 64 sqm | S$560,000 | S$8,750 psm |
| Sept 2025 | Blk 128 · 5 ROOM · 13 TO 15 · Improved · 60 years left | 121 sqm | S$990,000 | S$8,182 psm |
| Sept 2025 | Blk 113 · 4 ROOM · 07 TO 09 · Simplified · 59 years left | 84 sqm | S$690,000 | S$8,214 psm |
| Sept 2025 | Blk 142 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$728,800 | S$8,676 psm |
| Sept 2025 | Blk 112 · 4 ROOM · 04 TO 06 · Simplified · 59 years left | 84 sqm | S$728,000 | S$8,667 psm |
| Sept 2025 | Blk 106 · 4 ROOM · 04 TO 06 · Model A · 59 years left | 105 sqm | S$818,000 | S$7,790 psm |
| Sept 2025 | Blk 107 · 4 ROOM · 10 TO 12 · Model A · 59 years left | 104 sqm | S$818,000 | S$7,865 psm |
| Aug 2025 | Blk 127 · 5 ROOM · 07 TO 09 · Improved · 60 years left | 132 sqm | S$960,000 | S$7,273 psm |
| Aug 2025 | Blk 117 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 121 sqm | S$968,000 | S$8,000 psm |
| Aug 2025 | Blk 102 · 5 ROOM · 19 TO 21 · Improved · 61 years left | 121 sqm | S$1,020,000 | S$8,430 psm |
| Aug 2025 | Blk 106 · 4 ROOM · 07 TO 09 · Simplified · 59 years left | 84 sqm | S$730,000 | S$8,690 psm |
| Aug 2025 | Blk 125 · 4 ROOM · 04 TO 06 · Simplified · 61 years left | 83 sqm | S$660,000 | S$7,952 psm |
| Aug 2025 | Blk 106 · 4 ROOM · 10 TO 12 · Simplified · 59 years left | 84 sqm | S$743,888 | S$8,856 psm |
| Aug 2025 | Blk 110 · 3 ROOM · 01 TO 03 · Simplified · 60 years left | 64 sqm | S$532,000 | S$8,313 psm |
| Jul 2025 | Blk 128 · 5 ROOM · 13 TO 15 · Improved · 61 years left | 121 sqm | S$1,050,000 | S$8,678 psm |
| Jul 2025 | Blk 102 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 121 sqm | S$890,000 | S$7,355 psm |
| Jul 2025 | Blk 128 · 5 ROOM · 04 TO 06 · Improved · 61 years left | 121 sqm | S$940,000 | S$7,769 psm |
| Jul 2025 | Blk 123 · 4 ROOM · 10 TO 12 · Model A · 60 years left | 104 sqm | S$855,000 | S$8,221 psm |
| Jul 2025 | Blk 123 · 4 ROOM · 04 TO 06 · Simplified · 60 years left | 84 sqm | S$728,000 | S$8,667 psm |
| Jul 2025 | Blk 130 · 4 ROOM · 04 TO 06 · Simplified · 60 years left | 84 sqm | S$640,000 | S$7,619 psm |
| Jul 2025 | Blk 120 · 4 ROOM · 04 TO 06 · Simplified · 60 years left | 91 sqm | S$820,000 | S$9,011 psm |
| Jul 2025 | Blk 111 · 4 ROOM · 07 TO 09 · Model A · 60 years left | 105 sqm | S$880,000 | S$8,381 psm |
| Jul 2025 | Blk 136 · 4 ROOM · 04 TO 06 · Simplified · 61 years left | 84 sqm | S$660,000 | S$7,857 psm |
| Jul 2025 | Blk 115 · 3 ROOM · 04 TO 06 · Simplified · 60 years left | 64 sqm | S$575,000 | S$8,984 psm |
| Jun 2025 | Blk 140 · 5 ROOM · 01 TO 03 · Improved · 62 years left | 128 sqm | S$935,000 | S$7,305 psm |
| Jun 2025 | Blk 135 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 121 sqm | S$978,000 | S$8,083 psm |
| Jun 2025 | Blk 111 · 4 ROOM · 07 TO 09 · Model A · 60 years left | 105 sqm | S$868,000 | S$8,267 psm |
| Jun 2025 | Blk 112 · 4 ROOM · 04 TO 06 · Simplified · 59 years left | 84 sqm | S$756,888 | S$9,011 psm |
| Jun 2025 | Blk 113 · 4 ROOM · 07 TO 09 · Simplified · 60 years left | 84 sqm | S$720,000 | S$8,571 psm |
| Jun 2025 | Blk 144 · 4 ROOM · 07 TO 09 · Model A · 62 years left | 104 sqm | S$810,000 | S$7,788 psm |
| Jun 2025 | Blk 116 · 3 ROOM · 07 TO 09 · Simplified · 60 years left | 64 sqm | S$550,000 | S$8,594 psm |
| Jun 2025 | Blk 116 · 3 ROOM · 01 TO 03 · Simplified · 60 years left | 64 sqm | S$528,000 | S$8,250 psm |
| Jun 2025 | Blk 121 · 3 ROOM · 01 TO 03 · Simplified · 60 years left | 64 sqm | S$550,000 | S$8,594 psm |
| Jun 2025 | Blk 116 · 3 ROOM · 01 TO 03 · Simplified · 60 years left | 70 sqm | S$550,000 | S$7,857 psm |
| Jun 2025 | Blk 108 · 3 ROOM · 01 TO 03 · Simplified · 59 years left | 64 sqm | S$512,000 | S$8,000 psm |
| May 2025 | Blk 137 · MULTI-GENERATION · 10 TO 12 · Multi Generation · 61 years left | 165 sqm | S$1,388,888 | S$8,418 psm |
| May 2025 | Blk 144 · 5 ROOM · 01 TO 03 · Improved · 62 years left | 128 sqm | S$915,000 | S$7,148 psm |
| May 2025 | Blk 111 · 4 ROOM · 01 TO 03 · Model A · 60 years left | 105 sqm | S$852,000 | S$8,114 psm |
| May 2025 | Blk 144 · 4 ROOM · 04 TO 06 · Model A · 62 years left excluded: outlier | 104 sqm | S$680,000 | S$6,538 psm |
| May 2025 | Blk 124 · 4 ROOM · 04 TO 06 · Simplified · 61 years left | 84 sqm | S$670,000 | S$7,976 psm |
| May 2025 | Blk 105 · 4 ROOM · 07 TO 09 · Model A · 60 years left | 104 sqm | S$846,000 | S$8,135 psm |
| May 2025 | Blk 144 · 4 ROOM · 07 TO 09 · Model A · 62 years left | 103 sqm | S$778,000 | S$7,553 psm |
| May 2025 | Blk 115 · 4 ROOM · 04 TO 06 · Model A · 60 years left | 104 sqm | S$888,000 | S$8,538 psm |
| May 2025 | Blk 141 · 4 ROOM · 10 TO 12 · Simplified · 62 years left | 84 sqm | S$670,000 | S$7,976 psm |
| May 2025 | Blk 130 · 4 ROOM · 07 TO 09 · Model A · 60 years left | 104 sqm | S$850,000 | S$8,173 psm |
| May 2025 | Blk 104 · 4 ROOM · 04 TO 06 · Simplified · 60 years left | 84 sqm | S$640,000 | S$7,619 psm |
| May 2025 | Blk 105 · 3 ROOM · 01 TO 03 · Simplified · 60 years left | 64 sqm | S$542,000 | S$8,469 psm |
| May 2025 | Blk 108 · 3 ROOM · 01 TO 03 · Simplified · 60 years left | 64 sqm | S$520,000 | S$8,125 psm |
| Apr 2025 | Blk 138 · 5 ROOM · 01 TO 03 · Improved · 61 years left | 119 sqm | S$810,000 | S$6,807 psm |
| Apr 2025 | Blk 105 · 4 ROOM · 04 TO 06 · Model A · 60 years left | 104 sqm | S$850,000 | S$8,173 psm |
| Apr 2025 | Blk 104 · 3 ROOM · 01 TO 03 · Simplified · 60 years left | 64 sqm | S$525,000 | S$8,203 psm |
| Apr 2025 | Blk 110 · 3 ROOM · 04 TO 06 · Simplified · 60 years left | 64 sqm | S$548,000 | S$8,563 psm |
| Mar 2025 | Blk 135 · EXECUTIVE · 22 TO 24 · Maisonette · 61 years left | 163 sqm | S$1,500,000 | S$9,202 psm |
| Mar 2025 | Blk 138 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 119 sqm | S$980,000 | S$8,235 psm |
| Mar 2025 | Blk 126 · 5 ROOM · 07 TO 09 · Improved · 62 years left | 121 sqm | S$935,000 | S$7,727 psm |
| Mar 2025 | Blk 138 · 4 ROOM · 07 TO 09 · Simplified · 61 years left | 84 sqm | S$670,000 | S$7,976 psm |
| Mar 2025 | Blk 126 · 4 ROOM · 10 TO 12 · Simplified · 61 years left | 83 sqm | S$650,000 | S$7,831 psm |
| Feb 2025 | Blk 135 · 5 ROOM · 19 TO 21 · Improved · 61 years left | 121 sqm | S$988,000 | S$8,165 psm |
| Jan 2025 | Blk 110 · 4 ROOM · 07 TO 09 · Simplified · 60 years left | 84 sqm | S$730,000 | S$8,690 psm |
| Jan 2025 | Blk 110 · 4 ROOM · 07 TO 09 · Model A · 60 years left | 104 sqm | S$848,000 | S$8,154 psm |
| Jan 2025 | Blk 121 · 4 ROOM · 01 TO 03 · Simplified · 61 years left | 91 sqm | S$740,000 | S$8,132 psm |
| Jan 2025 | Blk 124 · 4 ROOM · 01 TO 03 · Simplified · 62 years left | 84 sqm | S$630,000 | S$7,500 psm |
| Jan 2025 | Blk 131 · 4 ROOM · 07 TO 09 · Simplified · 60 years left | 84 sqm | S$680,000 | S$8,095 psm |
| Dec 2024 | Blk 101 · 5 ROOM · 10 TO 12 · Improved · 61 years left | 121 sqm | S$928,000 | S$7,669 psm |
| Dec 2024 | Blk 102 · 5 ROOM · 01 TO 03 · Improved · 61 years left | 121 sqm | S$900,000 | S$7,438 psm |
| Dec 2024 | Blk 105 · 4 ROOM · 01 TO 03 · Model A · 60 years left | 104 sqm | S$845,000 | S$8,125 psm |
| Dec 2024 | Blk 123 · 4 ROOM · 10 TO 12 · Simplified · 60 years left | 84 sqm | S$734,800 | S$8,748 psm |
| Dec 2024 | Blk 138 · 4 ROOM · 01 TO 03 · Simplified · 62 years left | 84 sqm | S$600,000 | S$7,143 psm |
| Dec 2024 | Blk 105 · 3 ROOM · 01 TO 03 · Simplified · 60 years left | 70 sqm | S$510,000 | S$7,286 psm |
| Nov 2024 | Blk 131 · 4 ROOM · 13 TO 15 · Simplified · 60 years left | 84 sqm | S$680,000 | S$8,095 psm |
| Nov 2024 | Blk 109 · 4 ROOM · 01 TO 03 · Simplified · 60 years left | 84 sqm | S$648,000 | S$7,714 psm |
| Nov 2024 | Blk 131 · 4 ROOM · 13 TO 15 · Simplified · 60 years left | 84 sqm | S$638,000 | S$7,595 psm |
| Nov 2024 | Blk 131 · 4 ROOM · 01 TO 03 · Simplified · 60 years left | 84 sqm | S$600,000 | S$7,143 psm |
| Oct 2024 | Blk 103 · EXECUTIVE · 22 TO 24 · Maisonette · 61 years left | 163 sqm | S$1,410,000 | S$8,650 psm |
| Oct 2024 | Blk 111 · 4 ROOM · 04 TO 06 · Simplified · 60 years left | 84 sqm | S$748,000 | S$8,905 psm |
| Oct 2024 | Blk 109 · 4 ROOM · 10 TO 12 · Simplified · 60 years left | 84 sqm | S$730,000 | S$8,690 psm |
| Oct 2024 | Blk 124 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 83 sqm | S$716,000 | S$8,627 psm |
| Oct 2024 | Blk 131 · 4 ROOM · 04 TO 06 · Simplified · 60 years left | 84 sqm | S$610,000 | S$7,262 psm |
| Sept 2024 | Blk 141 · 5 ROOM · 10 TO 12 · Improved · 63 years left | 130 sqm | S$920,000 | S$7,077 psm |
| Sept 2024 | Blk 112 · 4 ROOM · 04 TO 06 · Simplified · 60 years left | 84 sqm | S$662,000 | S$7,881 psm |
| Sept 2024 | Blk 121 · 3 ROOM · 01 TO 03 · Simplified · 61 years left | 64 sqm | S$503,000 | S$7,859 psm |
| Aug 2024 | Blk 138 · 5 ROOM · 07 TO 09 · Improved · 62 years left | 122 sqm | S$950,000 | S$7,787 psm |
| Aug 2024 | Blk 113 · 4 ROOM · 10 TO 12 · Simplified · 61 years left | 84 sqm | S$745,000 | S$8,869 psm |
| Aug 2024 | Blk 115 · 3 ROOM · 01 TO 03 · Simplified · 61 years left | 64 sqm | S$540,000 | S$8,438 psm |
| Jul 2024 | Blk 103 · 5 ROOM · 19 TO 21 · Improved · 62 years left | 121 sqm | S$998,000 | S$8,248 psm |
| Jul 2024 | Blk 103 · 5 ROOM · 07 TO 09 · Improved · 61 years left | 121 sqm | S$935,000 | S$7,727 psm |
| Jul 2024 | Blk 141 · 5 ROOM · 10 TO 12 · Improved · 63 years left | 122 sqm | S$870,000 | S$7,131 psm |
| Jul 2024 | Blk 140 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 123 sqm | S$810,000 | S$6,585 psm |
| Jul 2024 | Blk 103 · 5 ROOM · 01 TO 03 · Improved · 61 years left | 121 sqm | S$720,000 | S$5,950 psm |
| Jul 2024 | Blk 126 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 83 sqm | S$655,000 | S$7,892 psm |
| Jul 2024 | Blk 130 · 4 ROOM · 04 TO 06 · Simplified · 61 years left | 84 sqm | S$645,000 | S$7,679 psm |
| Jul 2024 | Blk 113 · 4 ROOM · 01 TO 03 · Simplified · 61 years left | 84 sqm | S$618,000 | S$7,357 psm |
| Jul 2024 | Blk 115 · 3 ROOM · 04 TO 06 · Simplified · 61 years left | 64 sqm | S$540,000 | S$8,438 psm |
| Jul 2024 | Blk 115 · 3 ROOM · 07 TO 09 · Simplified · 61 years left | 64 sqm | S$520,000 | S$8,125 psm |
| Jun 2024 | Blk 114 · 4 ROOM · 10 TO 12 · Model A · 61 years left | 105 sqm | S$813,000 | S$7,743 psm |
| Jun 2024 | Blk 131 · 4 ROOM · 13 TO 15 · Model A · 61 years left | 104 sqm | S$790,000 | S$7,596 psm |
| Jun 2024 | Blk 114 · 4 ROOM · 01 TO 03 · Simplified · 61 years left | 84 sqm | S$668,000 | S$7,952 psm |
| Jun 2024 | Blk 132 · 3 ROOM · 01 TO 03 · Simplified · 62 years left | 64 sqm | S$505,000 | S$7,891 psm |
| Jun 2024 | Blk 116 · 3 ROOM · 01 TO 03 · Simplified · 61 years left | 64 sqm | S$468,000 | S$7,313 psm |
| May 2024 | Blk 112 · 4 ROOM · 04 TO 06 · Simplified · 60 years left | 84 sqm | S$676,000 | S$8,048 psm |
| May 2024 | Blk 109 · 4 ROOM · 04 TO 06 · Simplified · 61 years left | 84 sqm | S$645,000 | S$7,679 psm |
| May 2024 | Blk 131 · 4 ROOM · 10 TO 12 · Simplified · 61 years left | 84 sqm | S$640,000 | S$7,619 psm |
| May 2024 | Blk 116 · 3 ROOM · 07 TO 09 · Simplified · 61 years left | 64 sqm | S$560,000 | S$8,750 psm |
| May 2024 | Blk 121 · 3 ROOM · 04 TO 06 · Simplified · 61 years left | 64 sqm | S$470,000 | S$7,344 psm |
| Apr 2024 | Blk 124 · 5 ROOM · 07 TO 09 · Improved · 62 years left | 121 sqm | S$938,000 | S$7,752 psm |
| Apr 2024 | Blk 115 · 4 ROOM · 04 TO 06 · Model A · 61 years left | 104 sqm | S$780,000 | S$7,500 psm |
| Apr 2024 | Blk 109 · 4 ROOM · 13 TO 15 · Simplified · 61 years left | 84 sqm | S$718,000 | S$8,548 psm |
| Apr 2024 | Blk 131 · 4 ROOM · 01 TO 03 · Model A · 61 years left | 104 sqm | S$580,000 | S$5,577 psm |
| Mar 2024 | Blk 102 · 5 ROOM · 19 TO 21 · Improved · 62 years left | 121 sqm | S$950,000 | S$7,851 psm |
| Mar 2024 | Blk 136 · 5 ROOM · 04 TO 06 · Improved · 63 years left | 122 sqm | S$860,000 | S$7,049 psm |
| Mar 2024 | Blk 138 · 4 ROOM · 07 TO 09 · Model A · 62 years left | 103 sqm | S$688,000 | S$6,680 psm |
| Feb 2024 | Blk 140 · 5 ROOM · 07 TO 09 · Improved · 64 years left | 123 sqm | S$850,000 | S$6,911 psm |
| Feb 2024 | Blk 109 · 4 ROOM · 13 TO 15 · Model A · 61 years left | 104 sqm | S$705,000 | S$6,779 psm |
| Feb 2024 | Blk 130 · 4 ROOM · 13 TO 15 · Simplified · 61 years left | 84 sqm | S$700,000 | S$8,333 psm |
| Jan 2024 | Blk 102 · EXECUTIVE · 22 TO 24 · Maisonette · 62 years left | 163 sqm | S$1,380,000 | S$8,466 psm |
| Jan 2024 | Blk 128 · EXECUTIVE · 22 TO 24 · Maisonette · 62 years left | 150 sqm | S$1,290,000 | S$8,600 psm |
| Jan 2024 | Blk 106 · 4 ROOM · 07 TO 09 · Model A · 61 years left | 105 sqm | S$660,000 | S$6,286 psm |
| Jan 2024 | Blk 127 · 4 ROOM · 01 TO 03 · Simplified · 62 years left | 83 sqm | S$613,000 | S$7,386 psm |
| Jan 2024 | Blk 131 · 4 ROOM · 04 TO 06 · Simplified · 61 years left | 84 sqm | S$605,000 | S$7,202 psm |
| Dec 2023 | Blk 134 · EXECUTIVE · 04 TO 06 · Apartment · 62 years left | 144 sqm | S$1,188,888 | S$8,256 psm |
| Dec 2023 | Blk 117 · 5 ROOM · 10 TO 12 · Improved · 63 years left | 121 sqm | S$958,000 | S$7,917 psm |
| Dec 2023 | Blk 114 · 4 ROOM · 07 TO 09 · Model A · 61 years left | 104 sqm | S$780,000 | S$7,500 psm |
| Dec 2023 | Blk 140 · 4 ROOM · 04 TO 06 · Model A · 64 years left excluded: outlier | 104 sqm | S$585,000 | S$5,625 psm |
| Dec 2023 | Blk 106 · 4 ROOM · 04 TO 06 · Simplified · 61 years left | 84 sqm | S$570,000 | S$6,786 psm |
| Nov 2023 | Blk 135 · 5 ROOM · 16 TO 18 · Improved · 63 years left | 121 sqm | S$855,000 | S$7,066 psm |
| Nov 2023 | Blk 139 · 4 ROOM · 01 TO 03 · Model A · 64 years left excluded: outlier | 108 sqm | S$677,000 | S$6,269 psm |
| Nov 2023 | Blk 115 · 4 ROOM · 07 TO 09 · Simplified · 61 years left | 84 sqm | S$650,000 | S$7,738 psm |
| Nov 2023 | Blk 115 · 3 ROOM · 01 TO 03 · Simplified · 61 years left | 70 sqm | S$510,000 | S$7,286 psm |
| Nov 2023 | Blk 116 · 3 ROOM · 01 TO 03 · Simplified · 61 years left | 64 sqm | S$465,000 | S$7,266 psm |
| Oct 2023 | Blk 119 · EXECUTIVE · 10 TO 12 · Apartment · 63 years left | 144 sqm | S$1,120,000 | S$7,778 psm |
| Oct 2023 | Blk 125 · 5 ROOM · 07 TO 09 · Improved · 63 years left | 121 sqm | S$890,000 | S$7,355 psm |
| Oct 2023 | Blk 144 · 5 ROOM · 01 TO 03 · Improved · 64 years left | 123 sqm | S$800,000 | S$6,504 psm |
| Oct 2023 | Blk 127 · 4 ROOM · 10 TO 12 · Simplified · 62 years left | 83 sqm | S$655,000 | S$7,892 psm |
| Oct 2023 | Blk 113 · 4 ROOM · 07 TO 09 · Simplified · 61 years left | 84 sqm | S$651,000 | S$7,750 psm |
| Oct 2023 | Blk 126 · 4 ROOM · 04 TO 06 · Simplified · 63 years left | 83 sqm | S$613,888 | S$7,396 psm |
| Oct 2023 | Blk 120 · 3 ROOM · 01 TO 03 · Simplified · 62 years left | 70 sqm | S$493,000 | S$7,043 psm |
| Sept 2023 | Blk 127 · 5 ROOM · 10 TO 12 · Improved · 62 years left | 132 sqm | S$900,000 | S$6,818 psm |
| Sept 2023 | Blk 142 · 5 ROOM · 07 TO 09 · Improved · 64 years left | 122 sqm | S$820,000 | S$6,721 psm |
| Sept 2023 | Blk 110 · 4 ROOM · 07 TO 09 · Model A · 62 years left | 104 sqm | S$710,000 | S$6,827 psm |
| Sept 2023 | Blk 144 · 4 ROOM · 07 TO 09 · Model A · 64 years left | 104 sqm | S$665,000 | S$6,394 psm |
| Sept 2023 | Blk 105 · 3 ROOM · 07 TO 09 · Simplified · 61 years left | 64 sqm | S$478,888 | S$7,483 psm |
| Aug 2023 | Blk 119 · EXECUTIVE · 10 TO 12 · Maisonette · 63 years left | 143 sqm | S$1,150,000 | S$8,042 psm |
| Aug 2023 | Blk 124 · 5 ROOM · 10 TO 12 · Improved · 63 years left | 121 sqm | S$998,000 | S$8,248 psm |
| Aug 2023 | Blk 106 · 4 ROOM · 10 TO 12 · Model A · 61 years left | 104 sqm | S$750,000 | S$7,212 psm |
| Aug 2023 | Blk 141 · 5 ROOM · 04 TO 06 · Improved · 64 years left | 122 sqm | S$720,000 | S$5,902 psm |
| Aug 2023 | Blk 136 · 4 ROOM · 01 TO 03 · Simplified · 63 years left excluded: outlier | 84 sqm | S$470,000 | S$5,595 psm |
| Jul 2023 | Blk 119 · EXECUTIVE · 07 TO 09 · Apartment · 63 years left | 144 sqm | S$1,088,000 | S$7,556 psm |
| Jul 2023 | Blk 103 · 5 ROOM · 04 TO 06 · Improved · 62 years left | 121 sqm | S$825,000 | S$6,818 psm |
| Jul 2023 | Blk 111 · 4 ROOM · 04 TO 06 · Model A · 62 years left | 105 sqm | S$725,000 | S$6,905 psm |
| Jul 2023 | Blk 115 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$612,888 | S$7,296 psm |
| Jun 2023 | Blk 130 · 4 ROOM · 13 TO 15 · Model A · 62 years left | 105 sqm | S$740,000 | S$7,048 psm |
| Jun 2023 | Blk 140 · 5 ROOM · 01 TO 03 · Improved · 64 years left | 123 sqm | S$740,000 | S$6,016 psm |
| Jun 2023 | Blk 144 · 4 ROOM · 01 TO 03 · Model A · 64 years left | 103 sqm | S$680,000 | S$6,602 psm |
| Jun 2023 | Blk 112 · 4 ROOM · 04 TO 06 · Simplified · 61 years left | 84 sqm | S$625,000 | S$7,440 psm |
| May 2023 | Blk 102 · 5 ROOM · 16 TO 18 · Improved · 63 years left | 121 sqm | S$928,000 | S$7,669 psm |
| May 2023 | Blk 103 · 5 ROOM · 10 TO 12 · Improved · 63 years left | 121 sqm | S$880,000 | S$7,273 psm |
| May 2023 | Blk 140 · 5 ROOM · 07 TO 09 · Improved · 64 years left | 123 sqm | S$842,000 | S$6,846 psm |
| May 2023 | Blk 101 · 5 ROOM · 07 TO 09 · Improved · 63 years left | 121 sqm | S$810,000 | S$6,694 psm |
| May 2023 | Blk 106 · 4 ROOM · 07 TO 09 · Model A · 62 years left | 104 sqm | S$750,000 | S$7,212 psm |
| May 2023 | Blk 116 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 89 sqm | S$698,000 | S$7,843 psm |
| May 2023 | Blk 116 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 89 sqm | S$670,000 | S$7,528 psm |
| May 2023 | Blk 141 · 5 ROOM · 04 TO 06 · Improved · 64 years left excluded: outlier | 122 sqm | S$635,000 | S$5,205 psm |
| May 2023 | Blk 138 · 4 ROOM · 04 TO 06 · Model A · 63 years left | 103 sqm | S$635,000 | S$6,165 psm |
| May 2023 | Blk 110 · 4 ROOM · 01 TO 03 · Model A · 62 years left excluded: outlier | 104 sqm | S$605,000 | S$5,817 psm |
| May 2023 | Blk 132 · 3 ROOM · 01 TO 03 · Simplified · 63 years left | 64 sqm | S$488,000 | S$7,625 psm |
| May 2023 | Blk 116 · 3 ROOM · 04 TO 06 · Simplified · 62 years left | 64 sqm | S$462,888 | S$7,233 psm |
| Apr 2023 | Blk 135 · EXECUTIVE · 22 TO 24 · Maisonette · 63 years left | 163 sqm | S$1,270,000 | S$7,791 psm |
| Apr 2023 | Blk 117 · 5 ROOM · 04 TO 06 · Improved · 63 years left | 121 sqm | S$838,000 | S$6,926 psm |
| Apr 2023 | Blk 123 · 4 ROOM · 04 TO 06 · Model A · 62 years left | 105 sqm | S$760,000 | S$7,238 psm |
| Apr 2023 | Blk 107 · 4 ROOM · 07 TO 09 · Model A · 62 years left | 104 sqm | S$728,000 | S$7,000 psm |
| Apr 2023 | Blk 106 · 4 ROOM · 01 TO 03 · Simplified · 62 years left | 84 sqm | S$530,000 | S$6,310 psm |
| Mar 2023 | Blk 126 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 121 sqm | S$776,000 | S$6,413 psm |
| Mar 2023 | Blk 111 · 4 ROOM · 01 TO 03 · Model A · 62 years left | 104 sqm | S$699,000 | S$6,721 psm |
| Mar 2023 | Blk 122 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$583,888 | S$6,951 psm |
| Mar 2023 | Blk 105 · 3 ROOM · 04 TO 06 · Simplified · 62 years left | 64 sqm | S$475,000 | S$7,422 psm |
| Feb 2023 | Blk 111 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 90 sqm | S$652,888 | S$7,254 psm |
| Feb 2023 | Blk 115 · 4 ROOM · 07 TO 09 · Simplified · 62 years left | 84 sqm | S$626,000 | S$7,452 psm |
| Feb 2023 | Blk 131 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$605,000 | S$7,202 psm |
| Jan 2023 | Blk 103 · 5 ROOM · 07 TO 09 · Improved · 63 years left | 121 sqm | S$890,000 | S$7,355 psm |
| Jan 2023 | Blk 123 · 4 ROOM · 01 TO 03 · Model A · 62 years left | 105 sqm | S$685,000 | S$6,524 psm |
| Jan 2023 | Blk 113 · 4 ROOM · 10 TO 12 · Simplified · 62 years left | 84 sqm | S$630,000 | S$7,500 psm |
| Jan 2023 | Blk 115 · 3 ROOM · 07 TO 09 · Simplified · 62 years left | 64 sqm | S$508,000 | S$7,938 psm |
| Dec 2022 | Blk 111 · 4 ROOM · 10 TO 12 · Model A · 62 years left | 104 sqm | S$725,000 | S$6,971 psm |
| Dec 2022 | Blk 122 · 4 ROOM · 01 TO 03 · Model A · 62 years left | 104 sqm | S$660,000 | S$6,346 psm |
| Dec 2022 | Blk 131 · 4 ROOM · 13 TO 15 · Simplified · 62 years left | 84 sqm | S$598,000 | S$7,119 psm |
| Dec 2022 | Blk 126 · 4 ROOM · 04 TO 06 · Simplified · 64 years left | 84 sqm | S$560,000 | S$6,667 psm |
| Dec 2022 | Blk 116 · 3 ROOM · 07 TO 09 · Simplified · 62 years left | 64 sqm | S$460,000 | S$7,188 psm |
| Nov 2022 | Blk 117 · 5 ROOM · 07 TO 09 · Improved · 64 years left | 121 sqm | S$805,000 | S$6,653 psm |
| Nov 2022 | Blk 111 · 4 ROOM · 07 TO 09 · Model A · 62 years left | 104 sqm | S$742,000 | S$7,135 psm |
| Nov 2022 | Blk 123 · 4 ROOM · 10 TO 12 · Simplified · 62 years left | 90 sqm | S$635,000 | S$7,056 psm |
| Nov 2022 | Blk 106 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$560,000 | S$6,667 psm |
| Nov 2022 | Blk 116 · 3 ROOM · 07 TO 09 · Simplified · 62 years left | 64 sqm | S$488,000 | S$7,625 psm |
| Oct 2022 | Blk 101 · 5 ROOM · 22 TO 24 · Improved · 63 years left | 121 sqm | S$880,000 | S$7,273 psm |
| Oct 2022 | Blk 103 · 5 ROOM · 01 TO 03 · Improved · 63 years left | 121 sqm | S$775,000 | S$6,405 psm |
| Oct 2022 | Blk 122 · 4 ROOM · 04 TO 06 · Model A · 62 years left | 105 sqm | S$738,000 | S$7,029 psm |
| Oct 2022 | Blk 138 · 5 ROOM · 07 TO 09 · Improved · 64 years left | 121 sqm | S$710,000 | S$5,868 psm |
| Oct 2022 | Blk 144 · 4 ROOM · 07 TO 09 · Model A · 65 years left | 104 sqm | S$648,000 | S$6,231 psm |
| Oct 2022 | Blk 112 · 4 ROOM · 01 TO 03 · Model A · 62 years left | 104 sqm | S$643,888 | S$6,191 psm |
| Oct 2022 | Blk 122 · 4 ROOM · 10 TO 12 · Simplified · 62 years left | 84 sqm | S$617,000 | S$7,345 psm |
| Oct 2022 | Blk 140 · 4 ROOM · 04 TO 06 · Model A · 65 years left | 103 sqm | S$595,000 | S$5,777 psm |
| Sept 2022 | Blk 134 · EXECUTIVE · 04 TO 06 · Maisonette · 63 years left | 143 sqm | S$1,030,000 | S$7,203 psm |
| Sept 2022 | Blk 135 · 5 ROOM · 13 TO 15 · Improved · 64 years left | 121 sqm | S$850,000 | S$7,025 psm |
| Sept 2022 | Blk 135 · 5 ROOM · 13 TO 15 · Improved · 64 years left | 121 sqm | S$840,000 | S$6,942 psm |
| Sept 2022 | Blk 102 · 5 ROOM · 16 TO 18 · Improved · 63 years left | 121 sqm | S$799,000 | S$6,603 psm |
| Sept 2022 | Blk 144 · 4 ROOM · 04 TO 06 · Model A · 65 years left | 104 sqm | S$600,000 | S$5,769 psm |
| Sept 2022 | Blk 109 · 4 ROOM · 04 TO 06 · Simplified · 62 years left | 84 sqm | S$540,000 | S$6,429 psm |
| Sept 2022 | Blk 123 · 4 ROOM · 01 TO 03 · Simplified · 63 years left | 84 sqm | S$525,000 | S$6,250 psm |
| Sept 2022 | Blk 105 · 3 ROOM · 04 TO 06 · Simplified · 62 years left | 64 sqm | S$438,000 | S$6,844 psm |
| Aug 2022 | Blk 103 · 5 ROOM · 10 TO 12 · Improved · 63 years left | 121 sqm | S$888,000 | S$7,339 psm |
| Aug 2022 | Blk 125 · 5 ROOM · 07 TO 09 · Improved · 64 years left | 121 sqm | S$838,000 | S$6,926 psm |
| Aug 2022 | Blk 126 · 5 ROOM · 01 TO 03 · Improved · 64 years left | 121 sqm | S$746,000 | S$6,165 psm |
| Aug 2022 | Blk 113 · 4 ROOM · 10 TO 12 · Simplified · 63 years left | 84 sqm | S$590,000 | S$7,024 psm |
| Jul 2022 | Blk 119 · EXECUTIVE · 04 TO 06 · Maisonette · 64 years left | 143 sqm | S$1,030,000 | S$7,203 psm |
| Jul 2022 | Blk 128 · 5 ROOM · 19 TO 21 · Improved · 64 years left | 121 sqm | S$870,000 | S$7,190 psm |
Showing 300 of 1814.
Sale prices as filed in caveats.
| Period | Detail | Monthly rent | Per area |
|---|---|---|---|
| Sept 2026 | Blk 126 · 5 ROOM | S$4,200 | — |
| Sept 2026 | Blk 101 · 5 ROOM | S$4,200 | — |
| Sept 2026 | Blk 107 · 4 ROOM | S$4,100 | — |
| Sept 2026 | Blk 109 · 4 ROOM | S$4,100 | — |
| Sept 2026 | Blk 124 · 4 ROOM | S$4,100 | — |
| Sept 2026 | Blk 114 · 4 ROOM | S$3,800 | — |
| Sept 2026 | Blk 125 · 4 ROOM | S$3,700 | — |
| Sept 2026 | Blk 127 · 4 ROOM | S$3,690 | — |
| Sept 2026 | Blk 130 · 4 ROOM | S$3,600 | — |
| Sept 2026 | Blk 110 · 3 ROOM | S$3,500 | — |
| Sept 2026 | Blk 115 · 3 ROOM | S$3,300 | — |
| Sept 2026 | Blk 105 · 3 ROOM | S$3,250 | — |
| Sept 2026 | Blk 109 · 4 ROOM | S$3,000 | — |
| Sept 2026 | Blk 116 · 3 ROOM | S$2,600 | — |
| Sept 2026 | Blk 123 · 4 ROOM | S$2,500 | — |
| Aug 2026 | Blk 117 · 5 ROOM | S$4,400 | — |
| Aug 2026 | Blk 135 · 5 ROOM | S$4,300 | — |
| Aug 2026 | Blk 117 · 5 ROOM | S$4,200 | — |
| Aug 2026 | Blk 127 · 4 ROOM | S$4,050 | — |
| Aug 2026 | Blk 130 · 4 ROOM | S$4,000 | — |
| Aug 2026 | Blk 128 · 5 ROOM | S$3,800 | — |
| Aug 2026 | Blk 112 · 4 ROOM | S$3,800 | — |
| Aug 2026 | Blk 109 · 4 ROOM | S$3,800 | — |
| Aug 2026 | Blk 114 · 4 ROOM | S$3,750 | — |
| Aug 2026 | Blk 110 · 3 ROOM | S$3,600 | — |
| Aug 2026 | Blk 109 · 4 ROOM | S$3,500 | — |
| Aug 2026 | Blk 142 · 4 ROOM | S$3,500 | — |
| Aug 2026 | Blk 128 · 5 ROOM | S$3,100 | — |
| Aug 2026 | Blk 115 · 3 ROOM | S$3,050 | — |
| Jul 2026 | Blk 117 · 5 ROOM | S$4,000 | — |
| Jul 2026 | Blk 105 · 4 ROOM | S$3,800 | — |
| Jul 2026 | Blk 136 · 4 ROOM | S$3,000 | — |
| Jul 2026 | Blk 132 · 3 ROOM | S$2,900 | — |
| Jul 2026 | Blk 115 · 3 ROOM | S$2,800 | — |
| Jul 2026 | Blk 133 · 3 ROOM | S$2,700 | — |
| Jun 2026 | Blk 128 · 5 ROOM | S$4,050 | — |
| Jun 2026 | Blk 124 · 4 ROOM | S$4,050 | — |
| Jun 2026 | Blk 126 · 5 ROOM | S$4,000 | — |
| Jun 2026 | Blk 123 · 4 ROOM | S$4,000 | — |
| Jun 2026 | Blk 144 · 4 ROOM | S$3,500 | — |
| Jun 2026 | Blk 136 · 5 ROOM | S$3,500 | — |
| Jun 2026 | Blk 107 · 4 ROOM | S$3,500 | — |
| Jun 2026 | Blk 110 · 3 ROOM | S$3,400 | — |
| Jun 2026 | Blk 105 · 3 ROOM | S$3,000 | — |
| Jun 2026 | Blk 116 · 3 ROOM | S$3,000 | — |
| May 2026 | Blk 135 · 5 ROOM | S$4,700 | — |
| May 2026 | Blk 132 · 4 ROOM | S$4,300 | — |
| May 2026 | Blk 122 · 4 ROOM | S$4,000 | — |
| May 2026 | Blk 121 · 4 ROOM | S$4,000 | — |
| May 2026 | Blk 123 · 4 ROOM | S$3,900 | — |
| May 2026 | Blk 112 · 4 ROOM | S$3,900 | — |
| May 2026 | Blk 141 · 5 ROOM | S$3,800 | — |
| May 2026 | Blk 114 · 4 ROOM | S$3,800 | — |
| May 2026 | Blk 116 · 4 ROOM | S$3,800 | — |
| May 2026 | Blk 116 · 4 ROOM | S$3,700 | — |
| May 2026 | Blk 109 · 4 ROOM | S$3,700 | — |
| May 2026 | Blk 102 · 5 ROOM | S$3,600 | — |
| May 2026 | Blk 116 · 3 ROOM | S$3,500 | — |
| May 2026 | Blk 112 · 4 ROOM | S$3,500 | — |
| May 2026 | Blk 120 · 3 ROOM | S$2,900 | — |
| May 2026 | Blk 120 · 3 ROOM | S$2,600 | — |
| Apr 2026 | Blk 135 · EXECUTIVE | S$4,800 | — |
| Apr 2026 | Blk 141 · 5 ROOM | S$4,100 | — |
| Apr 2026 | Blk 101 · 5 ROOM | S$4,000 | — |
| Apr 2026 | Blk 113 · 4 ROOM | S$3,800 | — |
| Apr 2026 | Blk 144 · 5 ROOM | S$3,750 | — |
| Apr 2026 | Blk 112 · 4 ROOM | S$3,750 | — |
| Apr 2026 | Blk 128 · 5 ROOM | S$3,700 | — |
| Apr 2026 | Blk 135 · 5 ROOM | S$3,650 | — |
| Apr 2026 | Blk 142 · 4 ROOM | S$3,500 | — |
| Apr 2026 | Blk 115 · 3 ROOM | S$2,800 | — |
| Apr 2026 | Blk 137 · EXECUTIVE | S$2,800 | — |
| Apr 2026 | Blk 104 · 3 ROOM | S$2,300 | — |
| Mar 2026 | Blk 127 · 5 ROOM | S$4,500 | — |
| Mar 2026 | Blk 125 · 4 ROOM | S$3,800 | — |
| Mar 2026 | Blk 111 · 4 ROOM | S$3,800 | — |
| Mar 2026 | Blk 114 · 4 ROOM | S$3,800 | — |
| Mar 2026 | Blk 142 · 4 ROOM | S$3,700 | — |
| Mar 2026 | Blk 138 · 4 ROOM | S$3,500 | — |
| Mar 2026 | Blk 116 · 3 ROOM | S$3,330 | — |
| Mar 2026 | Blk 131 · 4 ROOM | S$3,200 | — |
| Mar 2026 | Blk 116 · 3 ROOM | S$3,200 | — |
| Mar 2026 | Blk 120 · 3 ROOM | S$3,100 | — |
| Mar 2026 | Blk 122 · 4 ROOM | S$3,000 | — |
| Mar 2026 | Blk 101 · 5 ROOM | S$2,650 | — |
| Mar 2026 | Blk 114 · 4 ROOM | S$2,400 | — |
| Mar 2026 | Blk 144 · 5 ROOM | S$2,000 | — |
| Feb 2026 | Blk 117 · 5 ROOM | S$4,500 | — |
| Feb 2026 | Blk 142 · 5 ROOM | S$4,000 | — |
| Feb 2026 | Blk 125 · 5 ROOM | S$3,900 | — |
| Feb 2026 | Blk 114 · 4 ROOM | S$3,800 | — |
| Feb 2026 | Blk 101 · 5 ROOM | S$3,800 | — |
| Feb 2026 | Blk 135 · 5 ROOM | S$3,800 | — |
| Feb 2026 | Blk 112 · 4 ROOM | S$3,700 | — |
| Feb 2026 | Blk 130 · 4 ROOM | S$3,500 | — |
| Feb 2026 | Blk 141 · 4 ROOM | S$3,300 | — |
| Jan 2026 | Blk 103 · EXECUTIVE | S$5,000 | — |
| Jan 2026 | Blk 114 · 4 ROOM | S$4,100 | — |
| Jan 2026 | Blk 101 · 5 ROOM | S$4,000 | — |
| Jan 2026 | Blk 113 · 4 ROOM | S$4,000 | — |
| Jan 2026 | Blk 116 · 4 ROOM | S$4,000 | — |
| Jan 2026 | Blk 126 · 4 ROOM | S$3,800 | — |
| Jan 2026 | Blk 105 · 4 ROOM | S$3,600 | — |
| Jan 2026 | Blk 105 · 3 ROOM | S$3,100 | — |
| Jan 2026 | Blk 114 · 4 ROOM | S$2,800 | — |
| Dec 2025 | Blk 142 · 5 ROOM | S$4,850 | — |
| Dec 2025 | Blk 138 · 5 ROOM | S$4,700 | — |
| Dec 2025 | Blk 144 · 5 ROOM | S$4,200 | — |
| Dec 2025 | Blk 102 · 5 ROOM | S$4,000 | — |
| Dec 2025 | Blk 128 · 5 ROOM | S$3,750 | — |
| Dec 2025 | Blk 107 · 4 ROOM | S$3,500 | — |
| Dec 2025 | Blk 110 · 3 ROOM | S$3,500 | — |
| Dec 2025 | Blk 130 · 4 ROOM | S$3,400 | — |
| Dec 2025 | Blk 110 · 3 ROOM | S$3,300 | — |
| Dec 2025 | Blk 105 · 3 ROOM | S$3,300 | — |
| Dec 2025 | Blk 115 · 3 ROOM | S$3,000 | — |
| Dec 2025 | Blk 110 · 3 ROOM | S$3,000 | — |
| Dec 2025 | Blk 132 · 3 ROOM | S$2,800 | — |
| Dec 2025 | Blk 107 · 4 ROOM | S$2,200 | — |
| Nov 2025 | Blk 144 · 5 ROOM | S$4,200 | — |
| Nov 2025 | Blk 117 · 5 ROOM | S$4,200 | — |
| Nov 2025 | Blk 138 · 5 ROOM | S$4,150 | — |
| Nov 2025 | Blk 124 · 4 ROOM | S$3,900 | — |
| Nov 2025 | Blk 114 · 4 ROOM | S$3,850 | — |
| Nov 2025 | Blk 110 · 4 ROOM | S$3,700 | — |
| Nov 2025 | Blk 122 · 4 ROOM | S$3,700 | — |
| Nov 2025 | Blk 111 · 4 ROOM | S$3,600 | — |
| Nov 2025 | Blk 111 · 4 ROOM | S$3,600 | — |
| Nov 2025 | Blk 122 · 4 ROOM | S$3,500 | — |
| Nov 2025 | Blk 130 · 4 ROOM | S$3,400 | — |
| Nov 2025 | Blk 125 · 4 ROOM | S$3,400 | — |
| Nov 2025 | Blk 141 · 4 ROOM | S$3,400 | — |
| Nov 2025 | Blk 116 · 3 ROOM | S$3,350 | — |
| Nov 2025 | Blk 103 · 5 ROOM | S$3,200 | — |
| Nov 2025 | Blk 120 · 4 ROOM | S$3,050 | — |
| Nov 2025 | Blk 130 · 4 ROOM | S$800 | — |
| Oct 2025 | Blk 135 · 5 ROOM | S$4,100 | — |
| Oct 2025 | Blk 118 · 4 ROOM | S$3,950 | — |
| Oct 2025 | Blk 105 · 4 ROOM | S$3,950 | — |
| Oct 2025 | Blk 125 · 4 ROOM | S$3,900 | — |
| Oct 2025 | Blk 135 · 5 ROOM | S$3,800 | — |
| Oct 2025 | Blk 130 · 4 ROOM | S$3,700 | — |
| Oct 2025 | Blk 113 · 4 ROOM | S$3,600 | — |
| Oct 2025 | Blk 123 · 4 ROOM | S$3,520 | — |
| Oct 2025 | Blk 138 · 4 ROOM | S$3,400 | — |
| Oct 2025 | Blk 124 · 4 ROOM | S$3,300 | — |
| Oct 2025 | Blk 138 · 4 ROOM | S$3,150 | — |
| Oct 2025 | Blk 106 · 4 ROOM | S$3,000 | — |
| Oct 2025 | Blk 110 · 3 ROOM | S$2,800 | — |
| Oct 2025 | Blk 121 · 3 ROOM | S$2,150 | — |
| Sept 2025 | Blk 101 · 5 ROOM | S$4,300 | — |
| Sept 2025 | Blk 117 · 5 ROOM | S$4,200 | — |
| Sept 2025 | Blk 128 · 5 ROOM | S$4,000 | — |
| Sept 2025 | Blk 114 · 4 ROOM | S$3,900 | — |
| Sept 2025 | Blk 109 · 4 ROOM | S$3,800 | — |
| Sept 2025 | Blk 111 · 4 ROOM | S$3,750 | — |
| Sept 2025 | Blk 127 · 4 ROOM | S$3,600 | — |
| Sept 2025 | Blk 133 · 3 ROOM | S$2,700 | — |
| Sept 2025 | Blk 116 · 3 ROOM | S$2,600 | — |
| Aug 2025 | Blk 142 · 5 ROOM | S$4,650 | — |
| Aug 2025 | Blk 117 · 5 ROOM | S$4,200 | — |
| Aug 2025 | Blk 124 · 5 ROOM | S$4,150 | — |
| Aug 2025 | Blk 110 · 4 ROOM | S$4,000 | — |
| Aug 2025 | Blk 127 · 4 ROOM | S$3,900 | — |
| Aug 2025 | Blk 109 · 4 ROOM | S$3,900 | — |
| Aug 2025 | Blk 118 · 4 ROOM | S$3,700 | — |
| Aug 2025 | Blk 130 · 4 ROOM | S$3,600 | — |
| Aug 2025 | Blk 122 · 4 ROOM | S$3,600 | — |
| Aug 2025 | Blk 109 · 4 ROOM | S$3,500 | — |
| Aug 2025 | Blk 110 · 3 ROOM | S$3,400 | — |
| Aug 2025 | Blk 105 · 3 ROOM | S$3,200 | — |
| Aug 2025 | Blk 126 · 4 ROOM | S$2,460 | — |
| Jul 2025 | Blk 130 · 4 ROOM | S$4,000 | — |
| Jul 2025 | Blk 127 · 4 ROOM | S$3,900 | — |
| Jul 2025 | Blk 116 · 4 ROOM | S$3,800 | — |
| Jul 2025 | Blk 106 · 4 ROOM | S$3,788 | — |
| Jul 2025 | Blk 105 · 4 ROOM | S$3,750 | — |
| Jul 2025 | Blk 124 · 5 ROOM | S$3,700 | — |
| Jul 2025 | Blk 123 · 4 ROOM | S$3,700 | — |
| Jul 2025 | Blk 113 · 4 ROOM | S$3,600 | — |
| Jul 2025 | Blk 106 · 4 ROOM | S$3,520 | — |
| Jul 2025 | Blk 105 · 4 ROOM | S$3,350 | — |
| Jul 2025 | Blk 116 · 3 ROOM | S$3,300 | — |
| Jul 2025 | Blk 141 · 4 ROOM | S$3,000 | — |
| Jul 2025 | Blk 106 · 4 ROOM | S$2,800 | — |
| Jul 2025 | Blk 140 · 4 ROOM | S$2,500 | — |
| Jun 2025 | Blk 138 · 5 ROOM | S$4,300 | — |
| Jun 2025 | Blk 126 · 5 ROOM | S$4,000 | — |
| Jun 2025 | Blk 122 · 4 ROOM | S$3,900 | — |
| Jun 2025 | Blk 102 · 5 ROOM | S$3,900 | — |
| Jun 2025 | Blk 110 · 4 ROOM | S$3,800 | — |
| Jun 2025 | Blk 114 · 4 ROOM | S$3,800 | — |
| Jun 2025 | Blk 130 · 4 ROOM | S$3,800 | — |
| Jun 2025 | Blk 142 · 4 ROOM | S$3,800 | — |
| Jun 2025 | Blk 130 · 4 ROOM | S$3,700 | — |
| Jun 2025 | Blk 114 · 4 ROOM | S$3,700 | — |
| Jun 2025 | Blk 127 · 4 ROOM | S$3,600 | — |
| Jun 2025 | Blk 110 · 3 ROOM | S$3,100 | — |
| Jun 2025 | Blk 105 · 3 ROOM | S$3,000 | — |
| Jun 2025 | Blk 126 · 5 ROOM | S$1,800 | — |
| May 2025 | Blk 119 · EXECUTIVE | S$4,630 | — |
| May 2025 | Blk 138 · 5 ROOM | S$4,500 | — |
| May 2025 | Blk 128 · 5 ROOM | S$4,200 | — |
| May 2025 | Blk 132 · 4 ROOM | S$4,200 | — |
| May 2025 | Blk 137 · EXECUTIVE | S$4,000 | — |
| May 2025 | Blk 144 · 5 ROOM | S$3,900 | — |
| May 2025 | Blk 108 · 4 ROOM | S$3,800 | — |
| May 2025 | Blk 106 · 4 ROOM | S$3,800 | — |
| May 2025 | Blk 130 · 4 ROOM | S$3,600 | — |
| May 2025 | Blk 129 · 3 ROOM | S$3,500 | — |
| May 2025 | Blk 123 · 4 ROOM | S$3,100 | — |
| May 2025 | Blk 113 · 4 ROOM | S$3,100 | — |
| May 2025 | Blk 105 · 3 ROOM | S$3,000 | — |
| May 2025 | Blk 115 · 3 ROOM | S$2,800 | — |
| May 2025 | Blk 110 · 3 ROOM | S$2,800 | — |
| May 2025 | Blk 107 · 4 ROOM | S$2,600 | — |
| May 2025 | Blk 116 · 3 ROOM | S$1,300 | — |
| Apr 2025 | Blk 144 · 5 ROOM | S$4,200 | — |
| Apr 2025 | Blk 131 · 4 ROOM | S$3,900 | — |
| Apr 2025 | Blk 135 · 5 ROOM | S$3,500 | — |
| Apr 2025 | Blk 126 · 4 ROOM | S$3,300 | — |
| Apr 2025 | Blk 131 · 4 ROOM | S$3,200 | — |
| Apr 2025 | Blk 109 · 4 ROOM | S$3,000 | — |
| Apr 2025 | Blk 118 · 3 ROOM | S$2,800 | — |
| Mar 2025 | Blk 114 · 4 ROOM | S$3,800 | — |
| Mar 2025 | Blk 129 · 4 ROOM | S$3,800 | — |
| Mar 2025 | Blk 137 · EXECUTIVE | S$3,800 | — |
| Mar 2025 | Blk 112 · 4 ROOM | S$3,750 | — |
| Mar 2025 | Blk 136 · 4 ROOM | S$3,700 | — |
| Mar 2025 | Blk 130 · 4 ROOM | S$3,700 | — |
| Mar 2025 | Blk 111 · 4 ROOM | S$3,700 | — |
| Mar 2025 | Blk 130 · 4 ROOM | S$3,700 | — |
| Mar 2025 | Blk 131 · 4 ROOM | S$3,700 | — |
| Mar 2025 | Blk 142 · 4 ROOM | S$3,600 | — |
| Mar 2025 | Blk 109 · 4 ROOM | S$3,500 | — |
| Mar 2025 | Blk 138 · 4 ROOM | S$3,100 | — |
| Mar 2025 | Blk 142 · 4 ROOM | S$3,000 | — |
| Mar 2025 | Blk 104 · 3 ROOM | S$3,000 | — |
| Mar 2025 | Blk 110 · 3 ROOM | S$3,000 | — |
| Mar 2025 | Blk 138 · 4 ROOM | S$2,700 | — |
| Mar 2025 | Blk 138 · 4 ROOM | S$2,300 | — |
| Mar 2025 | Blk 109 · 4 ROOM | S$2,200 | — |
| Feb 2025 | Blk 126 · 5 ROOM | S$4,350 | — |
| Feb 2025 | Blk 142 · 5 ROOM | S$4,100 | — |
| Feb 2025 | Blk 102 · 5 ROOM | S$4,000 | — |
| Feb 2025 | Blk 142 · 5 ROOM | S$4,000 | — |
| Feb 2025 | Blk 144 · 5 ROOM | S$3,500 | — |
| Feb 2025 | Blk 107 · 4 ROOM | S$3,500 | — |
| Feb 2025 | Blk 122 · 4 ROOM | S$3,300 | — |
| Feb 2025 | Blk 111 · 4 ROOM | S$3,200 | — |
| Feb 2025 | Blk 105 · 3 ROOM | S$2,900 | — |
| Feb 2025 | Blk 105 · 3 ROOM | S$2,800 | — |
| Jan 2025 | Blk 117 · 5 ROOM | S$4,900 | — |
| Jan 2025 | Blk 134 · EXECUTIVE | S$4,600 | — |
| Jan 2025 | Blk 117 · 5 ROOM | S$4,200 | — |
| Jan 2025 | Blk 113 · 4 ROOM | S$4,200 | — |
| Jan 2025 | Blk 109 · 4 ROOM | S$3,800 | — |
| Jan 2025 | Blk 112 · 4 ROOM | S$3,800 | — |
| Jan 2025 | Blk 129 · 3 ROOM | S$3,500 | — |
| Jan 2025 | Blk 110 · 3 ROOM | S$3,300 | — |
| Jan 2025 | Blk 114 · 4 ROOM | S$3,200 | — |
| Jan 2025 | Blk 140 · 4 ROOM | S$3,200 | — |
| Jan 2025 | Blk 116 · 3 ROOM | S$1,600 | — |
| Dec 2024 | Blk 128 · 5 ROOM | S$4,300 | — |
| Dec 2024 | Blk 128 · 5 ROOM | S$4,100 | — |
| Dec 2024 | Blk 144 · 5 ROOM | S$4,000 | — |
| Dec 2024 | Blk 127 · 5 ROOM | S$3,700 | — |
| Dec 2024 | Blk 114 · 4 ROOM | S$3,700 | — |
| Dec 2024 | Blk 128 · 5 ROOM | S$3,600 | — |
| Dec 2024 | Blk 109 · 4 ROOM | S$3,600 | — |
| Dec 2024 | Blk 109 · 4 ROOM | S$3,500 | — |
| Dec 2024 | Blk 142 · 4 ROOM | S$3,300 | — |
| Dec 2024 | Blk 116 · 3 ROOM | S$3,300 | — |
| Dec 2024 | Blk 105 · 3 ROOM | S$3,300 | — |
| Dec 2024 | Blk 114 · 4 ROOM | S$3,000 | — |
| Dec 2024 | Blk 110 · 3 ROOM | S$3,000 | — |
| Dec 2024 | Blk 122 · 4 ROOM | S$2,800 | — |
| Dec 2024 | Blk 132 · 3 ROOM | S$2,600 | — |
| Dec 2024 | Blk 144 · 4 ROOM | S$2,500 | — |
| Dec 2024 | Blk 110 · 3 ROOM | S$1,500 | — |
| Nov 2024 | Blk 144 · 5 ROOM | S$4,300 | — |
| Nov 2024 | Blk 127 · 5 ROOM | S$4,200 | — |
| Nov 2024 | Blk 126 · 5 ROOM | S$4,200 | — |
| Nov 2024 | Blk 130 · 4 ROOM | S$4,200 | — |
| Nov 2024 | Blk 107 · 4 ROOM | S$4,100 | — |
| Nov 2024 | Blk 142 · 5 ROOM | S$4,000 | — |
| Nov 2024 | Blk 122 · 4 ROOM | S$4,000 | — |
| Nov 2024 | Blk 128 · 5 ROOM | S$3,800 | — |
| Nov 2024 | Blk 114 · 4 ROOM | S$3,800 | — |
| Nov 2024 | Blk 122 · 4 ROOM | S$3,700 | — |
| Nov 2024 | Blk 111 · 4 ROOM | S$3,600 | — |
| Nov 2024 | Blk 140 · 4 ROOM | S$3,500 | — |
| Nov 2024 | Blk 135 · EXECUTIVE | S$3,500 | — |
| Nov 2024 | Blk 111 · 4 ROOM | S$3,500 | — |
| Nov 2024 | Blk 142 · 4 ROOM | S$3,400 | — |
| Nov 2024 | Blk 110 · 3 ROOM | S$3,000 | — |
| Nov 2024 | Blk 105 · 3 ROOM | S$2,800 | — |
| Nov 2024 | Blk 107 · 4 ROOM | S$2,200 | — |
| Nov 2024 | Blk 116 · 3 ROOM | S$2,000 | — |
| Oct 2024 | Blk 124 · 4 ROOM | S$4,100 | — |
Showing 300 of 894.
Rents as approved by HDB, or as filed with URA for private homes, where the floor area is given as a band.
4-Room resale prices in Bishan
Embed these figures on your site
Free to use with the link intact. The card updates when the data does.