Blk 154 Pasir Ris St 13
Latest recorded sale 1 Nov 2022 · 14 resales recorded at Blk 154 Pasir Ris St 13 since 2006.
What is a flat at Blk 154 Pasir Ris St 13 worth?
No flat at Blk 154 Pasir Ris St 13 has sold in the last 24 months, so the value below comes from comparable sales on Pasir Ris St 13.
A typical executive flat at Blk 154 Pasir Ris St 13 (144 sqm) is valued at S$794,880 to S$835,520, from 5 comparable sales on Pasir Ris St 13 in the last 12 months with a similar lease left. This is an indicative estimate, not a formal valuation.
S$5,520 psm to S$5,802 psm · 5 comparable sales · See every comparable sale, or change the size and floor
How has the price at Blk 154 Pasir Ris St 13 changed?
Value a unit here
Change the size or floor for an indicative range for this block, or type another address or postal code.
What flats are in Blk 154 Pasir Ris St 13?
| Type | In block | Sold | Median |
|---|---|---|---|
| EXECUTIVE | 28 | 4 | S$635,000 |
| Total | 28 | 4 |
Stock: HDB Property Information, read 2 Nov 2026. Sales and medians: homequant engine.
What has sold at Blk 154 Pasir Ris St 13 recently?
| Date | Detail | Area | Price | Per area |
|---|---|---|---|---|
| Nov 2022 | Blk 154 · EXECUTIVE · 04 TO 06 · Apartment · 71 years left | 146 sqm | S$757,000 | S$5,185 psm |
Showing 1 of 14.
Sale prices as filed in caveats.
| Period | Detail | Monthly rent | Per area |
|---|---|---|---|
| Oct 2025 | Blk 154 · EXECUTIVE | S$3,800 | — |
| Oct 2025 | Blk 154 · EXECUTIVE | S$3,800 | — |
Rents as approved by HDB, or as filed with URA for private homes, where the floor area is given as a band.
Buying or selling here?
Buying: Stamp duty · Cash and CPF needed · How much can I borrow · Monthly repayment.
Selling: Net proceeds from selling.
Nearby blocks
- Blk 155 Pasir Ris St 13 · 35 m · 9 sales
- Blk 150 Pasir Ris St 13 · 65 m · 8 sales
- Blk 153 Pasir Ris St 13 · 76 m · 7 sales
- Blk 151 Pasir Ris St 13 · 91 m · 14 sales
- Blk 156 Pasir Ris St 13 · 102 m · 5 sales
Pasir Ris St 13 — full project history · Executive resale prices in Pasir Ris · Completed in 1994